| Location: | West Virginia |
|---|---|
| Posted: | Jun 5, 2026 |
| Due: | Jun 17, 2026 |
| Agency: | AGRICULTURE, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 12FPC326B0010 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Please see attachments and comibined synopsis solicitaiton for further deatails.
Kanawha County EWP 5091-001 Streambank Stabilization Sharon Hollow and Ohley Hollow Road for USDA NRCS-WV.
The project consists of clearing designated areas by the removal and disposal of trees, logs, stumps, shrubs, brush, and rubbish and the shaping of the channel.
Installing measures or performing work to control erosion and minimize the production of sediment and
other pollutants to water and air from construction activities.
Preparing the area for treatment; furnishing and placing seed, sprigs, mulch, fertilizer, inoculant, lime, and
other soil amendments; and anchoring mulch in designated areas as specified.
The work consists of the mobilization and demobilization of the contractor’s forces and equipment
necessary for performing the work required under the contract.
Establishing traffic control and maintaining safe, convenient use of public roads and right of way.
Removal of surface water and ground water as necessary to perform the construction required by the
contract in accordance with the specifications. It must include: (1) constructing, installing, building, and
maintaining all necessary temporary water containment facilities, channels, and diversions; (2) furnishing,
installing, and operating all necessary pumps, piping, and other facilities and equipment; and (3)
removing all such temporary works and equipment after their intended function is no longer required.
Excavation required by the drawings and specifications, as well as the disposal of the excavated materials.
Construction of earth embankments, other earthfills, and earth backfills required by the drawings and
specifications.
*See Specifications document attached to posting for full details of required work.
| May 18, 2026 | [Combined Synopsis/Solicitation (Updated)] NRCS-WV Ohio County EWP Streambank Stabilization Sharon Hollow and Ohley Hollow Road |
| May 21, 2026 | [Combined Synopsis/Solicitation (Updated)] NRCS-WV Kanawha County EWP Streambank Stabilization Sharon Hollow and Ohley Hollow Road |

With GovernmentContracts, you can:
Description: Court Reporting Services Department: OIL AND GAS CONSERVATION COMMISSION Buyer: Susan W
State of West Virginia
Bid Due: 6/23/2026
Description: ASPHALT CRACK SEALANT for DISTRICT ONE Department: DIVISION OF HIGHWAYS Buyer: John
State of West Virginia
Bid Due: 6/17/2026
Follow Z1DA-- Halls and Walls (SECVA) - Construction Project Number 540-26-110 Active Contract
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 7/09/2026
Follow J041--RTAA Chiller Replacement and Removal-Martinsburg VA Medical Center Active Contract Opportunity Notice
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/10/2026