| Location: | North Carolina |
|---|---|
| Posted: | Jul 16, 2025 |
| Due: | Aug 12, 2025 |
| Agency: | City of Charlotte |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | FY26-ITBCON-12 |
| Publication URL: | To access bid details, please log in. |
Project Description: Work performed under this contract will consist of storm water infrastructure repair and improvement projects within the city limits of Charlotte, NC. Work will involve mobilization, earthwork, drainage structures, storm drain pipe systems, channels, working over, under, near, and around existing private utilities, asphalt paving, concrete flatwork, and landscaping and any associated work required by the Engineer. Other work may include structural foundation protection, storm water pipe lining, storm water pipe joint and structure repair, water and sewer (relocations, installations and adjustments). Storm Water maintenance work may be located entirely within or a combination of the street right-of-way, private, residential and commercial properties.

With GovernmentContracts, you can:
...Project: Collective Storm Drainage Improvement Project (SDIP) - Series W. Ref. #: FY27-ITBCon-13...@charlottenc.gov ...
City of Charlotte
Bid Due: 8/06/2026
...Project: Collective Storm Drainage Improvement Project (SDIP) - Series W. Ref. #: FY27-ITBCon-13...@charlottenc.gov ...
City of Charlotte
Bid Due: 8/06/2026
...manholes, 700 LF of storm drainage with structures, including new, parallel replacements, replace..., ...
City of Durham
Bid Due: 8/12/2026
...for the bridge replacement. The Design-Build Team shall be responsible for all storm ...
Division of Highways
Bid Due: 8/18/2026