| Location: | California |
|---|---|
| Posted: | Sep 3, 2025 |
| Due: | Sep 18, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W91QF425Q0037 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Fiber Optic Cable Installation Requirements
1. Starting Point (Building 209 - Communication Room):
o Install an LC adapter panel in the northwest corner of the communication room, adjacent to the .EDU switch rack.
o Route the fiber optic cable along the upper wall, adjacent to the adapter panel, into the next room where the conduit entry is located.
2. Conduit Routing:
o Utilize the pre-installed 60-foot underground conduit connecting Building 209 and Building 208.
o Use the pre-installed pull string/rope/tape to guide the fiber optic cable through the conduit.
o Ensure the existing duct seals at both conduit ends remain intact to maintain waterproofing and firestopping standards.
3. Routing in Building 208 (Theater):
o Upon entry into the mechanical room, route the fiber cable through the wall to the left of its entry point.
o Secure the cable along the wooden ceiling within the crawl space beneath the theater for approximately 100 feet.
o Transition the cable vertically at the north end of the building through an unused airshaft into the lobby preceding the projector room.
4. Termination and Enclosure (Projector Room Lobby):
o Install a 6-port LC fiber adapter panel adjacent to an electrical outlet on the south side of the projector room lobby.
o Mount the fiber optic cable in the specified low-profile, switch-depth wall-mount mini rack enclosure.
| Sep 30, 2025 | [Award Notice (Updated)] Award Notice - Amendment-002 - Install Fiber Building(s) 208-209 |

With GovernmentContracts, you can: