| Location: | Texas |
|---|---|
| Posted: | Sep 3, 2025 |
| Due: | Sep 11, 2025 |
| Agency: | City of Fort Worth |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25-0218 |
| Publication URL: | To access bid details, please log in. |
Project Description: Preselection of the following equipment is included in Mary's Creek Water Reclamation Facility - Preselection Package 2:
1. Equalization and Peak Flow Storage Basin mixing systems (chopper pumps and mixing nozzles).
2. Coarse screens with associated sluice system and washer/compactors.
3. Grit removal equipment with associated grit washers and pumps.
4. Fine screens with associated screening conveying system.
5. Ultraviolet (UV) disinfection system.
6. Centrifuge dewatering system.
The scope of work for each Preselected Equipment Supplier (PES) will include the following:
1. Furnish equipment system as defined in the technical specifications.
2. Provide services during the design phase to develop shop drawings for equipment system and
assist the Design Engineer in developing the overall facility design.
3. Coordinate with the General Contractor during construction and startup of the equipment system.
4. Equipment system integration, start-up, and testing services.
5. Other work as prescribed in the specifications.

With GovernmentContracts, you can:
...Equipment, Accessories And Supplies (Not Otherwise Classified); 89003-Back Flow Preventers For Water/Sewer...-Plumbing Fixtures ...
State Government of Texas
Bid Due: 10/21/2026
...Salmon Waste Water Treatment Plant - Miscellaneous Improvements CIP # WW2103C Bid #26-048 ...
City of League City
Bid Due: 9/23/2026
...Salmon Waste Water Treatment Plant - Miscellaneous Improvements CIP # WW2103C Bid #26-048 ...
City of League City
Bid Due: 10/01/2026
.../2026 Due Date: 10/15/2026 Follow KYLE WWTP EXPANSION PHASE 2, FULL WORKS PACKAGE ...
City of Kyle
Bid Due: 10/15/2026