| Location: | Nevada |
|---|---|
| Posted: | Jun 20, 2025 |
| Due: | Aug 7, 2025 |
| Agency: | AGRICULTURE, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 1240LT25R0022 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
This is a PRESOLICITATION announcement.
The solicitation is anticipated to be posted to Contract Opportunities on SAM.gov on or around July 7 , 2025.
No responses are required at this time.
SCOPE OF CONTRACT
A. This project includes drilling a new potable water well at Mountain Springs on the Spring Mountains National Recreation Area on the Humboldt-Toiyabe National Forest. The project is identified in the schedule of items. The drawings and specifications provide more definition of the work required under each work item.
B. The work includes mobilization, well drilling, well casing, concrete grout, well screen, well accessories, developing well, well performance testing, and water analysis. Permits are considered incidental and will not be paid for separately.
C. Optional work that may be awarded includes all work described above associated with:
D. Quantities associated with these options are identified in the Schedule of Items.
PROJECT LOCATION
The project is located in the Spring Mountains National Recreation Area of the Humboldt-Toiyabe National Forest, Clark County, Nevada, in T22S, R58E, 21. It is located approximately 21 miles west of Las Vegas, NV and 15 miles south of Pahrump, NV. The project may be accessed from State Highway 160 and Lovell Canyon Road.
MAGNITUDE OF CONSTRUCTION PROJECT
In accordance with FAR 36.204 (d), the estimated magnitude for this project is between $250,000 and $500,000.
SITE INFORMATION AND LIMITATIONS
A. The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items:
TRAFFIC CONTROL AND CONSTRUCTIN SIGNING
No work that endangers, interferes, or conflicts with traffic or access to work sites shall be performed until a plan for satisfactory warning and handling of traffic has been submitted by the contractor and approved by the COR and Nevada Department of Transportation. Construction signing for traffic control shall conform to the Manual of Uniform Traffic Control Devices (MUTCD). All traffic control signs will be placed in areas adequate for a truck pulling a fifth wheel trailer to be turned around. Contractor shall not be paid directly for this item, rather it will be considered incidental to other items of work listed in the Schedule of Items.
WORK CAMPS, STAGING AND STORAGE AREAS
A. Areas for staging operations and storage of materials shall be approved by the CO. The Contractor must request in writing for approval from the CO to stage trailers (work) on site.
B. No overnight camping will be allowed on site.
INSPECTION OF WORKSITE
The contractor acknowledges they have taken the necessary steps to ascertain the nature and location of work and have investigated and satisfied themselves as to the general and local conditions that can affect the work or its cost. Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from the responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the government.
START DATE
Estimated start date is 9/2/2025. . A site visit will be detailed on the full solicitation.
CONTRACT TIME
A. Base: 60 Calendar Days from issuance of Construction Notice To Proceed
B. Option #1: 7 Additional Calendar Days
SPECIFICATIONS
A. The following specifications are attached. Some sections in the schedule of items refer to other sections not listed and are subsidiary to or are included in payment for other pay items in this contract. These items are considered incidental, and no additional compensation will be made.
SECTION 011250 - MEASUREMENT AND PAYMENT
SECTION 011900 - MOBILIZATION
SECTION 013300 - SUBMITTAL PROCEDURES
SECTION 014100 - QUALITY CONTROL
SECTION 023701 - SEDIMENT AND EROSION CONTROL MEASURES
SECTION 024100 - WASTE MATERIAL DISPOSAL
SECTION 311000 - CLEARING AND GRUBBING
SECTION 332100 - WATER SUPPLY WELLS
BONDING:
All offerors will be required to provide a Bid Bond (20%) with their proposal submission. Performance and Payment Bonds (100% each) will be required of the successful awardee.
| Jul 7, 2025 | [Solicitation (Original)] Lovell Well Construction Project |
| Jul 18, 2025 | [Solicitation (Updated)] Lovell Well Construction Project |
| Jul 21, 2025 | [Solicitation (Updated)] Lovell Well Construction Project |
| Jul 28, 2025 | [Solicitation (Updated)] Lovell Well Construction Project |
| Jul 30, 2025 | [Solicitation (Updated)] Lovell Well Construction Project |
| Aug 6, 2025 | [Solicitation (Updated)] Lovell Well Construction Project |
| Aug 9, 2025 | [Solicitation (Updated)] Lovell Well Construction Project |

With GovernmentContracts, you can:
Follow Z2DA--Solicitation No. 36C26126R0041 Project 593-26-103, Renovate Education Building Training Hub Active Contract
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/08/2026
xSolicitation: RFB #94-B-02-26-TL Status: Active Title: Districtwide Water Treatment Services Scope of Work/Services:
Washoe County School District
Bid Due: 7/09/2026
Location Details Site Address: 100 North Carson Street City: Carson City County: Carson
State Government of Nevada.
Bid Due: 6/16/2026
Rosewood Lakes Nature Study Concessionaire Department: Finance RFP Number: RFP 2026-09 Start Date:
City of Reno
Bid Due: 6/18/2026