| Location: | Washington |
|---|---|
| Posted: | Jun 20, 2025 |
| Agency: | County of Clark |
| Type of Contract: | Awards |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The project consists of excavation to original liner depth, furnishing and installing a new liner, sand drainage layer with geotextile layer and topsoil followed by seeding. Connect to existing drainpipe and extend to new liner limits and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and Standard Specifications.

With GovernmentContracts, you can:
...of approximately 1300 square yards of pavement repair excavation including haul, 70 linear ...
City of Spokane
Bid Due: 6/15/2026
...of pavement repair excavation including haul, 70 linear feet of storm sewer, 5 ...
City of Spokane
Bid Due: 6/15/2026
...of pavement repair excavation including haul, 70 linear feet of storm sewer, 5 ...
City of Spokane
Bid Due: 6/15/2026
...of widening the intersection of SE 136th Avenue and Mill Plain Boulevard including ...
City of Vancouver
Bid Due: 2/02/2045