| Location: | Hawaii |
|---|---|
| Posted: | Feb 26, 2026 |
| Due: | Mar 26, 2026 |
| Agency: | General Contractors Association |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project Description: The work consists of removing the existing track surface, site preparation, installing a new synthetic track surfacing, and concrete work.
| Download |
|
Plans
Specifications
|
Addendums/Amendments
Addendum No. 3 Maui HS P55036-24.pdf
|

With GovernmentContracts, you can:
...-foot conditioned storage container, including necessary site preparation, shelving installation... to email the ...
COMMERCE, DEPARTMENT OF
Bid Due: 7/07/2026
...which includes preparation of temporary construction staging and dewatering areas; dredging... sediments to ...
DEPT OF DEFENSE
Bid Due: 6/30/2026
...which includes preparation of temporary construction staging and dewatering areas; dredging... sediments to ...
DEPT OF DEFENSE
Bid Due: 7/30/2026
...PREPARATION OF RESPONSES TO THIS ANNOUNCEMENT. ANY INFORMATION SUBMITTED BY RESPONDENTS TO THIS... ...
DEPT OF DEFENSE
Bid Due: 6/30/2026