OPS - 500 Generator

Location: Pennsylvania
Posted: Jun 1, 2025
Due: Jun 13, 2025
Agency: PennBid
Type of Government: State & Local
Category:
  • 61 - Electric Wire, and Power and Distribution Equipment
Solicitation No: Collegium Charter School, Chester County, PA
Publication URL: To access bid details, please log in.
Project: OPS - 500 Generator
Ref. #: Collegium Charter School, Chester County, PA
Type: IFB
Status:
Open
Open Date: May 30th 2025, 9:00 AM EDT
Questions Due Date: Jun 6th 2025, 12:00 PM EDT
Close Date: Jun 13th 2025, 3:00 PM EDT
Contract Type:
Fixed Fee Contract
County, State:
Chester County, PA

Project Description: Release Date: Friday, May 30, 2025 @ 9:00am
Response Date: Friday, June 13, 2025 @ 3:00pm
Project start date: ASAP upon contract acceptance
Appointments available for site visit on June 5th & 6th after 2:00pm.
Contractor will provide all necessary labor, materials and equipment to perform the following:
1. Supply and install one (1) new 80kw natural gas generator with the following options:
standby 80kW natural gas generator, 208/120 volts, three-phase, 4-wire 60Hz, 1800 RPM
one (1) 300amp Circuit Breaker, 3-pole, 600-volt AC, 80% UL
1" flexible fuel line and strainer
Aluminum sound attenuated enclosure
Deep Sea controller
Battery charger w/rack and cables
2-year Base Warranty
Operation & maintenance manuals
2. Supply and install one (1) new ASCO 400amp, 208/120-volt, 3-phase, 4-wire,3-pole, open-transition, Automatic Transfer Switch in a NEMA 3R enclosure with the following options:
Source available lights
Manual by-pass of transfer
Automatic engine exerciser
ATS position indicating contacts
Heater w/ thermostat
3. Install the new ATS on the exterior of the building near the generator location.
4. Intercept the existing circuit feeding panels KP-1 and KP-2 and extend to the new ATS.
5. Supply and install new line and load conduits and cables from the KP-1 panel to the new ATS.
6. Supply and install new conduits and cables from the ATS to the generator as required.
7. Supply and install one (1) new conduit and cables from panel KP-1 to the generator for the block heater and battery charger circuits.
8. Supply and install new gas piping, valves and pressure regulator as required to extend the existing gas line to the new generator.
9. Provide the necessary crane and rigging to install the new generator.
10. Perform start up and commissioning on he newly installed equipment.
The Pennsylvania Prevailing Wage Act (PA PWA) requires that contractors and subcontractors on public works projects in Pennsylvania pay their workers at least the prevailing wage rates for their respective crafts or classifications. Collegium Charter School is publicly funded and therefore falls under the Pennsylvania Prevailing Wage Act.
Contract Terms:
25% deposit upon contract acceptance.
Net 30 days after project completion.
All documents and solicitation details are available at no cost on PennBid – (https://pennbid.bonfirehub.com)
Collegium Charter School reserves the right to reject any and all bids and to accept the bid which is in the best interest of Collegium Charter School.


Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.