| Location: | Georgia |
|---|---|
| Posted: | May 14, 2026 |
| Due: | Jun 18, 2026 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-33821-NONST-2026-000000002 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-33821-NONST-2026-000000002 | Water System Improvements | Notla Water Authority |
May 14, 2026 @ 10:54 AM
|
Jun 18, 2026 @ 02:00 PM
|
Start Date: May 14, 2026 @ 10:54 AM ET
End Date:
Jun 18, 2026 @ 02:00 PM ET
The work to be done consists of furnishing all materials, equipment and labor for the construction of:
Division One: Approximately 2,400 linear feet of 6-inch (6") water line and 6-inch (6") meter vault.
Division Two: One (1) above ground water booster pump station complete with appurtenances.
| Code | Description |
| 91360 | Construction, Water System, Plants, Main and Service Line |
| 89044 | Meters, Water |
| 89003 | Back Flow Preventers for Water and Sewer Pipe |
| 89040 | Meter Boxes, Meter Vaults, and Valve Boxes (See 210-45 for Concrete Type) |
| 72012 | Booster or Circulating Pumps, In-Line |
| 65891 | Tubing, Plastic and PVC |
| 65880 | Pipe, Steel, Stainless Steel and Wrought Steel |
| 65856 | Pipe, Plastic, Including Fiber Reinforced Plastic Pipe, Polybutylene Pipe, PVC |
Faith Hudson
atladmin@turnipseed.com
770-333-0700
ADVERTISEMENT FOR BIDS FOR CONSTRUCTION OF
WATER SYSTEM IMPROVEMENTS
for the
, GEORGIA
Sealed proposals will be received by at the , until p.m. local time, at which time and place they will be publicly opened and read. No submitted bid may be withdrawn after the scheduled closing time for receipt of bids for a period of sixty (60) days.
All Bidders must have a State of Georgia Utility Contractor License and must employ a state "Utility Manager" certificate holder who will have oversight of all the work.
The work to be done consists of furnishing all materials, equipment and labor for the construction of:
Time allotted for construction is consecutive calendar days for substantial completion and days for final completion
Proposals for the complete work in one general contract shall be made on the proposal form provided and shall contain prices in words and figures for the work bid on.
All proposals shall be accompanied by a Bid Bond drawn in favor of the , in the amount of at least % of the lump sum bid for the complete work; such Bid Bond representing that the Bidder, if awarded the contract, will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and approved by the Attorney for the . Each bond shall be equal to 100% of the contract amount. The Bid Bond shall be forfeited to the as liquidated damages if the Bidder fails to execute the contract and provide Performance and Payment Bonds within 10 days after being notified that he has been awarded the contract.

With GovernmentContracts, you can:
BID NAME: South Gwinnett High School - New Field House BID DATE: 08/13/2026
Gwinnett County Public Schools
Bid Due: 8/13/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-69200-NONST-2027-000000052
State Government of Georgia
Bid Due: 8/17/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-72200-NONST-2027-000000084
State Government of Georgia
Bid Due: 8/13/2026
Bid Title: Request for Proposal For Engineering Services CDBG 2026 Category: Purchasing Status:
Lowndes County
Bid Due: 8/17/2026