Request for Proposal- Advanced Metering Infrastructure

Location: Missouri
Posted: Sep 16, 2026
Due: Oct 9, 2026
Agency: City of Kirksville
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Publication URL: To access bid details, please log in.
  • Request for Proposal- Advanced Metering Infrastructure Posted: Sep 16
  • Request for Proposals (RFP)
    Advanced Metering Infrastructure (AMI)
    Water Meter System

    The City of Kirksville, Missouri (City), requests proposals from qualified firms to furnish, install, and place into service a citywide Advanced Metering Infrastructure (AMI) water meter system, including water meters, communication endpoints, network infrastructure, head-end software, installation, training, and ongoing support. The City has approximately 7,979 water meters. The City will accept proposals until 4:00 p.m. local time on Friday, October 9, 2026, at:

    City of Kirksville
    TO: Mandy Ledford, City Clerk
    mledford@kirksville.gov

    RE: AMI Water Meter System RFP

    Questions regarding this Request for Proposals should be directed to Adam Dorrell, Director of Public Works, via email at adorrell@kirksville.gov. Answers will be provided directly to the inquiring firm and will be accessible to all interested parties. Should a change in this RFP be necessary, such change will be posted as an amendment under the open bids section of the City’s website at www.kirksville.gov.

    The City retains the right to amend this Request for Proposals at any time up to and including the day of submission. The City reserves the right to waive any irregularities and/or reject any and all submittals. The City is under no obligation to award a contract to any submitting firm. The City shall not be responsible for any costs incurred in the preparation, submittal, and presentation of proposals. All materials submitted shall become the property of the City and shall be subject to the laws and regulations relating to the disclosure of public information. No guarantee of privacy or confidentiality is offered or implied.

    The award will be made to the firm whose proposal and project approach are deemed most advantageous to the City of Kirksville, all factors considered.

    Complete request for proposal document can be found here.

    Attachment Preview

    Request for Proposals (RFP)
    Advanced Metering Infrastructure (AMI)
    Water Meter System
    The City of Kirksville, Missouri (City), requests proposals from qualified firms to furnish, install,
    and place into service a citywide Advanced Metering Infrastructure (AMI) water meter system,
    including water meters, communication endpoints, network infrastructure, head-end software,
    installation, training, and ongoing support. The City has approximately 7,979 water meters.
    The City will accept proposals until 4:00 p.m. local time on Friday, October 9, 2026, at:
    City of Kirksville
    TO: Mandy Ledford, City Clerk
    mledford@kirksville.gov
    RE: AMI Water Meter System RFP
    Questions regarding this Request for Proposals should be directed to Adam Dorrell, Director
    of Public Works, via email at adorrell@kirksville.gov. Answers will be provided directly to the
    inquiring firm and will be accessible to all interested parties. Should a change in this RFP be
    necessary, such change will be posted as an amendment under the open bids section of the
    City's website at www.kirksville.gov.
    The City retains the right to amend this Request for Proposals at any time up to and including
    the day of submission. The City reserves the right to waive any irregularities and/or reject any
    and all submittals. The City is under no obligation to award a contract to any submitting firm.
    The City shall not be responsible for any costs incurred in the preparation, submittal, and
    presentation of proposals. All materials submitted shall become the property of the City and
    shall be subject to the laws and regulations relating to the disclosure of public information. No
    guarantee of privacy or confidentiality is offered or implied.
    The award will be made to the firm whose proposal and project approach are deemed most
    advantageous to the City of Kirksville, all factors considered.
    1

    I. Project Information
    The City of Kirksville is a municipality in Adair County, Missouri, with a population of
    approximately 18,000. The City operates water and sanitary sewer utilities. Water is treated
    at the City's surface-water treatment plant and distributed to City water customers. The City
    has approximately 7,979 water meters.
    As part of a proactive asset-management and metering-modernization strategy, the City seeks
    a qualified firm to furnish and install a complete AMI water meter system that will replace the
    City's existing meters with high-accuracy, remotely readable meters and provide a
    communications network and software platform capable of hourly reads, alarms, and
    analytics. Through this project, the City intends to:
    - Improve billing accuracy and low-flow capture
    - Reduce non-revenue water
    - Enable remote reads, leak detection, and tamper alerts
    - Support customer service and conservation programs
    - Reduce manual meter reading and field visits
    The City's billing system is Tyler Technologies' ERP PRO (Incode). The proposed AMI
    software must integrate with, or export usage data to, ERP PRO (Incode) - at minimum
    through an acceptable export file (CSV and fixed-width text).
    II. Scope of Work
    The successful proposer shall provide all labor, equipment, software, and services required to
    deliver a fully functional, city-wide AMI water metering system. The City is seeking a turnkey
    solution. This section states the City's functional requirements; proposers should describe how
    their proposed system meets each and may propose alternatives where they offer better
    value.
    A. Water Meters
    Proposed meters shall meet or exceed the following minimum requirements:
    * Sizes to cover the City's inventory
    * High-accuracy measurement suitable for potable water metering, with strong low-
    flow capture
    * Lead-free and compliant with applicable AWWA and NSF/ANSI 61 & 372 standards
    * Suitable for the range of installation conditions found in the City's system
    * Long-service-life design with a minimum 20-year accuracy and battery-life warranty
    for residential meters (see Section V)
    Proposers shall state the meter technology offered (e.g., solid-
    state/ultrasonic/electromagnetic, or mechanical) and explain its accuracy, longevity, and
    maintenance characteristics.
    B. Endpoint / Meter Functions
    Endpoints shall support, at a minimum:
    2

    * Hourly consumption reads (24 reads per day) with local data storage
    * Continuous-flow (leak) detection
    * High-flow, reverse-flow, and empty-pipe alarms
    * Tamper detection
    * Low-battery alerts
    C. Communications Network - Architecture Open
    The City is not prescribing a single network architecture. Proposers may propose a fixed-base
    radio network, a cellular-direct (per-endpoint) network, a hybrid of the two, or another proven
    approach. For whatever architecture is proposed, the proposal shall clearly describe:
    * The overall network design and how data travels from the meter to the City's head-
    end
    * Any City-provided infrastructure required (e.g., collector/base-station sites, power,
    backhaul, tower or building access)
    * The backhaul method(s) used to connect collectors or endpoints to the head-end,
    and any recurring communications charges
    * Coverage, redundancy, and failover characteristics
    * All recurring or subscription costs associated with the architecture over a 20-year
    period (to be carried into the Price Proposal Form)
    Because ongoing cost varies widely between architectures, proposers must ensure that every
    recurring cost of their proposed approach is captured in the Price Proposal Form so the City
    can compare proposals on a total-cost basis.
    Propagation Study. All proposers shall include a preliminary RF propagation (coverage) study
    for the City's service area with their proposal. For fixed-base or hybrid networks, the study
    shall identify anticipated collector/base-station locations, projected coverage and read
    success, and any City-provided sites or infrastructure assumed. For cellular-direct networks,
    the study shall demonstrate expected carrier coverage, signal strength, and read success
    across the City's service area. The study is informational and will be used by the City to
    evaluate the reliability of the proposed design; the estimated quantities in the Price Proposal
    Form are fixed and will not be adjusted based on the study.
    D. Data & Software
    The proposed system shall provide:
    * A head-end and meter data management platform (cloud-hosted or City-hosted -
    state which)
    * Consumption visualization, alarm dashboards, and user-defined reporting
    * Integration with, or export to, Tyler ERP PRO (Incode) as described in Section I
    E. Ownership & Management Options
    If the proposer offers more than one ownership or management model - for example, a City-
    owned system versus a fully vendor-managed (network-as-a-service) model - the proposer
    should describe and separately price each option offered so that the City can evaluate them
    on equal footing.
    3

    F. Optional Remote Shut-Off Meters
    The City may elect to equip a portion of its meters with an integrated remote shut-off valve
    (and, if available, reduced-flow mode and pressure/temperature sensing). Proposers shall
    provide separate add-on pricing for these meters on the Price Proposal Form.
    G. Installation
    The proposer shall provide a project schedule and trained installers; remove and dispose of
    old meters; install new meters and endpoints; perform testing and validation; and document
    serial numbers and meter locations. GPS coordinates of each meter shall be provided for
    integration into the City's GIS system.
    Meter locations vary across the City. Meters are located in pits, basements, crawl spaces,
    garages, and other settings. For this proposal, estimated meter quantities have been broken
    into "pit" and "indoor/other" categories (see Attachment A). The contractor shall schedule
    installation appointments when access to a building or secured area is required, provide
    advance notice to customers, document all access attempts, and promptly report inaccessible,
    unsafe, or obstructed meter locations to the City. Contractor personnel shall carry City-
    approved identification and comply with all City requirements governing customer contact,
    entry onto private property, property protection, and conduct while onsite. No contractor shall
    enter an occupied building without the consent of an authorized occupant or other lawful
    authority."
    The proposer shall exercise care to avoid damage to public and private property during
    installation and shall be responsible for repairing or restoring any damage caused by its work.
    The proposer shall investigate, respond to, and resolve any property-owner or renter claim of
    damage arising from the installation for a period of thirty (30) days following the installation at
    that property, and shall maintain a record of all such claims and their resolution available to
    the City upon request.
    H. Training & Support
    The proposer shall provide operator, billing, and customer-service training; complete system
    documentation; warranty support; and ongoing technical support. Describe what is included
    and any recurring support costs.
    III. Submittal Format
    To facilitate review and comparison, proposals shall be organized in the order below. They
    shall be limited to no more than twenty (20) pages, excluding the Price Proposal Form, images,
    and graphs. At a minimum, the following shall be provided:
    1. Company qualifications and experience
    2. System architecture description (including proposed network approach)
    3. Meter specifications
    4. Communications network design
    5. Preliminary RF propagation (coverage) study
    6. Software features and integration approach
    4

    Component Required Warranty
    Meters (residential) 15 years (20 years preferred)
    Batteries 15 years
    Communication endpoints 15 years
    Network / base-station equipment 1 year
    Head-end software Included with service/license

    7. Installation plan and project schedule
    8. Training and support
    9. Warranty terms
    10. References (Section IV)
    11. Completed Price Proposal Form (Attachment A)
    Each proposer shall submit its proposal as a PDF document by the deadline stated on the
    cover of this RFP. Proposals shall be formatted suitable for printing on 8.5" x 11" paper and
    delivered by email to adorrell@kirksville.gov. A duly authorized individual must sign the
    proposal, and the proposal shall state the name of the primary contact for the proposer.
    IV. Experience & References
    Proposers shall provide at least five (5) references of water utilities using the proposed system
    that has been installed or supported by the proposer for over five (5) years. Of these, at least
    two (2) shall be communities of similar size to Kirksville, at least one (1) shall be located in the
    State of Missouri, and at least one (1) shall use Tyler Technologies as their utility billing
    system. For each reference, include the utility's size, how many endpoints are deployed, how
    long the system has been in operation, and a current contact.
    V. Warranty Requirements
    Minimum warranty coverage:
    Component Required Warranty
    Meters (residential) 15 years (20 years preferred)
    Batteries 15 years
    Communication endpoints 15 years
    Network / base-station equipment 1 year
    Head-end software Included with service/license
    Meters shall maintain applicable AWWA accuracy standards for the warranty period.
    VI. Evaluation of Proposals
    An evaluation committee will review each proposal. The award shall be made to the lowest
    and best proposer meeting the technical and contractual requirements; price alone shall not
    control. The City will consider factors including meter technology and accuracy, network
    reliability, software and integration, installation plan and project management, warranty and
    support, vendor experience, and 20-year total cost of ownership. The City may, at its
    discretion, request presentations before making a final selection; if selected, a firm will have
    twenty (20) minutes to present, followed by questions, with the project lead delivering the
    presentation. Interviews may be held in person or via Zoom or MS Teams at the presenter's
    discretion.
    5

    Schedule of Events
    The City has developed the following anticipated schedule. Dates are subject to change.
    - Proposal submission deadline - October 9, 2026
    - Finalists selected - October 21, 2026
    - Presentations (if needed) - Week of November 1
    - Project award - November 23, 2026
    - Estimated completion - December 1, 2027
    VII. Terms & Conditions
    A. Governing Law & Procurement Authority
    This RFP is issued pursuant to the City of Kirksville Purchasing Policy (#31) and all applicable
    provisions of Missouri law. Proposals that do not meet the requirements of this RFP may be
    deemed nonresponsive and rejected. The City reserves the right to reject any or all proposals,
    waive informalities, and award in the City's best interest.
    B. Point of Contact
    Adam Dorrell, PE, Director of Public Works, is the sole point of contact during the RFP and
    selection process. Direct communication with other City staff or members of the City Council
    regarding this RFP will constitute grounds for automatic rejection of that firm's proposal.
    C. Insurance
    The successful proposer shall furnish proof of insurance acceptable to the City before contract
    execution and throughout the project. Minimum requirements:
    * $2,000,000 general liability, listing the City as Additional Insured
    * $1,000,000 Auto
    * Workers' Comp - Statutory Requirements based on size/type of contractor
    * $1,000,000 Employers Liability
    Failure to maintain insurance shall constitute a material breach of contract.
    D. Performance & Payment Bonds
    In accordance with RSMo 107.170, contracts exceeding $50,000 require bonding. The
    selected proposer shall provide a Performance Bond and a Payment Bond, each for 100% of
    the contract amount, issued by a surety licensed in Missouri and rated A- or better.
    E. Sales Tax Exemption
    The City is exempt from Missouri and local sales taxes. Vendors shall not include sales tax in
    pricing; the City will provide exemption certificates as needed.
    6

    F. Federal Work Authorization (E-Verify)
    Pursuant to Missouri law, any contractor receiving more than $5,000 shall provide an affidavit
    of participation in a federal work authorization program and proof of enrollment. Failure to
    provide will disqualify the proposer.
    G. Additional Certifications
    * Debarment & Suspension - proposers must certify they are not suspended or
    debarred from contracting with any federal, state, or local government.
    * Non-Discrimination - the contractor shall comply with all applicable federal and
    Missouri civil rights laws.
    * Out-of-State Vendors - any corporation not domiciled in Missouri must provide a
    Certificate of Authority to Transact Business in Missouri before contract award.
    * The selected contractor and all subcontractors will be required to obtain a City of
    Kirksville Business License.
    H. Contract Execution, Payment & Non-Performance
    No contract shall be binding until approved by City Council, signed by the City Manager,
    verified for insurance and bonding, and supported by a purchase order issued by the Finance
    Department. Unauthorized work performed before contract execution is at the vendor's sole
    risk. Payment shall be made only after goods and services are delivered, inspected, and
    approved, and invoices conform to contract terms. Any change in scope, price, or schedule
    must be approved in writing by the City Manager or City Council as required; no oral
    modifications are valid. On non-performance, the City may invoke the performance bond,
    procure replacement services and charge the contractor, and/or terminate for default;
    remedies are cumulative.
    I. Disputes, Records & Validity
    All procurement disputes shall be submitted in writing to the City Manager within five (5)
    business days; the City Manager's decision shall be final, and Missouri law shall govern. The
    contractor shall retain records for five (5) years and permit City audit on request. Any proposal
    may be withdrawn until the submission deadline; proposals not withdrawn shall constitute an
    irrevocable offer, for ninety (90) days, to provide the services described, or until the City has
    approved one or more proposals.
    7

    ID Meter Size Est. Qty Unit Price Extended Price
    M-01 5/8" (incl. converted 3/4" and unclassified) 7,480 $________ $________
    M-02 1" 209 $________ $________
    M-03 112" 67 $________ $________
    M-04 2" 128 $________ $________
    M-05 3" 57 $________ $________
    M-06 4" 33 $________ $________
    M-07 4" Turbo 3 $________ $________
    M-08 6" 1 $________ $________
    M-09 8" 1 $________ $________
    Subtotal - Meters 7,979 $________
    Item Unit Price Est. Qty Extended Price
    3/4"5/8" conversion hardware & labor (per service) $________ 182 $________
    Subtotal - Conversion Hardware $________
    Item Add-On Unit Price
    Remote shut-off valve - add-on per 5/8" meter $________

    Attachment A
    Price Proposal Form
    AMI Water Meter System - City of Kirksville, Missouri
    All prices shall be tax-exempt and include delivery. The City has approximately 7,979 water meters.
    Estimated quantities below are provided for proposal comparison and may be adjusted at award.
    Provide meter pricing (Section A), the 3/4"-to-5/8" conversion hardware price (Section B), the optional
    remote shut-off add-on (Section C), and installation pricing by location setting (Section E). Include
    every recurring cost of the proposed architecture in Section G so proposals can be compared on a 20-
    year total-cost basis.
    A. Water Meters - by Size
    Note: The City intends to convert all existing 3/4" services to 5/8" meters; the 182 existing 3/4" meters,
    along with 103 meters of unclassified size, are included in the 5/8" quantity below (to be verified in the
    field). Price the conversion hardware separately in Section B.
    ID Meter Size Est. Qty Unit Price Extended
    Price
    M-01 5/8" (incl. converted 7,480 $________ $________
    3/4" and unclassified)
    M-02 1" 209 $________ $________
    M-03 112" 67 $________ $________
    M-04 2" 128 $________ $________
    M-05 3" 57 $________ $________
    M-06 4" 33 $________ $________
    M-07 4" Turbo 3 $________ $________
    M-08 6" 1 $________ $________
    M-09 8" 1 $________ $________
    Subtotal - Meters 7,979 $________
    B. 3/4"-to-5/8" Conversion Hardware
    Per-service hardware (spacer/adapter and any fittings), including all labor to install, required to set a
    5/8" meter in an existing 3/4" setting.
    Item Unit Price Est. Extended
    Qty Price
    3/4"5/8" conversion hardware & labor (per service) $________ 182 $________
    Subtotal - Conversion Hardware $________
    C. Remote Shut-Off - Per-Meter Add-On (Optional)
    Additional price PER METER, on top of the base meter price in Section A, to furnish a meter equipped
    with an integrated remote shut-off valve. The City may elect any quantity; leave quantity blank.
    Item Add-On Unit Price
    Remote shut-off valve - add-on per 5/8" meter $________
    8

    Item Add-On Unit Price
    Remote shut-off valve - add-on per 1" meter $________
    Item Price
    Network infrastructure (base stations/collectors/antennas/backhaul, as applicable) $________
    Head-end / MDMS software (initial license or setup) $________
    System configuration & integration (incl. Tyler ERP PRO / Incode) $________
    Training $________
    Subtotal - Network & Software $________
    ID Install Setting Est. Qty Unit Install Extended Price
    L-01 Pit / Tile 1,686 $________ $________
    L-02 Crawlspace 847 $________ $________
    L-03 Indoors / Other 5,446 $________ $________
    Subtotal - Installation by Setting 7,979 $________
    Item Price
    Testing & commissioning $________
    Other (explain) $________
    Subtotal - Additional Installation $________

    Item Add-On Unit Price
    Remote shut-off valve - add-on per 1" meter $________
    D. Network & Software
    Item Price
    Network infrastructure (base stations/collectors/antennas/backhaul, $________
    as applicable)
    Head-end / MDMS software (initial license or setup) $________
    System configuration & integration (incl. Tyler ERP PRO / Incode) $________
    Training $________
    Subtotal - Network & Software $________
    E. Installation - by Location Setting
    Install labor varies by meter setting. Provide a unit install price for each setting below; quantities are
    estimated. All endpoint installation shall be included in the unit install price.
    ID Install Setting Est. Qty Unit Install Extended
    Price
    L-01 Pit / Tile 1,686 $________ $________
    L-02 Crawlspace 847 $________ $________
    L-03 Indoors / Other 5,446 $________ $________
    Subtotal - Installation by 7,979 $________
    Setting
    "Indoors / Other" comprises basement, garage, utility room/closet, kitchen, bathroom, under-stairs, under-
    building, inside-house, and unclassified settings.
    F. Additional Installation & Commissioning
    Item Price
    Testing & commissioning $________
    Other (explain) $________
    Subtotal - Additional Installation $________
    9

    Item Annual Cost
    Software hosting/maintenance $________
    Network/communications (incl. per-meter cellular, if any) $________
    Ongoing support $________
    Warranty extension (if any) $________
    Other (explain) $________
    Subtotal - Annual Recurring $________
    TOTAL UP-FRONT PROJECT COST (A + B + D + E + F; remote shut-off per Section C as elected) $________
    20-YEAR RECURRING COST (Section G x 20) $________
    20-YEAR TOTAL COST OF OWNERSHIP $________

    G. Recurring / Ongoing Costs (Annual)
    List every recurring cost of the proposed solution - including any per-meter cellular or network
    subscription, software hosting, and support. These figures are carried into the 20-year total-cost
    comparison.
    Item Annual Cost
    Software hosting/maintenance $________
    Network/communications (incl. per-meter cellular, if any) $________
    Ongoing support $________
    Warranty extension (if any) $________
    Other (explain) $________
    Subtotal - Annual Recurring $________
    TOTAL UP-FRONT PROJECT COST (A + B + D + E + F; remote $________
    shut-off per Section C as elected)
    20-YEAR RECURRING COST (Section G x 20) $________
    20-YEAR TOTAL COST OF OWNERSHIP $________
    Firm / Proposer: ____________________________________________
    Authorized Signature: ______________________________ Date: ____________
    10

    This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
    Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL

    See also

    ...Contractor X2409-01 Water Supply System Bryant Creek State Park Ava 10/22/2026 Bid Forms ...

    State Government of Missouri

    Bid Due: 10/22/2026

    ...Contractor X2409-01 Water Supply System Bryant Creek State Park Ava, Missouri 10/22/2026 Bid ...

    State Government of Missouri

    Bid Due: 10/22/2026

    ...Contractor X2409-01 Water Supply System Bryant Creek State Park Ava 10/22/2026 Bid Forms ...

    State Government of Missouri

    Bid Due: 10/22/2026

    ...(Interstate 70 Water Casing Project) Issue Date & Time 10/14/2026 02:00:00 PM (CT) ...

    City of Wentzville

    Bid Due: 11/04/2026

    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.