| Location: | Texas |
|---|---|
| Posted: | Jul 6, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Contract: | Awards |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA8507_Elevation_Motor_Brake |
| Publication URL: | To access bid details, please log in. |
This requirement is for the purchase of two (2) EL motor/brake assembly for the X-Band Radar P/N 53983-12-3500-02.
The Pedestal Control System (PCS) supports the rotational movement of the radar system. The PCS is composed of the servo controls and drive motor/brake assemblies. The EL Motor/Brake Assembly consists of (brake pre-wiring, clamp collar and motor installation) which must be fully tested after assembly to guarantee it meets specification requirements. The motor/brake assembly P/N 53983-12-3500-02 consists of a motor (HP: 30, RPM 2500 with tach, high inertia) and a brake P/N 53983-12-4601-02 (125 ft-lb, 120 VAC, 50Hz, 256TC, HORZ). The Brake Assembly Modification (P/N 53983-12-4600-01) is required prior to field installation for the GLOBUS X-Band Subsystem and is proprietary. The brake must be prepared electrically and mechanically to the specs in the Brake Assembly Modification to avoid catastrophic failure and damage. The assembly design is propreitary to CPI.

With GovernmentContracts, you can:
...: Contact Information: Technology Development and Partnerships Manager, EVA & Human Surface Mobility... ...
NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
Bid Due: 1/16/2027
...Follow ARMY APPLICATIONS LABORATORY BROAD AGENCY ANNOUNCEMENT FOR DISRUPTIVE TECHNOLOGIES Active... (opens in ...
DEPT OF DEFENSE
Bid Due: 4/04/2029
...Follow ARMY APPLICATIONS LABORATORY BROAD AGENCY ANNOUNCEMENT FOR DISRUPTIVE TECHNOLOGIES Active... (opens in ...
DEPT OF DEFENSE
Bid Due: 4/04/2029
...: Information Technology Type: RFP Status: Open Open Date: Oct 15th 2026, 4:30 ...
City of Waco
Bid Due: 11/05/2026