| Location: | Georgia |
|---|---|
| Posted: | Jul 28, 2026 |
| Due: | Aug 27, 2026 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-48401-RFQ-2027-000000617 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-48401-RFQ-2027-000000617 | PNA-484-092826 On-Call Engineering Support Services for Cable Stayed Bridge and Tunnels | Transportation-2, Department Of |
Jul 28, 2026 @ 08:52 AM
|
Aug 27, 2026 @ 02:00 PM
|
Start Date: Jul 28, 2026 @ 08:52 AM ET
End Date:
Aug 27, 2026 @ 02:00 PM ET
On-Call Engineering Support Services for Cable Stayed Bridge and Tunnels (2 Contracts)
| Code | Description |
| 92536 | Engineering Services (Not Otherwise Classified) |
| 91896 | Transportation Consulting |
| 91313 | Construction, Bridge and Drawbridge, Including Reconstruction and Rehabilitation |
| 92513 | Bridge Engineering |
| 91366 | Maintenance and Repair, Bridges |
| 91832 | Consulting Services (Not Otherwise Classified) |
| 90740 | Engineering Services, Non-Licensed (Not Otherwise Classified), Including Consulting |
Andrea Everson
aeverson@dot.ga.gov
404-631-1549
| Area | Area Class Description | Prime Required | Team Required | ||||
|---|---|---|---|---|---|---|---|
| Class | |||||||
| No. | |||||||
| 1.06(a) | Documentation | X | |||||
| 1.06(b) | History | X | |||||
| 1.60(c) | Air Studies | X | |||||
| 1.06(d) | Noise Studies | X | |||||
| 1.06(e) | Ecology | X | |||||
| 1.06(f) | Archaeology | X | |||||
| 1.06(g) | Freshwater Aquatic Survey | X | |||||
| 4.01(a) | Minor Bridge and Miscellaneous Highway Structure | X | |||||
| or | |||||||
| 4.01(b) | Minor Bridge Design - CONDITIONAL | X | |||||
| 4.02 | Major Bridges Design | X |
| Prime |
|---|
| Required |
| Team |
|---|
| Required |
Date Posted: July 28, 2026
Public Notice of Advertisement (PNA) to Issue a Request for Qualifications (RFQ)
The purpose of the PNA is to inform the Consultant community of the upcoming RFQ opportunity. Full
scope of work, instructions and requirements for the upcoming RFQ are to be posted as indicated
below in the anticipated schedule*. No questions or submittals are due during the PNA.
GEORGIA DEPARTMENT OF TRANSPORTATION
Reference #:
PNA 484-092826 On-Call Engineering Support Services for Cable Stayed Bridge and Tunnels (2 Contracts)
GDOT reserves the right to modify all information provided in this PNA in the forth-coming RFQ at its
sole discretion:
Project Description:
Contract 1 - On-Call Complex Structures Engineering Services
Contract 2 - On-Call Engineering and Inspection Support Service
Summary of Scope of Work for Contracts 1 and 2:
Contract 1 - On-Call Complex Structures Engineering Services
The selected consultant will provide inspection services and other engineering services in support of the
inspection and maintenance of two cable stayed bridge structures and Tunnels for the Department under
limited supervision and on an "On Call" basis.
Anticipated Area Class(es) Requirements for Contract 1:
Area
Prime Team
Class Area Class Description
Required Required
No.
1.06(a) Documentation X
1.06(b) History X
1.60(c) Air Studies X
1.06(d) Noise Studies X
1.06(e) Ecology X
1.06(f) Archaeology X
1.06(g) Freshwater Aquatic Survey X
4.01(a) Minor Bridge and Miscellaneous Highway Structure X
or
4.01(b) Minor Bridge Design - CONDITIONAL X
4.02 Major Bridges Design X
| 4.03 | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| 4.04 | Hydraulic & Hydrological Studies (Bridges) | X | |||||||||
| 4.05 | Bridge Inspection | X | |||||||||
| 5.01 | Land Surveying | X | |||||||||
| 5.02 | Engineering Surveying | X | |||||||||
| 6.01(a) | Soil Survey Studies | X | |||||||||
| or | |||||||||||
| 6.01(b) | Geological & Geophysical Studies | X | |||||||||
| 6.02 | Bridge Foundation Studies | X |
| Area | Area Class Description | Prime Required | Team Required | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Class | |||||||||||
| No. | |||||||||||
| 1.06(a) | Documentation | X | |||||||||
| 1.06(b) | History | X | |||||||||
| 1.60(c) | Air Studies | X | |||||||||
| 1.06(d) | Noise Studies | X | |||||||||
| 1.06(e) | Ecology | X | |||||||||
| 1.06(f) | Archaeology | X | |||||||||
| 1.06(g) | Freshwater Aquatic Survey | X | |||||||||
| 4.01(a) | Minor Bridge and Miscellaneous Highway Structure | X | |||||||||
| or | |||||||||||
| 4.01(b) | Minor Bridge Design - CONDITIONAL | X | |||||||||
| 4.02 | Major Bridges Design | X | |||||||||
| 4.04 | Hydraulic & Hydrological Studies (Bridges) | X | |||||||||
| 4.05 | Bridge Inspection | X | |||||||||
| 5.01 | Land Surveying | X | |||||||||
| 5.02 | Engineering Surveying | X | |||||||||
| 6.01(a) | Soil Survey Studies | X | |||||||||
| or | |||||||||||
| 6.01(b) | Geological & Geophysical Studies | X | |||||||||
| 6.02 | Bridge Foundation Studies | X |
| Prime |
|---|
| Required |
| Team |
|---|
| Required |
4.03 Complex Bridge Design X
4.04 Hydraulic & Hydrological Studies (Bridges) X
4.05 Bridge Inspection X
5.01 Land Surveying X
5.02 Engineering Surveying X
6.01(a) Soil Survey Studies X
or
6.01(b) Geological & Geophysical Studies X
6.02 Bridge Foundation Studies X
Anticipated Key Team Leaders for Contract 1:
A. Lead Bridge Engineer
B. Lead Bridge Inspector
C. Lead Tunnel Engineer
D. Load Rate/Test Engineer
E. QA/QC Engineer
Contract 2- On-Call Engineering and Inspection Support Services
The selective consultant will provide engineering and other design services as needed in support of the design
and development of transportation facilities, including highway construction, maintenance, and operational
support for the Department under limited supervision and on an "On Call" basis.
Anticipated Area Class(es) Requirements for Contract 2:
Area
Prime Team
Class Area Class Description
Required Required
No.
1.06(a) Documentation X
1.06(b) History X
1.60(c) Air Studies X
1.06(d) Noise Studies X
1.06(e) Ecology X
1.06(f) Archaeology X
1.06(g) Freshwater Aquatic Survey X
4.01(a) Minor Bridge and Miscellaneous Highway Structure X
or
4.01(b) Minor Bridge Design - CONDITIONAL X
4.02 Major Bridges Design X
4.04 Hydraulic & Hydrological Studies (Bridges) X
4.05 Bridge Inspection X
5.01 Land Surveying X
5.02 Engineering Surveying X
6.01(a) Soil Survey Studies X
or
6.01(b) Geological & Geophysical Studies X
6.02 Bridge Foundation Studies X
Anticipated Key Team Leaders for Contract 2:
A. Bridge Engineer Lead
B. Bridge Inspection Engineer Lead
C. Quality Control/Assurance Lead
D. Load Rating Lead
E. Roadway Engineer Lead
Anticipated Schedule for the two (2) Contracts *:
RFQ Issuance Date: August 27, 2026
Statement of Qualifications Due Date: September 28, 2026
From the posting of the RFQ, until successful respondents are selected and the award is made official
and announced, firms are not allowed to communicate about this RFQ Solicitation or scope with any
staff of GDOT including the Commissioner and GDOT Board Members, except for the submission of
questions as instructed in the upcoming Request for Qualifications, with the contact designated in the
PNA/RFQ or as provided by any existing work agreement(s). For violation of this provision, GDOT
reserves the right to reject the submittal of the offending respondent.
Contact Information:
Georgia Department of Transportation
Office of Procurement
Engineering and Design Services
600 West Peachtree Street, NW
Atlanta, Georgia 30308
Attn: Andrea Everson
Phone number: 404-631-1549
Email address: aeverson@dot.ga.gov

With GovernmentContracts, you can:
...Engineering Consulting (GEC) Services for Alternative Delivery Program NIGP Codes Code Description 96258... ...
State Government of Georgia
Bid Due: 10/01/2026
...., Architectural and Engineering Services 91842 Engineering Consulting (Inactive, please see commodity code ...
State Government of Georgia
Bid Due: 10/02/2026
...Civil Engineering 91894 Traffic Consulting 96889 Traffic Studies and Analysis Services 91896... Consulting ...
State Government of Georgia
Bid Due: 10/02/2026
...91327 Construction, Highway and Road 91831 Construction Consulting 93831 Engineering and Surveying...), Including ...
State Government of Georgia
Bid Due: 10/08/2026