November 18, 2025
AWARD NOTICE
BL118-25
South Rockbridge Road at North Deshong Road Intersection Improvement Project
Pursuant to the bids received on September 25, 2025 for BL118-25, South Rockbridge Road at North
Deshong Road Intersection Improvement Project the bid has been awarded to Vertical Earth, Inc. in
the amount of $2,408,716.40. Please note the enclosed bid tabulation.
We appreciate your bid and interest in Gwinnett County.
Sincerely,
Michael Milstein
Purchasing Associate II
MM/km
Enclosure
BL118-25
South Rockbridge Road at North Deshong Road Intersection Improvement Project
Department of Transportation
ITEM #
DESCRIPTION
005 AERIAL PHOTOGRAPH DOCUMENTATION
APPROX. QTY
9 MO
010 TRAFFIC CONTROL - PROJECT NO.: M-1377-01
1 LS
015 EROSION CONTROL - PROJECT NO.: M-1377-01
020
CONSTRUCT, MAINTAIN AND REMOVE SILT CONTROL GATE
TP 3
025
CONSTRUCT, MAINTAIN AND REMOVE INLET SEDIMENT
TRAP
030 TEMPORARY SILT FENCE, TP C
035 FOUNDATION BACKFILL MATERIAL, TP II
040 GRADING COMPLETE - PROJECT NO.: M-1377-01
045
UNDERCUT EXCAVATION - PROJECT NO.: M-1377-01 (PER
SPECIFICATION 210.5C)
050 GR AGGR BASE CRS, INCL MATL
055 AGGREGATE SURFACE COURSE
060
RECYCLED ASPHALT CONCRETE PATCHING, INCL BITUM
MATL &H LIME
065
RECYCLED ASPH CONC LEVELING, INCL BITUM MATL & H
LIME
1 LS
1 EA
22 EA
3,265 LF
100 TN
1 LS
750 CY
2,657 TN
100 TN
100 TN
1,817 TN
070
RECYCLED ASPH CONC 25 MM SUPERPAVE, GP 1 OR 2,
INCL BITUM MATL & H LIME
2,675 TN
075
RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2,
INCL BITUM MATL & H LIME
080
RECYCLED ASPH CONC 12.5 MM SUPERPAVE, GP 2 ONLY,
INCL POLY MOD BITUM MATL & H LIME
085 TACK COAT
090 MILL ASPH CONC PVMT, VARIABLE DEPTH
095 PLAIN PC CONC PVMT, CL 3 CONC, 10 INCH THK
100 DRIVEWAY CONCRETE, 6 IN TK
105 CONC SLOPE DRAIN
110 CONC SIDEWALK, 4 IN
115 CONC SIDEWALK, 8 IN
120 CONCRETE MEDIAN, 7 1/2 IN
125 CONC VALLEY GUTTER, 6 IN
130 HEADER CURB, 4 IN, TP 1
135 HEADER CURB, 4 IN, TP 9
140 CONC CURB & GUTTER, 8 IN X 30 IN, TP 2
145 PVMT REINF FABRIC STRIPS, TP 2, 18 INCH WIDTH
150 CLASS B CONC, BASE OR PVMT WIDENING
155 STN DUMPED RIP RAP, TP 3 18 IN
160 PLASTIC FILTER FABRIC
165 CHANGEABLE MESSAGE SIGN , PORTABLE, TYPE 3
170 BARRIER FENCE (ORANGE), 4 FT
175 GRASSING COMPLETE (SOD) - PROJECT NO.: M-1377-01
180 FLARED END SECTION 18 IN, STORM DRAIN
185 FLARED END SECTION 24 IN, STORM DRAIN
190 STORM DRAIN PIPE, 18 IN, CLASS III
195 STORM DRAIN PIPE, 24 IN, CLASS III
200 UNDERDRAIN PIPE, INCL DRAINAGE AGGR, 6 IN
1,340 TN
1,005 TN
730 GL
476 SY
570 SY
115 SY
5 SY
1,205 SY
655 SY
300 SY
45 SY
324 LF
411 LF
2,892 LF
3,039 LF
54 CY
45 SY
45 SY
3 EA
175 LF
1 LS
2 EA
2 EA
882 LF
185 LF
400 LF
9 Yards Infrastructure, LLC
(L)
UNIT PRICE
$350.00
$190,000.00
$11,000.00
$950.00
TOTAL PRICE
$3,150.00
$190,000.00
$11,000.00
$950.00
$250.00
$3.90
$10.00
$965,000.00
$18.00
$29.73
$39.40
$140.00
$5,500.00
$12,733.50
$1,000.00
$965,000.00
$13,500.00
$78,992.61
$3,940.00
$14,000.00
$110.00
$199,870.00
$106.00
$283,550.00
$107.00
$145.00
$6.00
$60.00
$140.00
$50.00
$68.00
$36.00
$61.00
$67.00
$40.00
$14.00
$14.00
$22.00
$2.00
$275.00
$58.00
$8.00
$11,400.00
$1.85
$45,000.00
$1,310.00
$2,250.00
$84.00
$84.00
$2.00
$143,380.00
$145,725.00
$4,380.00
$28,560.00
$79,800.00
$5,750.00
$340.00
$43,380.00
$39,955.00
$20,100.00
$1,800.00
$4,536.00
$5,754.00
$63,624.00
$6,078.00
$14,850.00
$2,610.00
$360.00
$34,200.00
$323.75
$45,000.00
$2,620.00
$4,500.00
$74,088.00
$15,540.00
$800.00
BID TABULATION
Azimuth Constractors, LLC
(OC)
UNIT PRICE
$225.00
$297,000.00
$9,100.00
$950.00
TOTAL PRICE
$2,025.00
$297,000.00
$9,100.00
$950.00
$200.00
$3.90
$45.33
$600,063.64
$18.00
$30.18
$30.18
$175.00
$4,400.00
$12,733.50
$4,533.00
$600,063.64
$13,500.00
$80,188.26
$3,018.00
$17,500.00
$115.00
$208,955.00
$110.00
$294,250.00
$105.00
$142.00
$5.00
$30.00
$144.12
$49.20
$60.45
$36.14
$60.02
$59.56
$49.20
$14.46
$14.46
$21.70
$5.00
$269.68
$70.09
$5.00
$8,600.00
$2.75
$45,500.00
$1,181.86
$1,296.16
$57.43
$75.67
$35.50
$140,700.00
$142,710.00
$3,650.00
$14,280.00
$82,148.40
$5,658.00
$302.25
$43,548.70
$39,313.10
$17,868.00
$2,214.00
$4,685.04
$5,943.06
$62,756.40
$15,195.00
$14,562.72
$3,154.05
$225.00
$25,800.00
$481.25
$45,500.00
$2,363.72
$2,592.32
$50,653.26
$13,998.95
$14,200.00
Backbone Infrastructure, LLC
(L)
UNIT PRICE
$375.00
$95,820.00
$6,500.00
$650.00
TOTAL PRICE
$3,375.00
$95,820.00
$6,500.00
$650.00
$475.00
$4.00
$45.00
$819,233.00
$18.00
$32.00
$35.00
$200.00
$10,450.00
$13,060.00
$4,500.00
$819,233.00
$13,500.00
$85,024.00
$3,500.00
$20,000.00
$130.00
$236,210.00
$98.00
$262,150.00
$100.00
$120.00
$4.00
$50.00
$143.00
$58.00
$62.50
$50.00
$60.00
$83.00
$60.00
$15.00
$15.00
$25.00
$5.00
$250.00
$72.00
$6.00
$5,000.00
$2.00
$78,590.00
$1,250.00
$1,550.00
$60.00
$80.00
$30.00
$134,000.00
$120,600.00
$2,920.00
$23,800.00
$81,510.00
$6,670.00
$312.50
$60,250.00
$39,300.00
$24,900.00
$2,700.00
$4,860.00
$6,165.00
$72,300.00
$15,195.00
$13,500.00
$3,240.00
$270.00
$15,000.00
$350.00
$78,590.00
$2,500.00
$3,100.00
$52,920.00
$14,800.00
$12,000.00
CMC, Inc.
(L)
UNIT PRICE
$225.00
$257,457.79
$37,300.00
$830.00
TOTAL PRICE
$2,025.00
$257,457.79
$37,300.00
$830.00
$260.00
$4.00
$46.30
$681,608.46
$18.00
$33.50
$34.25
$96.00
$5,720.00
$13,060.00
$4,630.00
$681,608.46
$13,500.00
$89,009.50
$3,425.00
$9,600.00
$113.00
$205,321.00
$87.50
$234,062.50
$89.70
$110.00
$4.70
$28.50
$145.50
$55.30
$56.00
$42.50
$64.00
$73.50
$55.30
$17.00
$18.50
$24.25
$5.50
$165.00
$65.20
$4.00
$6,500.00
$3.50
$62,250.00
$1,730.00
$1,825.00
$65.50
$82.75
$16.40
$120,198.00
$110,550.00
$3,431.00
$13,566.00
$82,935.00
$6,359.50
$280.00
$51,212.50
$41,920.00
$22,050.00
$2,488.50
$5,508.00
$7,603.50
$70,131.00
$16,714.50
$8,910.00
$2,934.00
$180.00
$19,500.00
$612.50
$62,250.00
$3,460.00
$3,650.00
$57,771.00
$15,308.75
$6,560.00
PAGE 1 of 4
E.R. Snell Contractor, Inc.
(L)
UNIT PRICE
$1,630.00
$106,900.00
$16,800.00
$1,150.00
TOTAL PRICE
$14,670.00
$106,900.00
$16,800.00
$1,150.00
$530.00
$13.25
$125.00
$523,673.00
$18.00
$45.50
$68.00
$297.00
$11,660.00
$43,261.25
$12,500.00
$523,673.00
$13,500.00
$120,893.50
$6,800.00
$29,700.00
$132.00
$239,844.00
$96.50
$258,137.50
$99.50
$126.50
$3.25
$17.00
$196.00
$86.25
$243.00
$67.25
$120.00
$138.00
$84.50
$28.00
$29.50
$36.75
$6.45
$362.00
$140.00
$5.25
$10,900.00
$3.85
$149,900.00
$1,030.00
$1,170.00
$104.00
$109.00
$43.50
$133,330.00
$127,132.50
$2,372.50
$8,092.00
$111,720.00
$9,918.75
$1,215.00
$81,036.25
$78,600.00
$41,400.00
$3,802.50
$9,072.00
$12,124.50
$106,281.00
$19,601.55
$19,548.00
$6,300.00
$236.25
$32,700.00
$673.75
$149,900.00
$2,060.00
$2,340.00
$91,728.00
$20,165.00
$17,400.00
km
BL118-25
South Rockbridge Road at North Deshong Road Intersection Improvement Project
Department of Transportation
ITEM #
DESCRIPTION
205 RECONSTR CATCH BASIN, GROUP 1
210 RECONSTR DROP INLET, GROUP 1
215 RECONSTR STORM SEW MANHOLE, TYPE 1
220 CATCH BASIN, GP 1
225 CATCH BASIN, GP 1, SPCL DES
230 CATCH BASIN, GP 1, ADDL DEPTH
235 DROP INLET, GP 1
240 DROP INLET, GP 1, ADDL DEPTH
245 STORM SEWER MANHOLE, TP 1
250 STORM SEWER MANHOLE, TP 1 ADDL DEPTH
255 REM HIGHWAY SIGN - PARK SIGN
260 RESET SIGN - PARK SIGN
265 HIGHWAY SIGNS, TP 1 MATL, REFL SHEETING, TP 9
270 HIGHWAY SIGNS, TP 1 MATL, REFL SHEETING, TP 11
275 GALV STEEL POSTS, TP 7
280 FLEXIBLE POST TP 2B
285 THERMOPLASTIC PAVEMENT MARKING, ARROW, TP 1
290 THERMOPLASTIC PAVEMENT MARKING, ARROW, TP 2
295 THERMOPLASTIC PAVEMENT MARKING, ARROW, TP 3
300 THERMOPLASTIC PAVEMENT WORD, TP 1
305 THERMOPLASTIC PAVEMENT MARKING, WORD, TP 15
310
THERMOPLASTIC SOLID TRAFFIC STRIPE, 24 IN, WHITE
(FOR CROSSWALKS)
315
THERMOPLASTIC SOLID TRAFFIC STRIPE, 8 IN, WHITE (FOR
CROSSWALKS)
320 THERMOPLASTIC SKIP TRAF STRIPE, 18 IN, WHITE
325
THERMOPLASTIC TRAF STRIPING, YELLOW (ISLAND
HATCHING)
330
WET WEATHER THERMOPLASTIC SOLID TRAF STRIPE, 6 IN,
WHITE
335
WET WEATHER THERMOPLASTIC SOLID TRAF STRIPE, 6 IN,
YELLOW
340
WET WEATHER THERMOPLASTIC SKIP TRAF STRIPE, 6 IN,
WHITE
345 RAISED PVMT MARKERS, TP 1 & TP3
350 WATER SERVICE CONNECTIONS 3/4 IN - 1 IN LONG SIDE
355
RELOCATION AND/OR RECONNECTION OF EXISTING FIRE
HYDRANTS
360 ADJUST EXISTING FIRE HYDRANTS
365 ADJUST VALVE BOX
APPROX. QTY
3 EA
1 EA
1 EA
5 EA
1 EA
1 LF
11 EA
10 LF
1 EA
1 LF
1 EA
1 EA
138 SF
320 SF
306 LF
24 LF
1 EA
8 EA
3 EA
1 EA
3 EA
208 LF
320 LF
154 GLF
1,149 SY
1,181 LF
575 LF
960 GLF
106 EA
3 EA
1 EA
1 VF
5 EA
TOTAL
9 Yards Infrastructure, LLC
(L)
UNIT PRICE
$3,360.00
$4,300.00
$3,500.00
$4,795.00
$3,900.00
$250.00
$7,800.00
$250.00
$4,600.00
$250.00
$250.00
$250.00
$26.00
$23.00
$14.00
$30.00
$105.00
$100.00
$140.00
$135.00
$140.00
$5.50
TOTAL PRICE
$10,080.00
$4,300.00
$3,500.00
$23,975.00
$3,900.00
$250.00
$85,800.00
$2,500.00
$4,600.00
$250.00
$250.00
$250.00
$3,588.00
$7,360.00
$4,284.00
$720.00
$105.00
$800.00
$420.00
$135.00
$420.00
$1,144.00
$2.50
$2.00
$5.65
$800.00
$308.00
$6,491.85
$1.15
$1,358.15
$1.15
$661.25
$0.65
$5.00
$2,800.00
$11,703.00
$900.00
$150.00
$624.00
$530.00
$8,400.00
$11,703.00
$900.00
$750.00
$2,762,397.11
BID TABULATION
Azimuth Constractors, LLC
(OC)
UNIT PRICE
$6,595.78
$4,025.33
$4,063.74
$4,127.06
$1,622.55
$284.60
$4,025.33
$284.60
$4,063.74
$284.60
$50.00
$150.00
$25.42
$22.66
$14.07
$30.02
$105.00
$100.00
$140.00
$135.00
$140.00
$5.50
TOTAL PRICE
$19,787.34
$4,025.33
$4,063.74
$20,635.30
$1,622.55
$284.60
$44,278.63
$2,846.00
$4,063.74
$284.60
$50.00
$150.00
$3,507.96
$7,251.20
$4,305.42
$720.48
$105.00
$800.00
$420.00
$135.00
$420.00
$1,144.00
$2.50
$2.00
$5.65
$800.00
$308.00
$6,491.85
$1.15
$1,358.15
$1.15
$661.25
$0.65
$5.00
$2,800.00
$11,703.00
$900.00
$150.00
$624.00
$530.00
$8,400.00
$11,703.00
$900.00
$750.00
$2,456,146.76
Backbone Infrastructure, LLC
(L)
UNIT PRICE
$3,500.00
$4,000.00
$5,200.00
$5,400.00
$4,800.00
$350.00
$7,500.00
$350.00
$8,000.00
$350.00
$80.00
$160.00
$21.50
$21.50
$13.00
$85.00
$105.00
$100.00
$140.00
$135.00
$140.00
$5.50
TOTAL PRICE
$10,500.00
$4,000.00
$5,200.00
$27,000.00
$4,800.00
$350.00
$82,500.00
$3,500.00
$8,000.00
$350.00
$80.00
$160.00
$2,967.00
$6,880.00
$3,978.00
$2,040.00
$105.00
$800.00
$420.00
$135.00
$420.00
$1,144.00
$2.50
$2.00
$6.00
$800.00
$308.00
$6,894.00
$1.50
$1,771.50
$1.20
$690.00
$0.65
$5.00
$2,800.00
$11,700.00
$900.00
$150.00
$624.00
$530.00
$8,400.00
$11,700.00
$900.00
$750.00
$2,564,421.00
CMC, Inc.
(L)
UNIT PRICE
$2,850.00
$2,600.00
$3,450.00
$4,830.00
$4,360.00
$300.00
$5,600.00
$300.00
$4,650.00
$300.00
$100.00
$150.00
$26.50
$27.00
$11.00
$125.00
$100.00
$100.00
$250.00
$250.00
$350.00
$8.50
TOTAL PRICE
$8,550.00
$2,600.00
$3,450.00
$24,150.00
$4,360.00
$300.00
$61,600.00
$3,000.00
$4,650.00
$300.00
$100.00
$150.00
$3,657.00
$8,640.00
$3,366.00
$3,000.00
$100.00
$800.00
$750.00
$250.00
$1,050.00
$1,768.00
$3.00
$5.00
$6.00
$960.00
$770.00
$6,894.00
$2.00
$2,362.00
$2.00
$1,150.00
$1.50
$5.00
$2,500.00
$5,600.00
$1,500.00
$150.00
$1,440.00
$530.00
$7,500.00
$5,600.00
$1,500.00
$750.00
$2,459,680.00
PAGE 2 of 4
E.R. Snell Contractor, Inc.
(L)
UNIT PRICE
$7,330.00
$7,110.00
$7,110.00
$7,330.00
$16,300.00
$662.00
$7,110.00
$662.00
$7,110.00
$662.00
$1,040.00
$2,590.00
$27.50
$24.50
$15.25
$32.50
$111.00
$111.00
$166.00
$166.00
$222.00
$6.65
TOTAL PRICE
$21,990.00
$7,110.00
$7,110.00
$36,650.00
$16,300.00
$662.00
$78,210.00
$6,620.00
$7,110.00
$662.00
$1,040.00
$2,590.00
$3,795.00
$7,840.00
$4,666.50
$780.00
$111.00
$888.00
$498.00
$166.00
$666.00
$1,383.20
$2.20
$4.45
$7.20
$704.00
$685.30
$8,272.80
$1.65
$1,948.65
$1.65
$948.75
$1.10
$8.30
$3,040.00
$12,700.00
$977.00
$163.00
$1,056.00
$879.80
$9,120.00
$12,700.00
$977.00
$815.00
$2,733,193.80
km
BID TABULATION
BL118-25
South Rockbridge Road at North Deshong Road Intersection Improvement Project
Department of Transportation
ITEM #
DESCRIPTION
005 AERIAL PHOTOGRAPH DOCUMENTATION
APPROX. QTY
9 MO
010 TRAFFIC CONTROL - PROJECT NO.: M-1377-01
1 LS
015 EROSION CONTROL - PROJECT NO.: M-1377-01
020
CONSTRUCT, MAINTAIN AND REMOVE SILT CONTROL GATE
TP 3
025
CONSTRUCT, MAINTAIN AND REMOVE INLET SEDIMENT
TRAP
030 TEMPORARY SILT FENCE, TP C
035 FOUNDATION BACKFILL MATERIAL, TP II
040 GRADING COMPLETE - PROJECT NO.: M-1377-01
045
UNDERCUT EXCAVATION - PROJECT NO.: M-1377-01 (PER
SPECIFICATION 210.5C)
050 GR AGGR BASE CRS, INCL MATL
055 AGGREGATE SURFACE COURSE
060
RECYCLED ASPHALT CONCRETE PATCHING, INCL BITUM
MATL &H LIME
065
RECYCLED ASPH CONC LEVELING, INCL BITUM MATL & H
LIME
1 LS
1 EA
22 EA
3,265 LF
100 TN
1 LS
750 CY
2,657 TN
100 TN
100 TN
1,817 TN
070
RECYCLED ASPH CONC 25 MM SUPERPAVE, GP 1 OR 2,
INCL BITUM MATL & H LIME
2,675 TN
075
RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2,
INCL BITUM MATL & H LIME
080
RECYCLED ASPH CONC 12.5 MM SUPERPAVE, GP 2 ONLY,
INCL POLY MOD BITUM MATL & H LIME
085 TACK COAT
090 MILL ASPH CONC PVMT, VARIABLE DEPTH
095 PLAIN PC CONC PVMT, CL 3 CONC, 10 INCH THK
100 DRIVEWAY CONCRETE, 6 IN TK
105 CONC SLOPE DRAIN
110 CONC SIDEWALK, 4 IN
115 CONC SIDEWALK, 8 IN
120 CONCRETE MEDIAN, 7 1/2 IN
125 CONC VALLEY GUTTER, 6 IN
130 HEADER CURB, 4 IN, TP 1
135 HEADER CURB, 4 IN, TP 9
140 CONC CURB & GUTTER, 8 IN X 30 IN, TP 2
145 PVMT REINF FABRIC STRIPS, TP 2, 18 INCH WIDTH
150 CLASS B CONC, BASE OR PVMT WIDENING
155 STN DUMPED RIP RAP, TP 3 18 IN
160 PLASTIC FILTER FABRIC
165 CHANGEABLE MESSAGE SIGN , PORTABLE, TYPE 3
170 BARRIER FENCE (ORANGE), 4 FT
175 GRASSING COMPLETE (SOD) - PROJECT NO.: M-1377-01
180 FLARED END SECTION 18 IN, STORM DRAIN
185 FLARED END SECTION 24 IN, STORM DRAIN
190 STORM DRAIN PIPE, 18 IN, CLASS III
195 STORM DRAIN PIPE, 24 IN, CLASS III
200 UNDERDRAIN PIPE, INCL DRAINAGE AGGR, 6 IN
1,340 TN
1,005 TN
730 GL
476 SY
570 SY
115 SY
5 SY
1,205 SY
655 SY
300 SY
45 SY
324 LF
411 LF
2,892 LF
3,039 LF
54 CY
45 SY
45 SY
3 EA
175 LF
1 LS
2 EA
2 EA
882 LF
185 LF
400 LF
Ohmshiv Construction, LLC
(L)
UNIT PRICE
$350.00
$115,000.00
$15,000.00
$300.00
TOTAL PRICE
$3,150.00
$115,000.00
$15,000.00
$300.00
$150.00
$3.50
$50.00
$809,713.00
$18.00
$36.00
$36.00
$176.00
$3,300.00
$11,427.50
$5,000.00
$809,713.00
$13,500.00
$95,652.00
$3,600.00
$17,600.00
$110.00
$199,870.00
$107.00
$286,225.00
$106.00
$131.00
$5.05
$30.10
$150.00
$53.00
$68.00
$42.25
$64.00
$55.00
$53.00
$21.00
$23.00
$25.00
$5.05
$240.00
$65.00
$4.00
$4,000.00
$2.00
$52,000.00
$1,100.00
$1,200.00
$75.00
$98.00
$15.00
$142,040.00
$131,655.00
$3,686.50
$14,327.60
$85,500.00
$6,095.00
$340.00
$50,911.25
$41,920.00
$16,500.00
$2,385.00
$6,804.00
$9,453.00
$72,300.00
$15,346.95
$12,960.00
$2,925.00
$180.00
$12,000.00
$350.00
$52,000.00
$2,200.00
$2,400.00
$66,150.00
$18,130.00
$6,000.00
The Scruggs Company d.b.a. Sunbelt Summit Construction & Development,
Asphalt Surfaces, Inc.
LLC
(OC)
(L)
UNIT PRICE
$900.00
$117,895.59
$13,445.00
TOTAL PRICE
$8,100.00
$117,895.59
$13,445.00
UNIT PRICE
$350.00
$92,100.00
$5,000.00
TOTAL PRICE
$3,150.00
$92,100.00
$5,000.00
$650.00
$650.00
$650.00
$650.00
$375.00
$4.00
$55.00
$298,635.89
$18.00
$39.00
$39.00
$200.00
$8,250.00
$13,060.00
$5,500.00
$298,635.89
$13,500.00
$103,623.00
$3,900.00
$20,000.00
$220.00
$2.80
$94.00
$801,756.96
$18.00
$45.00
$45.00
$110.00
$4,840.00
$9,142.00
$9,400.00
$801,756.96
$13,500.00
$119,565.00
$4,500.00
$11,000.00
$155.00
$281,635.00
$140.00
$254,380.00
$125.00
$334,375.00
$130.00
$347,750.00
$125.00
$167,500.00
$130.00
$174,200.00
$135.00
$4.00
$8.00
$199.00
$87.00
$247.00
$55.00
$105.00
$139.00
$85.00
$28.40
$29.80
$37.00
$12.00
$345.00
$107.22
$20.00
$15,500.00
$2.25
$105,450.00
$1,693.00
$1,918.74
$73.02
$107.58
$70.00
$135,675.00
$2,920.00
$3,808.00
$113,430.00
$10,005.00
$1,235.00
$66,275.00
$68,775.00
$41,700.00
$3,825.00
$9,201.60
$12,247.80
$107,004.00
$36,468.00
$18,630.00
$4,824.90
$900.00
$46,500.00
$393.75
$105,450.00
$3,386.00
$3,837.48
$64,403.64
$19,902.30
$28,000.00
$140.00
$5.50
$12.50
$240.00
$74.00
$54.00
$54.00
$84.00
$80.00
$75.00
$22.00
$24.00
$28.00
$8.50
$200.00
$120.00
$3.50
$5,000.00
$1.88
$75,000.00
$850.00
$950.00
$70.00
$84.00
$25.00
$140,700.00
$4,015.00
$5,950.00
$136,800.00
$8,510.00
$270.00
$65,070.00
$55,020.00
$24,000.00
$3,375.00
$7,128.00
$9,864.00
$80,976.00
$25,831.50
$10,800.00
$5,400.00
$157.50
$15,000.00
$329.00
$75,000.00
$1,700.00
$1,900.00
$61,740.00
$15,540.00
$10,000.00
Vertical Earth, Inc.
(OC)
UNIT PRICE
$482.90
$61,388.01
$12,953.85
$1,201.59
TOTAL PRICE
$4,346.10
$61,388.01
$12,953.85
$1,201.59
$202.80
$3.71
$64.93
$688,637.36
$18.00
$37.72
$73.06
$302.65
$4,461.60
$12,113.15
$6,493.00
$688,637.36
$13,500.00
$100,222.04
$7,306.00
$30,265.00
$136.32
$247,693.44
$102.85
$275,123.75
$103.81
$144.11
$5.89
$20.11
$119.81
$55.31
$332.47
$41.28
$66.71
$72.94
$75.75
$22.29
$16.18
$16.10
$3.60
$310.55
$106.58
$5.28
$13,200.00
$1.01
$44,472.75
$1,579.19
$1,783.23
$74.54
$111.70
$24.10
$139,105.40
$144,830.55
$4,299.70
$9,572.36
$68,291.70
$6,360.65
$1,662.35
$49,742.40
$43,695.05
$21,882.00
$3,408.75
$7,221.96
$6,649.98
$46,561.20
$10,940.40
$16,769.70
$4,796.10
$237.60
$39,600.00
$176.75
$44,472.75
$3,158.38
$3,566.46
$65,744.28
$20,664.50
$9,640.00
PAGE 3 of 4
km
BID TABULATION
BL118-25
South Rockbridge Road at North Deshong Road Intersection Improvement Project
Department of Transportation
Ohmshiv Construction, LLC
(L)
ITEM #
DESCRIPTION
205 RECONSTR CATCH BASIN, GROUP 1
210 RECONSTR DROP INLET, GROUP 1
215 RECONSTR STORM SEW MANHOLE, TYPE 1
220 CATCH BASIN, GP 1
225 CATCH BASIN, GP 1, SPCL DES
230 CATCH BASIN, GP 1, ADDL DEPTH
235 DROP INLET, GP 1
240 DROP INLET, GP 1, ADDL DEPTH
245 STORM SEWER MANHOLE, TP 1
250 STORM SEWER MANHOLE, TP 1 ADDL DEPTH
255 REM HIGHWAY SIGN - PARK SIGN
260 RESET SIGN - PARK SIGN
265 HIGHWAY SIGNS, TP 1 MATL, REFL SHEETING, TP 9
270 HIGHWAY SIGNS, TP 1 MATL, REFL SHEETING, TP 11
275 GALV STEEL POSTS, TP 7
280 FLEXIBLE POST TP 2B
285 THERMOPLASTIC PAVEMENT MARKING, ARROW, TP 1
290 THERMOPLASTIC PAVEMENT MARKING, ARROW, TP 2
295 THERMOPLASTIC PAVEMENT MARKING, ARROW, TP 3
300 THERMOPLASTIC PAVEMENT WORD, TP 1
305 THERMOPLASTIC PAVEMENT MARKING, WORD, TP 15
310
THERMOPLASTIC SOLID TRAFFIC STRIPE, 24 IN, WHITE
(FOR CROSSWALKS)
315
THERMOPLASTIC SOLID TRAFFIC STRIPE, 8 IN, WHITE (FOR
CROSSWALKS)
320 THERMOPLASTIC SKIP TRAF STRIPE, 18 IN, WHITE
325
THERMOPLASTIC TRAF STRIPING, YELLOW (ISLAND
HATCHING)
330
WET WEATHER THERMOPLASTIC SOLID TRAF STRIPE, 6 IN,
WHITE
335
WET WEATHER THERMOPLASTIC SOLID TRAF STRIPE, 6 IN,
YELLOW
340
WET WEATHER THERMOPLASTIC SKIP TRAF STRIPE, 6 IN,
WHITE
345 RAISED PVMT MARKERS, TP 1 & TP3
350 WATER SERVICE CONNECTIONS 3/4 IN - 1 IN LONG SIDE
355
RELOCATION AND/OR RECONNECTION OF EXISTING FIRE
HYDRANTS
360 ADJUST EXISTING FIRE HYDRANTS
365 ADJUST VALVE BOX
APPROX. QTY
3 EA
1 EA
1 EA
5 EA
1 EA
1 LF
11 EA
10 LF
1 EA
1 LF
1 EA
1 EA
138 SF
320 SF
306 LF
24 LF
1 EA
8 EA
3 EA
1 EA
3 EA
208 LF
320 LF
154 GLF
1,149 SY
1,181 LF
575 LF
960 GLF
106 EA
3 EA
1 EA
1 VF
5 EA
TOTAL
UNIT PRICE
$3,000.00
$3,000.00
$3,000.00
$6,000.00
$4,500.00
$250.00
$5,850.00
$250.00
$5,250.00
$250.00
$100.00
$125.00
$26.00
$26.00
$15.00
$125.00
$105.00
$100.00
$140.00
$135.00
$140.00
$5.50
TOTAL PRICE
$9,000.00
$3,000.00
$3,000.00
$30,000.00
$4,500.00
$250.00
$64,350.00
$2,500.00
$5,250.00
$250.00
$100.00
$125.00
$3,588.00
$8,320.00
$4,590.00
$3,000.00
$105.00
$800.00
$420.00
$135.00
$420.00
$1,144.00
$2.50
$2.00
$5.65
$800.00
$308.00
$6,491.85
$1.15
$1,358.15
$1.15
$661.25
$0.65
$5.00
$2,250.00
$10,000.00
$850.00
$200.00
$624.00
$530.00
$6,750.00
$10,000.00
$850.00
$1,000.00
$2,528,117.05
Recommended Vendor:
Vertical Earth, Inc.
Attn: Brett Johnnson
6025 Matt Highway
Cumming, GA 30028
Phone: 770-888-2224
bjohnson@vertical-earth.com
The Scruggs Company d.b.a. Sunbelt Summit Construction & Development,
Asphalt Surfaces, Inc.
LLC
(OC)
(L)
UNIT PRICE
$4,875.00
$4,710.00
$4,620.00
$6,345.00
$9,850.00
$575.00
$5,495.00
$475.00
$6,555.00
$575.00
$100.00
$100.00
$26.00
$24.50
$12.50
$100.00
$120.00
$115.00
$160.00
$150.00
$160.00
TOTAL PRICE
$14,625.00
$4,710.00
$4,620.00
$31,725.00
$9,850.00
$575.00
$60,445.00
$4,750.00
$6,555.00
$575.00
$100.00
$100.00
$3,588.00
$7,840.00
$3,825.00
$2,400.00
$120.00
$920.00
$480.00
$150.00
$480.00
UNIT PRICE
$5,000.00
$3,500.00
$3,500.00
$5,000.00
$5,000.00
$10.00
$4,500.00
$10.00
$4,500.00
$10.00
$50.00
$150.00
$24.43
$24.24
$16.80
$50.00
$107.00
$107.00
$162.00
$162.00
$214.00
TOTAL PRICE
$15,000.00
$3,500.00
$3,500.00
$25,000.00
$5,000.00
$10.00
$49,500.00
$100.00
$4,500.00
$10.00
$50.00
$150.00
$3,371.34
$7,756.80
$5,140.80
$1,200.00
$107.00
$856.00
$486.00
$162.00
$642.00
$6.20
$1,289.60
$6.48
$1,347.84
$2.80
$2.25
$6.25
$896.00
$346.50
$7,181.25
$2.16
$4.32
$7.02
$691.20
$665.28
$8,065.98
$1.30
$1,535.30
$1.62
$1,913.22
$1.30
$747.50
$1.62
$931.50
$0.75
$5.50
$3,200.00
$2,545.00
$1,545.00
$500.00
$720.00
$583.00
$9,600.00
$2,545.00
$1,545.00
$2,500.00
$2,486,789.10
$1.08
$8.10
$2,500.00
$6,500.00
$2,500.00
$850.00
$1,036.80
$858.60
$7,500.00
$6,500.00
$2,500.00
$4,250.00
$2,778,312.32
Vertical Earth, Inc.
(OC)
UNIT PRICE
$4,606.96
$2,148.21
$4,025.88
$6,480.38
$7,465.00
$412.81
$4,403.47
$460.79
$4,760.57
$421.27
$202.80
$405.60
$22.31
$22.31
$11.15
$126.75
$101.40
$101.40
$152.10
$152.10
$202.80
$6.08
TOTAL PRICE
$13,820.88
$2,148.21
$4,025.88
$32,401.90
$7,465.00
$412.81
$48,438.17
$4,607.90
$4,760.57
$421.27
$202.80
$405.60
$3,078.78
$7,139.20
$3,411.90
$3,042.00
$101.40
$811.20
$456.30
$152.10
$608.40
$1,264.64
$2.03
$4.06
$6.59
$649.60
$625.24
$7,571.91
$1.52
$1,795.12
$1.52
$874.00
$1.01
$7.61
$2,788.50
$3,549.00
$3,042.00
$507.00
$969.60
$806.66
$8,365.50
$3,549.00
$3,042.00
$2,535.00
$2,408,716.40
PAGE 4 of 4