South Rockbridge Road at North Deshong Road Intersection Improvement Project

Location: Georgia
Posted: Nov 24, 2025
Agency: Gwinnett County
Type of Contract: Awards
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Solicitation No: BL118-25
Publication URL: To access bid details, please log in.
  • BL118-25 Award Tabulation

    South Rockbridge Road at North Deshong Road Intersection Improvement Project

    Award Date : 11/18/2025 03:00 PM EST

  • Attachment Preview

    November 18, 2025
    AWARD NOTICE
    BL118-25
    South Rockbridge Road at North Deshong Road Intersection Improvement Project
    Pursuant to the bids received on September 25, 2025 for BL118-25, South Rockbridge Road at North
    Deshong Road Intersection Improvement Project the bid has been awarded to Vertical Earth, Inc. in
    the amount of $2,408,716.40. Please note the enclosed bid tabulation.
    We appreciate your bid and interest in Gwinnett County.
    Sincerely,
    Michael Milstein
    Purchasing Associate II
    MM/km
    Enclosure
    BL118-25
    South Rockbridge Road at North Deshong Road Intersection Improvement Project
    Department of Transportation
    ITEM #
    DESCRIPTION
    005 AERIAL PHOTOGRAPH DOCUMENTATION
    APPROX. QTY
    9 MO
    010 TRAFFIC CONTROL - PROJECT NO.: M-1377-01
    1 LS
    015 EROSION CONTROL - PROJECT NO.: M-1377-01
    020
    CONSTRUCT, MAINTAIN AND REMOVE SILT CONTROL GATE
    TP 3
    025
    CONSTRUCT, MAINTAIN AND REMOVE INLET SEDIMENT
    TRAP
    030 TEMPORARY SILT FENCE, TP C
    035 FOUNDATION BACKFILL MATERIAL, TP II
    040 GRADING COMPLETE - PROJECT NO.: M-1377-01
    045
    UNDERCUT EXCAVATION - PROJECT NO.: M-1377-01 (PER
    SPECIFICATION 210.5C)
    050 GR AGGR BASE CRS, INCL MATL
    055 AGGREGATE SURFACE COURSE
    060
    RECYCLED ASPHALT CONCRETE PATCHING, INCL BITUM
    MATL &H LIME
    065
    RECYCLED ASPH CONC LEVELING, INCL BITUM MATL & H
    LIME
    1 LS
    1 EA
    22 EA
    3,265 LF
    100 TN
    1 LS
    750 CY
    2,657 TN
    100 TN
    100 TN
    1,817 TN
    070
    RECYCLED ASPH CONC 25 MM SUPERPAVE, GP 1 OR 2,
    INCL BITUM MATL & H LIME
    2,675 TN
    075
    RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2,
    INCL BITUM MATL & H LIME
    080
    RECYCLED ASPH CONC 12.5 MM SUPERPAVE, GP 2 ONLY,
    INCL POLY MOD BITUM MATL & H LIME
    085 TACK COAT
    090 MILL ASPH CONC PVMT, VARIABLE DEPTH
    095 PLAIN PC CONC PVMT, CL 3 CONC, 10 INCH THK
    100 DRIVEWAY CONCRETE, 6 IN TK
    105 CONC SLOPE DRAIN
    110 CONC SIDEWALK, 4 IN
    115 CONC SIDEWALK, 8 IN
    120 CONCRETE MEDIAN, 7 1/2 IN
    125 CONC VALLEY GUTTER, 6 IN
    130 HEADER CURB, 4 IN, TP 1
    135 HEADER CURB, 4 IN, TP 9
    140 CONC CURB & GUTTER, 8 IN X 30 IN, TP 2
    145 PVMT REINF FABRIC STRIPS, TP 2, 18 INCH WIDTH
    150 CLASS B CONC, BASE OR PVMT WIDENING
    155 STN DUMPED RIP RAP, TP 3 18 IN
    160 PLASTIC FILTER FABRIC
    165 CHANGEABLE MESSAGE SIGN , PORTABLE, TYPE 3
    170 BARRIER FENCE (ORANGE), 4 FT
    175 GRASSING COMPLETE (SOD) - PROJECT NO.: M-1377-01
    180 FLARED END SECTION 18 IN, STORM DRAIN
    185 FLARED END SECTION 24 IN, STORM DRAIN
    190 STORM DRAIN PIPE, 18 IN, CLASS III
    195 STORM DRAIN PIPE, 24 IN, CLASS III
    200 UNDERDRAIN PIPE, INCL DRAINAGE AGGR, 6 IN
    1,340 TN
    1,005 TN
    730 GL
    476 SY
    570 SY
    115 SY
    5 SY
    1,205 SY
    655 SY
    300 SY
    45 SY
    324 LF
    411 LF
    2,892 LF
    3,039 LF
    54 CY
    45 SY
    45 SY
    3 EA
    175 LF
    1 LS
    2 EA
    2 EA
    882 LF
    185 LF
    400 LF
    9 Yards Infrastructure, LLC
    (L)
    UNIT PRICE
    $350.00
    $190,000.00
    $11,000.00
    $950.00
    TOTAL PRICE
    $3,150.00
    $190,000.00
    $11,000.00
    $950.00
    $250.00
    $3.90
    $10.00
    $965,000.00
    $18.00
    $29.73
    $39.40
    $140.00
    $5,500.00
    $12,733.50
    $1,000.00
    $965,000.00
    $13,500.00
    $78,992.61
    $3,940.00
    $14,000.00
    $110.00
    $199,870.00
    $106.00
    $283,550.00
    $107.00
    $145.00
    $6.00
    $60.00
    $140.00
    $50.00
    $68.00
    $36.00
    $61.00
    $67.00
    $40.00
    $14.00
    $14.00
    $22.00
    $2.00
    $275.00
    $58.00
    $8.00
    $11,400.00
    $1.85
    $45,000.00
    $1,310.00
    $2,250.00
    $84.00
    $84.00
    $2.00
    $143,380.00
    $145,725.00
    $4,380.00
    $28,560.00
    $79,800.00
    $5,750.00
    $340.00
    $43,380.00
    $39,955.00
    $20,100.00
    $1,800.00
    $4,536.00
    $5,754.00
    $63,624.00
    $6,078.00
    $14,850.00
    $2,610.00
    $360.00
    $34,200.00
    $323.75
    $45,000.00
    $2,620.00
    $4,500.00
    $74,088.00
    $15,540.00
    $800.00
    BID TABULATION
    Azimuth Constractors, LLC
    (OC)
    UNIT PRICE
    $225.00
    $297,000.00
    $9,100.00
    $950.00
    TOTAL PRICE
    $2,025.00
    $297,000.00
    $9,100.00
    $950.00
    $200.00
    $3.90
    $45.33
    $600,063.64
    $18.00
    $30.18
    $30.18
    $175.00
    $4,400.00
    $12,733.50
    $4,533.00
    $600,063.64
    $13,500.00
    $80,188.26
    $3,018.00
    $17,500.00
    $115.00
    $208,955.00
    $110.00
    $294,250.00
    $105.00
    $142.00
    $5.00
    $30.00
    $144.12
    $49.20
    $60.45
    $36.14
    $60.02
    $59.56
    $49.20
    $14.46
    $14.46
    $21.70
    $5.00
    $269.68
    $70.09
    $5.00
    $8,600.00
    $2.75
    $45,500.00
    $1,181.86
    $1,296.16
    $57.43
    $75.67
    $35.50
    $140,700.00
    $142,710.00
    $3,650.00
    $14,280.00
    $82,148.40
    $5,658.00
    $302.25
    $43,548.70
    $39,313.10
    $17,868.00
    $2,214.00
    $4,685.04
    $5,943.06
    $62,756.40
    $15,195.00
    $14,562.72
    $3,154.05
    $225.00
    $25,800.00
    $481.25
    $45,500.00
    $2,363.72
    $2,592.32
    $50,653.26
    $13,998.95
    $14,200.00
    Backbone Infrastructure, LLC
    (L)
    UNIT PRICE
    $375.00
    $95,820.00
    $6,500.00
    $650.00
    TOTAL PRICE
    $3,375.00
    $95,820.00
    $6,500.00
    $650.00
    $475.00
    $4.00
    $45.00
    $819,233.00
    $18.00
    $32.00
    $35.00
    $200.00
    $10,450.00
    $13,060.00
    $4,500.00
    $819,233.00
    $13,500.00
    $85,024.00
    $3,500.00
    $20,000.00
    $130.00
    $236,210.00
    $98.00
    $262,150.00
    $100.00
    $120.00
    $4.00
    $50.00
    $143.00
    $58.00
    $62.50
    $50.00
    $60.00
    $83.00
    $60.00
    $15.00
    $15.00
    $25.00
    $5.00
    $250.00
    $72.00
    $6.00
    $5,000.00
    $2.00
    $78,590.00
    $1,250.00
    $1,550.00
    $60.00
    $80.00
    $30.00
    $134,000.00
    $120,600.00
    $2,920.00
    $23,800.00
    $81,510.00
    $6,670.00
    $312.50
    $60,250.00
    $39,300.00
    $24,900.00
    $2,700.00
    $4,860.00
    $6,165.00
    $72,300.00
    $15,195.00
    $13,500.00
    $3,240.00
    $270.00
    $15,000.00
    $350.00
    $78,590.00
    $2,500.00
    $3,100.00
    $52,920.00
    $14,800.00
    $12,000.00
    CMC, Inc.
    (L)
    UNIT PRICE
    $225.00
    $257,457.79
    $37,300.00
    $830.00
    TOTAL PRICE
    $2,025.00
    $257,457.79
    $37,300.00
    $830.00
    $260.00
    $4.00
    $46.30
    $681,608.46
    $18.00
    $33.50
    $34.25
    $96.00
    $5,720.00
    $13,060.00
    $4,630.00
    $681,608.46
    $13,500.00
    $89,009.50
    $3,425.00
    $9,600.00
    $113.00
    $205,321.00
    $87.50
    $234,062.50
    $89.70
    $110.00
    $4.70
    $28.50
    $145.50
    $55.30
    $56.00
    $42.50
    $64.00
    $73.50
    $55.30
    $17.00
    $18.50
    $24.25
    $5.50
    $165.00
    $65.20
    $4.00
    $6,500.00
    $3.50
    $62,250.00
    $1,730.00
    $1,825.00
    $65.50
    $82.75
    $16.40
    $120,198.00
    $110,550.00
    $3,431.00
    $13,566.00
    $82,935.00
    $6,359.50
    $280.00
    $51,212.50
    $41,920.00
    $22,050.00
    $2,488.50
    $5,508.00
    $7,603.50
    $70,131.00
    $16,714.50
    $8,910.00
    $2,934.00
    $180.00
    $19,500.00
    $612.50
    $62,250.00
    $3,460.00
    $3,650.00
    $57,771.00
    $15,308.75
    $6,560.00
    PAGE 1 of 4
    E.R. Snell Contractor, Inc.
    (L)
    UNIT PRICE
    $1,630.00
    $106,900.00
    $16,800.00
    $1,150.00
    TOTAL PRICE
    $14,670.00
    $106,900.00
    $16,800.00
    $1,150.00
    $530.00
    $13.25
    $125.00
    $523,673.00
    $18.00
    $45.50
    $68.00
    $297.00
    $11,660.00
    $43,261.25
    $12,500.00
    $523,673.00
    $13,500.00
    $120,893.50
    $6,800.00
    $29,700.00
    $132.00
    $239,844.00
    $96.50
    $258,137.50
    $99.50
    $126.50
    $3.25
    $17.00
    $196.00
    $86.25
    $243.00
    $67.25
    $120.00
    $138.00
    $84.50
    $28.00
    $29.50
    $36.75
    $6.45
    $362.00
    $140.00
    $5.25
    $10,900.00
    $3.85
    $149,900.00
    $1,030.00
    $1,170.00
    $104.00
    $109.00
    $43.50
    $133,330.00
    $127,132.50
    $2,372.50
    $8,092.00
    $111,720.00
    $9,918.75
    $1,215.00
    $81,036.25
    $78,600.00
    $41,400.00
    $3,802.50
    $9,072.00
    $12,124.50
    $106,281.00
    $19,601.55
    $19,548.00
    $6,300.00
    $236.25
    $32,700.00
    $673.75
    $149,900.00
    $2,060.00
    $2,340.00
    $91,728.00
    $20,165.00
    $17,400.00
    km
    BL118-25
    South Rockbridge Road at North Deshong Road Intersection Improvement Project
    Department of Transportation
    ITEM #
    DESCRIPTION
    205 RECONSTR CATCH BASIN, GROUP 1
    210 RECONSTR DROP INLET, GROUP 1
    215 RECONSTR STORM SEW MANHOLE, TYPE 1
    220 CATCH BASIN, GP 1
    225 CATCH BASIN, GP 1, SPCL DES
    230 CATCH BASIN, GP 1, ADDL DEPTH
    235 DROP INLET, GP 1
    240 DROP INLET, GP 1, ADDL DEPTH
    245 STORM SEWER MANHOLE, TP 1
    250 STORM SEWER MANHOLE, TP 1 ADDL DEPTH
    255 REM HIGHWAY SIGN - PARK SIGN
    260 RESET SIGN - PARK SIGN
    265 HIGHWAY SIGNS, TP 1 MATL, REFL SHEETING, TP 9
    270 HIGHWAY SIGNS, TP 1 MATL, REFL SHEETING, TP 11
    275 GALV STEEL POSTS, TP 7
    280 FLEXIBLE POST TP 2B
    285 THERMOPLASTIC PAVEMENT MARKING, ARROW, TP 1
    290 THERMOPLASTIC PAVEMENT MARKING, ARROW, TP 2
    295 THERMOPLASTIC PAVEMENT MARKING, ARROW, TP 3
    300 THERMOPLASTIC PAVEMENT WORD, TP 1
    305 THERMOPLASTIC PAVEMENT MARKING, WORD, TP 15
    310
    THERMOPLASTIC SOLID TRAFFIC STRIPE, 24 IN, WHITE
    (FOR CROSSWALKS)
    315
    THERMOPLASTIC SOLID TRAFFIC STRIPE, 8 IN, WHITE (FOR
    CROSSWALKS)
    320 THERMOPLASTIC SKIP TRAF STRIPE, 18 IN, WHITE
    325
    THERMOPLASTIC TRAF STRIPING, YELLOW (ISLAND
    HATCHING)
    330
    WET WEATHER THERMOPLASTIC SOLID TRAF STRIPE, 6 IN,
    WHITE
    335
    WET WEATHER THERMOPLASTIC SOLID TRAF STRIPE, 6 IN,
    YELLOW
    340
    WET WEATHER THERMOPLASTIC SKIP TRAF STRIPE, 6 IN,
    WHITE
    345 RAISED PVMT MARKERS, TP 1 & TP3
    350 WATER SERVICE CONNECTIONS 3/4 IN - 1 IN LONG SIDE
    355
    RELOCATION AND/OR RECONNECTION OF EXISTING FIRE
    HYDRANTS
    360 ADJUST EXISTING FIRE HYDRANTS
    365 ADJUST VALVE BOX
    APPROX. QTY
    3 EA
    1 EA
    1 EA
    5 EA
    1 EA
    1 LF
    11 EA
    10 LF
    1 EA
    1 LF
    1 EA
    1 EA
    138 SF
    320 SF
    306 LF
    24 LF
    1 EA
    8 EA
    3 EA
    1 EA
    3 EA
    208 LF
    320 LF
    154 GLF
    1,149 SY
    1,181 LF
    575 LF
    960 GLF
    106 EA
    3 EA
    1 EA
    1 VF
    5 EA
    TOTAL
    9 Yards Infrastructure, LLC
    (L)
    UNIT PRICE
    $3,360.00
    $4,300.00
    $3,500.00
    $4,795.00
    $3,900.00
    $250.00
    $7,800.00
    $250.00
    $4,600.00
    $250.00
    $250.00
    $250.00
    $26.00
    $23.00
    $14.00
    $30.00
    $105.00
    $100.00
    $140.00
    $135.00
    $140.00
    $5.50
    TOTAL PRICE
    $10,080.00
    $4,300.00
    $3,500.00
    $23,975.00
    $3,900.00
    $250.00
    $85,800.00
    $2,500.00
    $4,600.00
    $250.00
    $250.00
    $250.00
    $3,588.00
    $7,360.00
    $4,284.00
    $720.00
    $105.00
    $800.00
    $420.00
    $135.00
    $420.00
    $1,144.00
    $2.50
    $2.00
    $5.65
    $800.00
    $308.00
    $6,491.85
    $1.15
    $1,358.15
    $1.15
    $661.25
    $0.65
    $5.00
    $2,800.00
    $11,703.00
    $900.00
    $150.00
    $624.00
    $530.00
    $8,400.00
    $11,703.00
    $900.00
    $750.00
    $2,762,397.11
    BID TABULATION
    Azimuth Constractors, LLC
    (OC)
    UNIT PRICE
    $6,595.78
    $4,025.33
    $4,063.74
    $4,127.06
    $1,622.55
    $284.60
    $4,025.33
    $284.60
    $4,063.74
    $284.60
    $50.00
    $150.00
    $25.42
    $22.66
    $14.07
    $30.02
    $105.00
    $100.00
    $140.00
    $135.00
    $140.00
    $5.50
    TOTAL PRICE
    $19,787.34
    $4,025.33
    $4,063.74
    $20,635.30
    $1,622.55
    $284.60
    $44,278.63
    $2,846.00
    $4,063.74
    $284.60
    $50.00
    $150.00
    $3,507.96
    $7,251.20
    $4,305.42
    $720.48
    $105.00
    $800.00
    $420.00
    $135.00
    $420.00
    $1,144.00
    $2.50
    $2.00
    $5.65
    $800.00
    $308.00
    $6,491.85
    $1.15
    $1,358.15
    $1.15
    $661.25
    $0.65
    $5.00
    $2,800.00
    $11,703.00
    $900.00
    $150.00
    $624.00
    $530.00
    $8,400.00
    $11,703.00
    $900.00
    $750.00
    $2,456,146.76
    Backbone Infrastructure, LLC
    (L)
    UNIT PRICE
    $3,500.00
    $4,000.00
    $5,200.00
    $5,400.00
    $4,800.00
    $350.00
    $7,500.00
    $350.00
    $8,000.00
    $350.00
    $80.00
    $160.00
    $21.50
    $21.50
    $13.00
    $85.00
    $105.00
    $100.00
    $140.00
    $135.00
    $140.00
    $5.50
    TOTAL PRICE
    $10,500.00
    $4,000.00
    $5,200.00
    $27,000.00
    $4,800.00
    $350.00
    $82,500.00
    $3,500.00
    $8,000.00
    $350.00
    $80.00
    $160.00
    $2,967.00
    $6,880.00
    $3,978.00
    $2,040.00
    $105.00
    $800.00
    $420.00
    $135.00
    $420.00
    $1,144.00
    $2.50
    $2.00
    $6.00
    $800.00
    $308.00
    $6,894.00
    $1.50
    $1,771.50
    $1.20
    $690.00
    $0.65
    $5.00
    $2,800.00
    $11,700.00
    $900.00
    $150.00
    $624.00
    $530.00
    $8,400.00
    $11,700.00
    $900.00
    $750.00
    $2,564,421.00
    CMC, Inc.
    (L)
    UNIT PRICE
    $2,850.00
    $2,600.00
    $3,450.00
    $4,830.00
    $4,360.00
    $300.00
    $5,600.00
    $300.00
    $4,650.00
    $300.00
    $100.00
    $150.00
    $26.50
    $27.00
    $11.00
    $125.00
    $100.00
    $100.00
    $250.00
    $250.00
    $350.00
    $8.50
    TOTAL PRICE
    $8,550.00
    $2,600.00
    $3,450.00
    $24,150.00
    $4,360.00
    $300.00
    $61,600.00
    $3,000.00
    $4,650.00
    $300.00
    $100.00
    $150.00
    $3,657.00
    $8,640.00
    $3,366.00
    $3,000.00
    $100.00
    $800.00
    $750.00
    $250.00
    $1,050.00
    $1,768.00
    $3.00
    $5.00
    $6.00
    $960.00
    $770.00
    $6,894.00
    $2.00
    $2,362.00
    $2.00
    $1,150.00
    $1.50
    $5.00
    $2,500.00
    $5,600.00
    $1,500.00
    $150.00
    $1,440.00
    $530.00
    $7,500.00
    $5,600.00
    $1,500.00
    $750.00
    $2,459,680.00
    PAGE 2 of 4
    E.R. Snell Contractor, Inc.
    (L)
    UNIT PRICE
    $7,330.00
    $7,110.00
    $7,110.00
    $7,330.00
    $16,300.00
    $662.00
    $7,110.00
    $662.00
    $7,110.00
    $662.00
    $1,040.00
    $2,590.00
    $27.50
    $24.50
    $15.25
    $32.50
    $111.00
    $111.00
    $166.00
    $166.00
    $222.00
    $6.65
    TOTAL PRICE
    $21,990.00
    $7,110.00
    $7,110.00
    $36,650.00
    $16,300.00
    $662.00
    $78,210.00
    $6,620.00
    $7,110.00
    $662.00
    $1,040.00
    $2,590.00
    $3,795.00
    $7,840.00
    $4,666.50
    $780.00
    $111.00
    $888.00
    $498.00
    $166.00
    $666.00
    $1,383.20
    $2.20
    $4.45
    $7.20
    $704.00
    $685.30
    $8,272.80
    $1.65
    $1,948.65
    $1.65
    $948.75
    $1.10
    $8.30
    $3,040.00
    $12,700.00
    $977.00
    $163.00
    $1,056.00
    $879.80
    $9,120.00
    $12,700.00
    $977.00
    $815.00
    $2,733,193.80
    km
    BID TABULATION
    BL118-25
    South Rockbridge Road at North Deshong Road Intersection Improvement Project
    Department of Transportation
    ITEM #
    DESCRIPTION
    005 AERIAL PHOTOGRAPH DOCUMENTATION
    APPROX. QTY
    9 MO
    010 TRAFFIC CONTROL - PROJECT NO.: M-1377-01
    1 LS
    015 EROSION CONTROL - PROJECT NO.: M-1377-01
    020
    CONSTRUCT, MAINTAIN AND REMOVE SILT CONTROL GATE
    TP 3
    025
    CONSTRUCT, MAINTAIN AND REMOVE INLET SEDIMENT
    TRAP
    030 TEMPORARY SILT FENCE, TP C
    035 FOUNDATION BACKFILL MATERIAL, TP II
    040 GRADING COMPLETE - PROJECT NO.: M-1377-01
    045
    UNDERCUT EXCAVATION - PROJECT NO.: M-1377-01 (PER
    SPECIFICATION 210.5C)
    050 GR AGGR BASE CRS, INCL MATL
    055 AGGREGATE SURFACE COURSE
    060
    RECYCLED ASPHALT CONCRETE PATCHING, INCL BITUM
    MATL &H LIME
    065
    RECYCLED ASPH CONC LEVELING, INCL BITUM MATL & H
    LIME
    1 LS
    1 EA
    22 EA
    3,265 LF
    100 TN
    1 LS
    750 CY
    2,657 TN
    100 TN
    100 TN
    1,817 TN
    070
    RECYCLED ASPH CONC 25 MM SUPERPAVE, GP 1 OR 2,
    INCL BITUM MATL & H LIME
    2,675 TN
    075
    RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2,
    INCL BITUM MATL & H LIME
    080
    RECYCLED ASPH CONC 12.5 MM SUPERPAVE, GP 2 ONLY,
    INCL POLY MOD BITUM MATL & H LIME
    085 TACK COAT
    090 MILL ASPH CONC PVMT, VARIABLE DEPTH
    095 PLAIN PC CONC PVMT, CL 3 CONC, 10 INCH THK
    100 DRIVEWAY CONCRETE, 6 IN TK
    105 CONC SLOPE DRAIN
    110 CONC SIDEWALK, 4 IN
    115 CONC SIDEWALK, 8 IN
    120 CONCRETE MEDIAN, 7 1/2 IN
    125 CONC VALLEY GUTTER, 6 IN
    130 HEADER CURB, 4 IN, TP 1
    135 HEADER CURB, 4 IN, TP 9
    140 CONC CURB & GUTTER, 8 IN X 30 IN, TP 2
    145 PVMT REINF FABRIC STRIPS, TP 2, 18 INCH WIDTH
    150 CLASS B CONC, BASE OR PVMT WIDENING
    155 STN DUMPED RIP RAP, TP 3 18 IN
    160 PLASTIC FILTER FABRIC
    165 CHANGEABLE MESSAGE SIGN , PORTABLE, TYPE 3
    170 BARRIER FENCE (ORANGE), 4 FT
    175 GRASSING COMPLETE (SOD) - PROJECT NO.: M-1377-01
    180 FLARED END SECTION 18 IN, STORM DRAIN
    185 FLARED END SECTION 24 IN, STORM DRAIN
    190 STORM DRAIN PIPE, 18 IN, CLASS III
    195 STORM DRAIN PIPE, 24 IN, CLASS III
    200 UNDERDRAIN PIPE, INCL DRAINAGE AGGR, 6 IN
    1,340 TN
    1,005 TN
    730 GL
    476 SY
    570 SY
    115 SY
    5 SY
    1,205 SY
    655 SY
    300 SY
    45 SY
    324 LF
    411 LF
    2,892 LF
    3,039 LF
    54 CY
    45 SY
    45 SY
    3 EA
    175 LF
    1 LS
    2 EA
    2 EA
    882 LF
    185 LF
    400 LF
    Ohmshiv Construction, LLC
    (L)
    UNIT PRICE
    $350.00
    $115,000.00
    $15,000.00
    $300.00
    TOTAL PRICE
    $3,150.00
    $115,000.00
    $15,000.00
    $300.00
    $150.00
    $3.50
    $50.00
    $809,713.00
    $18.00
    $36.00
    $36.00
    $176.00
    $3,300.00
    $11,427.50
    $5,000.00
    $809,713.00
    $13,500.00
    $95,652.00
    $3,600.00
    $17,600.00
    $110.00
    $199,870.00
    $107.00
    $286,225.00
    $106.00
    $131.00
    $5.05
    $30.10
    $150.00
    $53.00
    $68.00
    $42.25
    $64.00
    $55.00
    $53.00
    $21.00
    $23.00
    $25.00
    $5.05
    $240.00
    $65.00
    $4.00
    $4,000.00
    $2.00
    $52,000.00
    $1,100.00
    $1,200.00
    $75.00
    $98.00
    $15.00
    $142,040.00
    $131,655.00
    $3,686.50
    $14,327.60
    $85,500.00
    $6,095.00
    $340.00
    $50,911.25
    $41,920.00
    $16,500.00
    $2,385.00
    $6,804.00
    $9,453.00
    $72,300.00
    $15,346.95
    $12,960.00
    $2,925.00
    $180.00
    $12,000.00
    $350.00
    $52,000.00
    $2,200.00
    $2,400.00
    $66,150.00
    $18,130.00
    $6,000.00
    The Scruggs Company d.b.a. Sunbelt Summit Construction & Development,
    Asphalt Surfaces, Inc.
    LLC
    (OC)
    (L)
    UNIT PRICE
    $900.00
    $117,895.59
    $13,445.00
    TOTAL PRICE
    $8,100.00
    $117,895.59
    $13,445.00
    UNIT PRICE
    $350.00
    $92,100.00
    $5,000.00
    TOTAL PRICE
    $3,150.00
    $92,100.00
    $5,000.00
    $650.00
    $650.00
    $650.00
    $650.00
    $375.00
    $4.00
    $55.00
    $298,635.89
    $18.00
    $39.00
    $39.00
    $200.00
    $8,250.00
    $13,060.00
    $5,500.00
    $298,635.89
    $13,500.00
    $103,623.00
    $3,900.00
    $20,000.00
    $220.00
    $2.80
    $94.00
    $801,756.96
    $18.00
    $45.00
    $45.00
    $110.00
    $4,840.00
    $9,142.00
    $9,400.00
    $801,756.96
    $13,500.00
    $119,565.00
    $4,500.00
    $11,000.00
    $155.00
    $281,635.00
    $140.00
    $254,380.00
    $125.00
    $334,375.00
    $130.00
    $347,750.00
    $125.00
    $167,500.00
    $130.00
    $174,200.00
    $135.00
    $4.00
    $8.00
    $199.00
    $87.00
    $247.00
    $55.00
    $105.00
    $139.00
    $85.00
    $28.40
    $29.80
    $37.00
    $12.00
    $345.00
    $107.22
    $20.00
    $15,500.00
    $2.25
    $105,450.00
    $1,693.00
    $1,918.74
    $73.02
    $107.58
    $70.00
    $135,675.00
    $2,920.00
    $3,808.00
    $113,430.00
    $10,005.00
    $1,235.00
    $66,275.00
    $68,775.00
    $41,700.00
    $3,825.00
    $9,201.60
    $12,247.80
    $107,004.00
    $36,468.00
    $18,630.00
    $4,824.90
    $900.00
    $46,500.00
    $393.75
    $105,450.00
    $3,386.00
    $3,837.48
    $64,403.64
    $19,902.30
    $28,000.00
    $140.00
    $5.50
    $12.50
    $240.00
    $74.00
    $54.00
    $54.00
    $84.00
    $80.00
    $75.00
    $22.00
    $24.00
    $28.00
    $8.50
    $200.00
    $120.00
    $3.50
    $5,000.00
    $1.88
    $75,000.00
    $850.00
    $950.00
    $70.00
    $84.00
    $25.00
    $140,700.00
    $4,015.00
    $5,950.00
    $136,800.00
    $8,510.00
    $270.00
    $65,070.00
    $55,020.00
    $24,000.00
    $3,375.00
    $7,128.00
    $9,864.00
    $80,976.00
    $25,831.50
    $10,800.00
    $5,400.00
    $157.50
    $15,000.00
    $329.00
    $75,000.00
    $1,700.00
    $1,900.00
    $61,740.00
    $15,540.00
    $10,000.00
    Vertical Earth, Inc.
    (OC)
    UNIT PRICE
    $482.90
    $61,388.01
    $12,953.85
    $1,201.59
    TOTAL PRICE
    $4,346.10
    $61,388.01
    $12,953.85
    $1,201.59
    $202.80
    $3.71
    $64.93
    $688,637.36
    $18.00
    $37.72
    $73.06
    $302.65
    $4,461.60
    $12,113.15
    $6,493.00
    $688,637.36
    $13,500.00
    $100,222.04
    $7,306.00
    $30,265.00
    $136.32
    $247,693.44
    $102.85
    $275,123.75
    $103.81
    $144.11
    $5.89
    $20.11
    $119.81
    $55.31
    $332.47
    $41.28
    $66.71
    $72.94
    $75.75
    $22.29
    $16.18
    $16.10
    $3.60
    $310.55
    $106.58
    $5.28
    $13,200.00
    $1.01
    $44,472.75
    $1,579.19
    $1,783.23
    $74.54
    $111.70
    $24.10
    $139,105.40
    $144,830.55
    $4,299.70
    $9,572.36
    $68,291.70
    $6,360.65
    $1,662.35
    $49,742.40
    $43,695.05
    $21,882.00
    $3,408.75
    $7,221.96
    $6,649.98
    $46,561.20
    $10,940.40
    $16,769.70
    $4,796.10
    $237.60
    $39,600.00
    $176.75
    $44,472.75
    $3,158.38
    $3,566.46
    $65,744.28
    $20,664.50
    $9,640.00
    PAGE 3 of 4
    km
    BID TABULATION
    BL118-25
    South Rockbridge Road at North Deshong Road Intersection Improvement Project
    Department of Transportation
    Ohmshiv Construction, LLC
    (L)
    ITEM #
    DESCRIPTION
    205 RECONSTR CATCH BASIN, GROUP 1
    210 RECONSTR DROP INLET, GROUP 1
    215 RECONSTR STORM SEW MANHOLE, TYPE 1
    220 CATCH BASIN, GP 1
    225 CATCH BASIN, GP 1, SPCL DES
    230 CATCH BASIN, GP 1, ADDL DEPTH
    235 DROP INLET, GP 1
    240 DROP INLET, GP 1, ADDL DEPTH
    245 STORM SEWER MANHOLE, TP 1
    250 STORM SEWER MANHOLE, TP 1 ADDL DEPTH
    255 REM HIGHWAY SIGN - PARK SIGN
    260 RESET SIGN - PARK SIGN
    265 HIGHWAY SIGNS, TP 1 MATL, REFL SHEETING, TP 9
    270 HIGHWAY SIGNS, TP 1 MATL, REFL SHEETING, TP 11
    275 GALV STEEL POSTS, TP 7
    280 FLEXIBLE POST TP 2B
    285 THERMOPLASTIC PAVEMENT MARKING, ARROW, TP 1
    290 THERMOPLASTIC PAVEMENT MARKING, ARROW, TP 2
    295 THERMOPLASTIC PAVEMENT MARKING, ARROW, TP 3
    300 THERMOPLASTIC PAVEMENT WORD, TP 1
    305 THERMOPLASTIC PAVEMENT MARKING, WORD, TP 15
    310
    THERMOPLASTIC SOLID TRAFFIC STRIPE, 24 IN, WHITE
    (FOR CROSSWALKS)
    315
    THERMOPLASTIC SOLID TRAFFIC STRIPE, 8 IN, WHITE (FOR
    CROSSWALKS)
    320 THERMOPLASTIC SKIP TRAF STRIPE, 18 IN, WHITE
    325
    THERMOPLASTIC TRAF STRIPING, YELLOW (ISLAND
    HATCHING)
    330
    WET WEATHER THERMOPLASTIC SOLID TRAF STRIPE, 6 IN,
    WHITE
    335
    WET WEATHER THERMOPLASTIC SOLID TRAF STRIPE, 6 IN,
    YELLOW
    340
    WET WEATHER THERMOPLASTIC SKIP TRAF STRIPE, 6 IN,
    WHITE
    345 RAISED PVMT MARKERS, TP 1 & TP3
    350 WATER SERVICE CONNECTIONS 3/4 IN - 1 IN LONG SIDE
    355
    RELOCATION AND/OR RECONNECTION OF EXISTING FIRE
    HYDRANTS
    360 ADJUST EXISTING FIRE HYDRANTS
    365 ADJUST VALVE BOX
    APPROX. QTY
    3 EA
    1 EA
    1 EA
    5 EA
    1 EA
    1 LF
    11 EA
    10 LF
    1 EA
    1 LF
    1 EA
    1 EA
    138 SF
    320 SF
    306 LF
    24 LF
    1 EA
    8 EA
    3 EA
    1 EA
    3 EA
    208 LF
    320 LF
    154 GLF
    1,149 SY
    1,181 LF
    575 LF
    960 GLF
    106 EA
    3 EA
    1 EA
    1 VF
    5 EA
    TOTAL
    UNIT PRICE
    $3,000.00
    $3,000.00
    $3,000.00
    $6,000.00
    $4,500.00
    $250.00
    $5,850.00
    $250.00
    $5,250.00
    $250.00
    $100.00
    $125.00
    $26.00
    $26.00
    $15.00
    $125.00
    $105.00
    $100.00
    $140.00
    $135.00
    $140.00
    $5.50
    TOTAL PRICE
    $9,000.00
    $3,000.00
    $3,000.00
    $30,000.00
    $4,500.00
    $250.00
    $64,350.00
    $2,500.00
    $5,250.00
    $250.00
    $100.00
    $125.00
    $3,588.00
    $8,320.00
    $4,590.00
    $3,000.00
    $105.00
    $800.00
    $420.00
    $135.00
    $420.00
    $1,144.00
    $2.50
    $2.00
    $5.65
    $800.00
    $308.00
    $6,491.85
    $1.15
    $1,358.15
    $1.15
    $661.25
    $0.65
    $5.00
    $2,250.00
    $10,000.00
    $850.00
    $200.00
    $624.00
    $530.00
    $6,750.00
    $10,000.00
    $850.00
    $1,000.00
    $2,528,117.05
    Recommended Vendor:
    Vertical Earth, Inc.
    Attn: Brett Johnnson
    6025 Matt Highway
    Cumming, GA 30028
    Phone: 770-888-2224
    bjohnson@vertical-earth.com
    The Scruggs Company d.b.a. Sunbelt Summit Construction & Development,
    Asphalt Surfaces, Inc.
    LLC
    (OC)
    (L)
    UNIT PRICE
    $4,875.00
    $4,710.00
    $4,620.00
    $6,345.00
    $9,850.00
    $575.00
    $5,495.00
    $475.00
    $6,555.00
    $575.00
    $100.00
    $100.00
    $26.00
    $24.50
    $12.50
    $100.00
    $120.00
    $115.00
    $160.00
    $150.00
    $160.00
    TOTAL PRICE
    $14,625.00
    $4,710.00
    $4,620.00
    $31,725.00
    $9,850.00
    $575.00
    $60,445.00
    $4,750.00
    $6,555.00
    $575.00
    $100.00
    $100.00
    $3,588.00
    $7,840.00
    $3,825.00
    $2,400.00
    $120.00
    $920.00
    $480.00
    $150.00
    $480.00
    UNIT PRICE
    $5,000.00
    $3,500.00
    $3,500.00
    $5,000.00
    $5,000.00
    $10.00
    $4,500.00
    $10.00
    $4,500.00
    $10.00
    $50.00
    $150.00
    $24.43
    $24.24
    $16.80
    $50.00
    $107.00
    $107.00
    $162.00
    $162.00
    $214.00
    TOTAL PRICE
    $15,000.00
    $3,500.00
    $3,500.00
    $25,000.00
    $5,000.00
    $10.00
    $49,500.00
    $100.00
    $4,500.00
    $10.00
    $50.00
    $150.00
    $3,371.34
    $7,756.80
    $5,140.80
    $1,200.00
    $107.00
    $856.00
    $486.00
    $162.00
    $642.00
    $6.20
    $1,289.60
    $6.48
    $1,347.84
    $2.80
    $2.25
    $6.25
    $896.00
    $346.50
    $7,181.25
    $2.16
    $4.32
    $7.02
    $691.20
    $665.28
    $8,065.98
    $1.30
    $1,535.30
    $1.62
    $1,913.22
    $1.30
    $747.50
    $1.62
    $931.50
    $0.75
    $5.50
    $3,200.00
    $2,545.00
    $1,545.00
    $500.00
    $720.00
    $583.00
    $9,600.00
    $2,545.00
    $1,545.00
    $2,500.00
    $2,486,789.10
    $1.08
    $8.10
    $2,500.00
    $6,500.00
    $2,500.00
    $850.00
    $1,036.80
    $858.60
    $7,500.00
    $6,500.00
    $2,500.00
    $4,250.00
    $2,778,312.32
    Vertical Earth, Inc.
    (OC)
    UNIT PRICE
    $4,606.96
    $2,148.21
    $4,025.88
    $6,480.38
    $7,465.00
    $412.81
    $4,403.47
    $460.79
    $4,760.57
    $421.27
    $202.80
    $405.60
    $22.31
    $22.31
    $11.15
    $126.75
    $101.40
    $101.40
    $152.10
    $152.10
    $202.80
    $6.08
    TOTAL PRICE
    $13,820.88
    $2,148.21
    $4,025.88
    $32,401.90
    $7,465.00
    $412.81
    $48,438.17
    $4,607.90
    $4,760.57
    $421.27
    $202.80
    $405.60
    $3,078.78
    $7,139.20
    $3,411.90
    $3,042.00
    $101.40
    $811.20
    $456.30
    $152.10
    $608.40
    $1,264.64
    $2.03
    $4.06
    $6.59
    $649.60
    $625.24
    $7,571.91
    $1.52
    $1,795.12
    $1.52
    $874.00
    $1.01
    $7.61
    $2,788.50
    $3,549.00
    $3,042.00
    $507.00
    $969.60
    $806.66
    $8,365.50
    $3,549.00
    $3,042.00
    $2,535.00
    $2,408,716.40
    PAGE 4 of 4
    km
    This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
    Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL

    See also

    Interior Renovation to Houston County Schools Flint Building Bid Date: June 30, 2026

    Altman + Barrett Architects

    Bid Due: 6/30/2026

    Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-66325-NONST-2026-000000014

    State Government of Georgia

    Bid Due: 7/02/2026

    Follow VISN 7 CONSTRUCTION MATOC 36C24726R0026 - SOLICITATION Active Contract Opportunity Notice ID

    VETERANS AFFAIRS, DEPARTMENT OF

    Bid Due: 6/17/2026

    Follow Flood Mitigation and Site Improvements Kingston Commons Active Contract Opportunity Notice ID

    HOMELAND SECURITY, DEPARTMENT OF

    Bid Due: 7/01/2026

    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.