| Location: | Nevada |
|---|---|
| Posted: | Apr 22, 2026 |
| Due: | May 5, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W50S8C-26-Q-A009 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
RFI 02 - 22 April 2026:
Please see attachment RFI00002 for updated information.
_______________________________________________________________
RFI 01 - 16 April 2026:
Providing answers to RFIs received as of 16 April 2026.
1. Do you have any electrical specs of what is currently in use? Can it be reused for the new compressor?
1a. Yes, it is reusable.
2. Is there any equipment on site that can be used for removal and installation? Pallet jacks, dollies, forklifts?
2a. Yes, we will have access to all needed tools.
_________________________________________________________________________________________________
1. This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued.
2. Solicitation number W50S8C-26-Q-A009 is issued as a request for quotation (RFQ) for a supply and service of installing a new SCBA Air compressor and the removal of the old one.
3. IAW FAR 19.501 a "set-aside for small business" is the limiting of an acquisition exclusively for participation by small business concerns. A small business set-aside may be open to any of the small business concerns identified at 19.000(a)(3).
The type of set-aside used (if applicable) is: Total Small-Business Set-aside
The Federal Service Code / Product Supply Code is: N043
The North American Industry Size Classification System (NAICS) code associated with this requirement is: 333912
Award will be made to the offeror who represents the best value to the Government as outlined in accordance with the criteria set forth within the solicitation. No contract award will be made until appropriated funds are made available.
Description:
The Nevada Air National Guard, 152 Mission Support Contracting Office in Reno, Nevada, intends to award a Firm Fixed Price Purchase Order for the purchase of equipment and installation of a new Air Compressor for Self-Contained Breathing Apparatus (SCBA). The specifications of the new Air Compressor are within the Performance Work Statement. Additionally, the removal and disposal of the existing system.
Contractor will furnish all labor, supplies, parts, transportation, tools, equipment, inspections and facilities necessary to perform work required to complete the project in accordance with this Performance Work Statement.
The quote shall contain a; part number, description, all relevant product data, delivery/product lead time, installation time, and price. This price should include delivery as FOB destination only. The quote should also provide a total line-item price for all the labor/ installation/testing/inspection involved and provide a bottom-line price for the summation of the quote.
Place of Delivery/Performance/Acceptance/FOB Point:
FOB: Destination
152nd Civil Engineering Squadron
1776 National Guard Way
Reno, NV 89502
Line Item / Description / Quantity / Unit / Unit Price / Extended Price
0001: SCBA Air Compressor (Equipment). Contractor will furnish all labor, supplies, parts, transportation, tools, equipment, inspections and facilities necessary to perform work required to complete the project in accordance with this Performance Work Statement. Quantity: 1. Unit of Measure: Each
0002: SCBA Air Compressor (Removal of old equipment and installation of new equipment). Contractor will furnish all labor, supplies, parts, transportation, tools, equipment, inspections and facilities necessary to perform work required to complete the project in accordance with this Performance Work Statement. Quantity: 1. Unit of Measure: JOB
See attachments:
COMBO
Performance Work Statement
Wage Determination
Provisions and Clauses
| Apr 16, 2026 | [Combined Synopsis/Solicitation (Updated)] 152 CES SCBA Air Compressor |

With GovernmentContracts, you can: