Williams and Deep Creek Surfacing

Location: Idaho
Posted: May 8, 2025
Due: Nov 6, 2024
Agency: AGRICULTURE, DEPARTMENT OF
Type of Government: Federal
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: 1240LT25R0003
Publication URL: To access bid details, please log in.
Follow
Williams and Deep Creek Surfacing
Active
Contract Opportunity
Notice ID
1240LT25R0003
Related Notice
Department/Ind. Agency
AGRICULTURE, DEPARTMENT OF
Sub-tier
FOREST SERVICE
Office
USDA-FS, CSA INTERMOUNTAIN 8
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Presolicitation (Updated)
  • Updated Published Date: May 08, 2025 05:31 pm EDT
  • Original Published Date: Oct 24, 2024 03:06 pm EDT
  • Updated Response Date:
  • Original Response Date: Nov 06, 2024 12:00 pm EST
  • Inactive Policy: Manual
  • Updated Inactive Date: Jul 31, 2025
  • Original Inactive Date: Nov 21, 2024
  • Initiative:
    • None
Classification View Changes
  • Original Set Aside:
  • Updated Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: Z2LB - REPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
  • NAICS Code:
    • 237310 - Highway, Street, and Bridge Construction
  • Place of Performance:
    Salmon , ID
    USA
Description View Changes

This project will involve pit development of a government source, mining materials, crushing pit material into a blended surface course aggregate with commercial source additives.



Items to complete:






    1. Perform roadway reconditioning along project length (7 miles of reconditioning from MP 21 to MP 28 of FSR 101).

    2. Crush, mix, haul, and place surface course aggregate along project length (7 miles of surfacing from MP 21 to MP 28 of FSR 101).





Crush and Stockpile Aggregate includes development and use of pits, either government source or commercial source, to the specified gradation, including adding approximately 2% bentonite by weight to achieve desired properties. Actual % will be based on contractor’s initial materials testing. This includes clearing and grubbing, removing overburden, mining, crushing, mixing aggregate with bentonite using a pugmill, weighing, creating stockpiles (including any loading or hauling to create stockpiles), testing, and final site reclamation including placing overburden, waste materials, mulching, and seeding. Perform the work in accordance with MSHA 30 CFR, part 56.Surfacing - Aggregate Surface Course includes necessary surface preparations before placing aggregate such as: material and quality control testing, surface preparation (reconditioning), clearing and grubbing, spreading, watering, compacting, temporary traffic control, erosion control measures, and all other incidental work to surface the road (see surfacing typical on sheet G-05).Surface to the compacted depth specified in the drawings for the full roadway width, including all existing turnouts and widenings. Intersecting roads shall be bladed, shaped and surfaced for a smooth transition. Spread control and staking for aggregate is the responsibility of the contractor.Protect the environment and resources impacted by all construction activity according to all legal requirements, regulations, specifications, and best management practices (BMPs).East Leesburg Pit: Develop pit for operations, including clearing and grubbing, all incidental to crush and stockpile aggregate payment. Mine, crush, and blend aggregate with approved additives, stockpile material in the pit for surfacing.



Project Location:



The project is located along Williams Creek and Deep Creek Roads (FSR 021 and FSR 101) on the Salmon-Challis National Forest, Lemhi County, Idaho. The base bid line items occur from MP 13.7 to MP 27.7. Option line items start at MP 4 and go up to MP 13.7.



Government pit locations (pit development and/or stockpiling):




  • East Leesburg Pit (lat, long): 45.124, -114.083

  • Williams Summit Pit (lat, long): 45.095, -114.087



Place of Contract Performance: Lemhi County Salmon, ID



Contract Time/Period of Performance: The anticipated start date is Mid-July 2025. The contract time will be 75 calendar days-Base Items and additional 15 days for each option item.



Magnitude of the Proposed Project: In accordance with FAR 36.204, the estimated magnitude of construction for this project is between $1,000,000 and $5,000,000.



Solicitation Date: The solicitation is anticipated to be issued on or after May 22,2025.



Solicitation Documents: All future information about this acquisition, including amendments, will be distributed solely through this site. The complete solicitation package will be attached and made available only through SAM.gov, https://sam.gov/content/home on or after 15 days of this notice. Interested parties are responsible for monitoring this site to ensure that they have the most up-to-date information about this acquisition to include amendments. Anyone wishing to participate in this proposed procurement must obtain a copy from SAM.gov.



Solicitation/Award Type: This requirement is being solicited as a Small Business set-aside, with the intent to award a Firm-Fixed Price contract. A single award will be made from the solicitation.



Contractors are required to be actively registered with the System for Award Management (SAM) https://www.sam.gov prior to submitting a proposal and to be considered for award. Registering in the SAM system is FREE. If you need assistance, please be sure to reach out your local Procurement Technical Assistance Center (PTAC) representative. PTAC is a FREE resource to all small business and your state representative’s contact information can be found at the following website: https://www.aptac-us.org/.



Point of Contact:



Tanya Spanfellner, Contracting Officer, tanya.spanfellner@usda.gov


Attachments/Links
Contact Information View Changes
Contracting Office Address
  • 324 25th ST
  • Ogden , UT 844012310
  • USA
Primary Point of Contact
Secondary Point of Contact


History

Related Document

Oct 24, 2024[Presolicitation (Original)] Williams Creek Surfacing Site Visit
May 7, 2025[Presolicitation (Updated)] Williams Creek Surfacing Site Visit
May 27, 2025[Solicitation (Original)] Williams and Deep Creek Surfacing
Jun 25, 2025[Solicitation (Updated)] Williams and Deep Creek Surfacing
Jul 1, 2025[Solicitation (Updated)] Williams and Deep Creek Surfacing
Jul 3, 2025[Solicitation (Updated)] Williams and Deep Creek Surfacing
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...staking, mulching, and ensuring proper establishment practices Monitor and treat trees for pests...

ENERGY, DEPARTMENT OF

Bid Due: 6/19/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.