| Location: | Vermont |
|---|---|
| Posted: | May 15, 2026 |
| Due: | Jun 10, 2026 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Washington Keywords: Construction (Non Building), Concrete, Culvert Replacement, Stream Restoration Bid Description: An existing undersized culvert under Baptist Street will be replaced with a new concrete structure. The work will require an open cut of the roadway and the road will be closed with a detour in place. The existing pipe culvert and failing headwalls will be removed. A 3-sided precast culvert on cast-in-place footings will be installed. Headwalls, wingwalls and guardrail will be constructed. The project also includes channel work to establish a stable, natural stream channel through the crossing. The plans are too large to upload. Email Jessica for attachments.
|
||||||||||||||||||||

With GovernmentContracts, you can:
...Design Engineering: East Hill Rd Culvert Replacement Request Date: 9/28/2026 6:45:07 AM Open ...
State Government of Vermont
Bid Due: 10/23/2026
...) Engineering Design Services - Grassy Brook Road Culvert 1. Introduction The Town ...
State Government of Vermont
Bid Due: 11/18/2026
...CONSTRUCTION: Work to be performed under this project includes the removal of a ...
State of Vermont - Agency of Transportation
Bid Due: 10/23/2026