| Location: | Vermont |
|---|---|
| Posted: | May 15, 2026 |
| Due: | Jun 10, 2026 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Washington Keywords: Construction (Non Building), Landscaping, General Contractor, Stream Restoration Bid Description: The Habbep Dam on the Stevens Branch will be removed along with accumulated sediment. Work tasks will generally involve removal of the concrete dam (~320 CY) and associated remains; removal of trees; sediment removal and haul from river (~15,300 CY) and floodplain (~1,600 CY); invasive species handling; stream channel restoration using onsite bed materials; floodplain and stream restoration with wood; armoring; and site restoration. Plans are too large to attach. Please email Jessica Louisos for the plans.
|
||||||||||||||||||||||

With GovernmentContracts, you can:
...RFP - Trout River Floodplain Restoration Final Design Request Date: 7/17/2026 2:34:47 PM ...
State Government of Vermont
Bid Due: 8/14/2026
...Poultney River Tributary Stream and Wetland Restoration Request Date: 7/7/2026 12:44:34 PM Open... ...
State Government of Vermont
Bid Due: 7/30/2026
...Follow S205--Waste Disposal and Recycle contract White River Junction Vermont Active Contract.../GARBAGE COLLECTION ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 7/30/2026
...and the Lamoille River. Work consists of streambank stabilization and associated restoration activities...
State Government of Vermont
Bid Due: 8/17/2026