| Location: | Vermont |
|---|---|
| Posted: | Apr 20, 2026 |
| Due: | May 15, 2026 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Lamoille Keywords: Insulation Contractor, Roofing Contractor Bid Description: Scope of Work includes two bid components: Work Scope 1: Full tear-off and replacement of existing roofing system, including new polyisocyanurate insulation (R-40), PVC membrane, edge metal, drain inserts, and accessories. Work Scope 2: Thermal improvements to attic-level exterior walls, including fluid-applied air barrier, mineral wool board and batt insulation, vapor retarder, and wood stud framing. Check out bid requirements here: https://www.morristownvt.gov/media/7116
|
||||||||||||||||||||

With GovernmentContracts, you can:
OCS_RFP_Feasibility_Study Request Date: 8/31/2026 2:32:30 PM Open Date: Closing Date: 10/12/2026 4:30 PM
State Government of Vermont
Bid Due: 10/12/2026
BID - TANDEM VIBRATORY ASPHALT ROLLER Request Date: 9/1/2026 11:35:35 AM Open Date:
State Government of Vermont
Bid Due: 9/25/2026
TITLE QUESTIONS DUE ANSWERS POSTED DUE DATE NO POSTING AFTER RFP 143 Mental
State of Vermont
Bid Due: 10/16/2026
Sunrise Drive Shoreline Bioengineering Project Request Date: 9/17/2026 10:13:53 AM Open Date: 9/17/2026
State Government of Vermont
Bid Due: 10/07/2026