| Location: | Vermont |
|---|---|
| Posted: | Apr 20, 2026 |
| Due: | May 12, 2026 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Lamoille Keywords: Construction (Non Building), Culvert Replacement, Stream Restoration Bid Description: The Vermont Natural Resources Council (VNRC) in collaboration with Smugglers’ Notch Resort (SNR) is requesting bids from qualified contractors for the removal of two (2) dams within the Brewster River Watershed on SNR property in Cambridge, VT. The Morses Mill Dam Removal project consists of the full removal of a 30-foot-wide timber crib dam on the Brewster River located between Rt. 108 and Desjardin Road. In addition, the adjacent floodplain will be re-graded and stabilized to provide floodplain access during storm events. The SNR Access Dam Removal project consists of the removal of a concrete weir outlet structure and associated three (3) 24-inch corrugated metal pipes (CMP) under the access road and the installation of a 12-foot wide by 8-foot tall concrete box culvert. In addition, the existing pond footprint shall be filled (average of 2-3 feet) and a stream channel and connected floodplain shall be restored. Bidders may choose to provide a bid on one or both dam removal projects. To request the construction drawings prepared by Fitzgerald Environmental Associates (FEA) reach out to Jordan Duffy at jordan@feavt.com.
|
||||||||||||||||||||||

With GovernmentContracts, you can:
...is defined by the Contract Documents and includes, but is not limited to, ...
State Government of Vermont
Bid Due: 6/10/2026