PROJECT MANUAL
FOR
2026 STREET RESURFACING
PROJECT NUMBER:
30-540010-2026
TOWN OF CARRBORO, NORTH CAROLINA
BID ADVERTISEMENT DATE: April 19, 2026
2024 NCDOT STANDARD SPECIFICATIONS
v.180329
Project #: 30-540010-2026
Project Name: Street Resurfacing 2026
Division 00 - Procurement &Contracting Requirements
TABLE OF CONTENTS
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMNTS
TABLE OF CONTENTS ........................................................................................................................................ 1
00 10 00 – INVITATION TO BID ....................................................................................................................... 1
00 20 00 – INSTRUCTIONS TO BIDDERS ....................................................................................................... 1
ARTICLE 1: DEFINITIONS............................................................................................................................................................1
ARTICLE 2: BIDDER’S REPRESENTATIONS.................................................................................................................................2
2.1 Contractor’s Licenses .................................................................................................................................................2
2.2 Bidder Qualifications..................................................................................................................................................2
2.3 Site Investigation and Conditions Affecting the Work .............................................................................................2
ARTICLE 3: BIDDING PROCEDURES...........................................................................................................................................2
3.1 The Project Manual ....................................................................................................................................................2
3.2 Addenda......................................................................................................................................................................2
3.3 Bid Form......................................................................................................................................................................2
3.4 Forms, Certifications, and Execution of Bid..............................................................................................................3
3.5 Bid Security .................................................................................................................................................................3
3.6 Sales and Use Tax .......................................................................................................................................................3
3.7 Submission of Bids .....................................................................................................................................................3
ARTICLE 4: BID AWARDS AND REJECTIONS..............................................................................................................................4
4.1 Bid Opening ................................................................................................................................................................4
4.2 Rejection of Bids and Disqualification of Bidders.....................................................................................................4
4.3 Award and Execution of Contract .............................................................................................................................4
ARTICLE 5: POST-AWARD ..........................................................................................................................................................4
5.1 Bonds and Insurance..................................................................................................................................................4
5.2 Pre-Construction Conference ....................................................................................................................................4
5.3 Notice to Proceed.......................................................................................................................................................4
ARTICLE 6: OUTREACH PLAN AND GUIDELINES FOR RECRUITMENT AND SELECTION OF MINORITY BUSINESSES....................5
6.1 Intent ...........................................................................................................................................................................5
6.2 Definitions....................................................................................................................................................................5
6.3 Participation Strategies................................................................................................................................................6
6.4 Designer .......................................................................................................................................................................6
6.5 Prime Contractor(s), CM at Risk and Their First-Tier Subcontractors ..........................................................................7
6.6 Minority Business Responsibilities...............................................................................................................................8
6.7 Minimum M/WBE Compliance Requirements.............................................................................................................8
6.8 Dispute Resolution Procedures....................................................................................................................................9
00 40 00 – BID FORMS AND SUPPLEMENTS ................................................................................................ 1
ITEMIZED BID .............................................................................................................................................................................1
EXECUTION OF BID ....................................................................................................................................................................2
M/WBE PARTICIPATION ON BASE BID ........................................................................................................................................3
M/WBE GOOD FAITH EFFORT QUESTIONNAIRE .........................................................................................................................4
00 60 00 – PROJECT FORMS .............................................................................................................................. 1
CONTRACTOR'S AFFIDAVIT RELEASE AND WAIVER OF CLAIM ................................................................................................1
STATE / COUNTY SALES / USE TAX STATEMENT......................................................................................................................2
INVITATION TO BID
00 10 00 - 1
Project #: 30-540010-2026
Project Name: Street Resurfacing 2026
Division 00 - Procurement &Contracting Requirements
00 70 00 – STANDARD SPECIAL PROVISIONS ............................................................................................. 1
ARTICLE 1: NCDOT STANDARD SPECIFICATIONS .....................................................................................................................1
1.1 NCDOT Standard Specifications ..................................................................................................................................1
ARTICLE 2: TOWN STANDARD PROVISIONS.............................................................................................................................3
2.1 Standard Service Contract ..........................................................................................................................................3
2.2 Existing Utilities...........................................................................................................................................................8
2.3 Sedimentation Pollution Control Act ..........................................................................................................................8
2.4 Construction Stakes, Lines, and Grades ......................................................................................................................9
2.5 Maintenance of the Project ........................................................................................................................................9
2.6 Storage of Materials and Equipment ..........................................................................................................................9
2.7 Subletting..................................................................................................................................................................10
2.8 Quantity Tickets ........................................................................................................................................................10
2.9 Periodic Payments ....................................................................................................................................................10
2.10Final Payment ...........................................................................................................................................................10
2.11Sales and Use Tax......................................................................................................................................................11
2.12 Allowances ................................................................................................................................................................12
2.13E-Verify .....................................................................................................................................................................12
2.14Iran Divestment Act ..................................................................................................................................................12
2.15 Indemnification.........................................................................................................................................................12
2.16 Guarantee .................................................................................................................................................................13
2.17Insurance Requirements ...........................................................................................................................................13
2.18Holiday Work Restrictions.........................................................................................................................................13
2.19Surface Water Quality Protection .............................................................................................................................14
00 75 00 – PROJECT SPECIAL PROVISIONS .................................................................................................. 1
ARTICLE 1: GENERAL REQUIREMENTS .....................................................................................................................................1
1.1 Contract Time ..............................................................................................................................................................1
1.2 Liquidated Damages.....................................................................................................................................................1
1.3 Work Time Restrictions ................................................................................................................................................1
1.4 Special Events...............................................................................................................................................................1
1.5 Locations of the Work ..................................................................................................................................................1
1.6 Price Adjustments – Asphalt Cement for PlantMix .....................................................................................................1
1.7 Bituminous Plant Mix Pavements - Recycled ...............................................................................................................1
1.8 Advance Warning Signs................................................................................................................................................2
1.9 Paving ..........................................................................................................................................................................2
1.10 Night Paving ...............................................................................................................................................................2
1.11 SUPERPAVE ................................................................................................................................................................2
1.12 Tack Coat....................................................................................................................................................................2
1.13 Asphalt Base Failure Repair........................................................................................................................................2
1.14 Milling ........................................................................................................................................................................3
1.15 On Street Parking .......................................................................................................................................................3
1.16 Adjustment of Structures...........................................................................................................................................3
1.17 Removal of Existing Pavement, Drives andWalks......................................................................................................3
1.18 Sawing Existing Pavement..........................................................................................................................................3
1.19 Pollution Prevention and SpillResponse....................................................................................................................4
1.20 Restoration ................................................................................................................................................................4
1.21 Street Markings..........................................................................................................................................................4
ARTICLE 2: SPECIAL PROVISIONS (SP).......................................................................................................................................5
SP-01. TRAFFIC CONTROL.................................................................................................................................................5
SP-02. MICROSURFACING ................................................................................................................................................7
SP-03. WHEELCHAIR RAMPS ..........................................................................................................................................10
SP-04. REMOVAL OF EXISTING PAVEMENT, DRIVES, SIDEWALKS AND CURB & GUTTER ..............................................11
SP-05. ALTERATIONS & ADDITIONS AS NEEDED – UNANTICIPATED WORK .............................................................11
INVITATION TO BID
00 10 00 - 2
Project #: 30-540010-2026
Project Name: Street Resurfacing 2026
Division 00 - Procurement &Contracting Requirements
ARTICLE 3: WATER AND SEWER SPECIAL PROVISIONS .........................................................................................................12
SP-06. MANHOLE, VALVE, AND METER BOX ADJUSTMENT ...........................................................................................12
ARTICLE 4: PROJECT DETAIL DRAWINGS ................................................................................................................................15
ARTICLE 5: LOCATIONS OF WORK...........................................................................................................................................32
ARTICLE 6: LIST OF LOCATIONS...............................................................................................................................................37
6.1 Surface Treatments ..................................................................................................................................................37
6.2 Patching .....................................................................................................................................................................38
6.3 Curb Ramps................................................................................................................................................................38
6.4 Pavement Markings ...................................................................................................................................................38
6.5 Incidentals..................................................................................................................................................................39
00 90 00 – ADDENDA ........................................................................................................................................... 1
INVITATION TO BID
00 10 00 - 3
00 10 00 – INVITATION TO BID
The Town of Carrboro (hereinafter the “Town”) will receive sealed bids for the following Project:
PROJECT NAME:
PROJECT NUMBER:
2026 Street Resurfacing
30-540010-2026
BID DUE DATE AND TIME:
BID OPENING LOCATION:
Monday, May 18 at 2:00 P.M.
Town of Carrboro
301 W. Main Street
Carrboro, NC 27510
DESCRIPTION OF WORK:
This project consists of milling and paving, microsurfacing, pavement marking
installation, curb ramp replacement, installation of new concrete sidewalk, curb, and
medians, and installation of plastic lane barriers. The foregoing description shall not be
construed as a complete description of all work required.
Bidders shall submit bids on a not to exceed basis and the contract shall be awarded on this basis.
Bidding documents may be obtained at: https://townofcarrboro.org/bids.aspx from the Town’s website. A printed
copy of one (1) Project Manual is available at the following address:
Public Works Department
100 N Greensboro St
Carrboro, NC 27510
Contact: Michael Johnson
Bidders must be properly licensed under North Carolina state law to perform the work. A 5% bid security or bid
bond is required with each bid.
Bidders must complete minority participation form or Good Faith Effort Questionnaire as detailed in Section 00 20
00 Article 6.
For information regarding this Invitation to Bid, contact:
Mike Johnson, Capital Projects Manager
Phone: (919) 918-7424
Email: mjohnson@carrboronc.gov
Website: https://townofcarrboro.org/967/Bid-Opportunities
Please submit questions or inquiries by May 11, 2025, at 3pm. Questions or inquiries past this deadline may not be
addressed by the Town prior to the Bid Due Date.
The Town of Carrboro reserves the right to reject any and all bids as it may deem to be in its best interest.
INVITATION TO BID
00 10 00 - 1
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.