| Location: | Mississippi |
|---|---|
| Posted: | Jun 26, 2025 |
| Due: | Jul 25, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA302225Q0314 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The Contractor must provide all, labor, material, equipment, and transportation required to replace a condenser pump circulating condenser water from the cooling towers supporting building 268 of Columbus AFB, MS. Perform all work according to the Statement of Work (SOW), the Project Image Document, and all related AF requirements and other codes and references.
Site Visit, RSVP, and Base Entry: The Government invites you to a site visit on, 9 July 2025 at 1:00 PM CST. Attendance is highly encouraged but not mandatory. Please note that registration is required by 9:00 PM CST on 7 July 2025. To register, please email the POC requesting a DoD Safe drop-off link to securely upload your completed Entry Authorization Listing (EAL) document (found in the list of SAM.gov attachments). If you do not contact the POC by 9:00 AM CST on 7 July 2025, you will not be able to attend the site visit.
Identification: All attendees must bring a valid photo ID.
Vehicle Requirements: If driving on base, please ensure the driver has driver's license, vehicle registration, and proof of insurance.
IMPORTANT: All contractors should arrive at Columbus AFB’s Visitors Center early and wait for a 14th Contracting Squadron representative to arrive and lead them to the site visit location. The representative will leave the visitors center at 1:00 pm.
Additional Info: All RFIs must be submitted NLT 1200 PM CST, on 15 July 2025.
| Jul 21, 2025 | [Solicitation (Updated)] Replace Cooling Tower Condenser Pump |
| Aug 11, 2025 | [Solicitation (Updated)] Replace Cooling Tower Condenser Pump |
| Sep 9, 2025 | [Award Notice (Original)] Replace Cooling Tower Condenser Pump |

With GovernmentContracts, you can: