Replace Bridge No. 800239 on SR 1325 over Cathey's Creek in Rutherford County - EDB Synopsis Rutherford No. 239

Location: North Carolina
Posted: May 15, 2026
Due: Aug 18, 2026
Agency: Division of Highways
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
  • Synopsis
  • Attachment Preview

    Synopsis
    Bridge Replacement Rutherford County
    Bridge No. 800239
    May 15, 2026
    General
    The project will replace an existing bridge (Structure No. 800239) on SR 1325 (Nanneytown
    Road) in Rutherford County with a bridge.
    The bridge is one hundred feet long.
    The bridge is located on the Subregional Tier, in such case, a general overview of the Roadway,
    Hydraulics, Geotechnical, and Structures Scope of Work is specified in the Subregional Tier
    Design Guidelines for Bridge Projects dated February 2008. An electronic copy of these
    documents is located at:
    https://connect.ncdot.gov/resources/Structures/Pages/Structure-Resources.aspx
    Planning
    The Department is currently preparing the environmental document for the bridge. The Design-
    Build Team will be responsible for providing impact quantities to complete this environmental
    document.
    Roadway
    Roadway plans will be the responsibility of the Design-Build Team. The pavement design will
    be provided by the Department.
    Hydraulics
    The Design-Build Team shall be responsible for all hydraulic designs and shall provide a signed
    and sealed Bridge Survey Report for the bridge replacement. The Design-Build Team shall be
    responsible for all storm drainage design, permit drawings and construction and shall obtain
    FEMA compliance for the regulated floodways.
    The Department will provide information prior to issuance of the Final Request for Proposals to
    establish the type and size of bridge to be bid.
    Permitting
    The Design-Build Team shall be responsible for preparing design plan sheets and providing all
    data necessary for the Department to obtain the environmental permit for the bridge replacement.
    This will often include a Nationwide Permit 3 or 14 and a Water Quality Certificate.

    Structures
    The Design-Build Team will be responsible for the design and construction of the structure
    necessary to complete the project. Standard bridge plans will be made available and may be
    used; however, the design must be signed and sealed by the Design-Build Team.
    Certain structure types will be disallowed or prescribed within the contract.
    Geotechnical
    The Department will provide 2 to 4 borings for this bridge to the Design-Build Teams. The
    Design-Build Team shall be responsible for all geotechnical recommendations, as well as any
    necessary supplemental borings, roadway and structural investigations.
    Traffic Management
    The bridge site is closed to traffic and operating with an off-site detour. The Design-Build Team
    will be responsible for Traffic Control Plans as appropriate for the bridge site as will be detailed
    in the Requests for Proposals.
    A list of parameters, such as lane closures, time restrictions and general guidelines will be
    provided in the Request for Proposals.
    Erosion and Sedimentation Control
    The Design-Build Team shall be responsible for all erosion control designs and implementation.
    Signing and Pavement Markings
    Pavement marking plans will be the responsibility of the Design-Build Team. Permanent signing
    on this project will be minimal and will be the responsibility of the Design-Build Team.
    Right-of-Way and Utilities
    In general, the Design-Build Team will be responsible for the acquisition of additional right of
    way, as necessary, to construct the project.
    The Design-Build Team will be responsible for the coordination of all utility relocations
    necessary for construction. It is anticipated that the cost of utility relocations will be paid by the
    utility owners or the Department.
    Surveys
    The Department will provide initial survey information pre-bid. The Design-Build Team shall
    be responsible for any supplemental location and construction surveys.
    Construction Engineering Inspection
    CEI on all contracts will be performed by the Department or its agent.

    Provided Materials
    The Department will provide surveys, including property ties, geotechnical borings, pavement
    designs, pre-design hydraulic reports, and environmental document or minimum criteria
    checklists, bridge inspection reports, and field scoping meeting minutes.
    Contract Completion Date
    As this is an Express Design-Build project without a Technical Proposal, an overall contract
    completion date will be set in the contract, with associated liquidated damages. The date will be
    established to allow for greater flexibility in the Design-Build Team scheduling and completion
    of the work.
    Intermediate contract times, with associated liquidated damages, will be as outlined in the
    Request for Proposals.
    Compensation
    To reduce the amount of work necessary to be performed pre-bid by the Design-Build Teams,
    and to ensure to the greatest extent possible that all Design-Build Teams are bidding on similar
    designs, the Department will include an estimated bridge length, bridge width, and assumed
    geotechnical design parameter (e.g., embedment, bearing elevation) in the Request for Proposals.
    The Design-Build Team will bid a unit price for these high level pay item quantities. However,
    the Department will allow the Design-Build Team to bid a lump sum for all work to enhance the
    opportunity for innovation in the procurement.
    It is likely that the bridge length, etc. will change from that estimated in the contract. In such
    event, a supplemental agreement will be entered into for the additional (or lesser) bridge length,
    foundation depth, etc. from those quantities placed in the Request for Proposals.
    A lump sum item will most likely be included to provide for all design work and other ancillary
    construction work including but not limited to minor approach work, approach slabs,
    supplemental investigations, drainage, erosion control, traffic control, etc.

    This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
    Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL

    See also

    Bid Title: Bid 4003-100726 Eastside Final Clarifier 4 Category: Bid Opportunities Status: Open

    City of High Point

    Bid Due: 10/07/2026

    Solicitation Number: 65-RFQ2026TCM CNDP Project Title: Development Partner for Carolina North development at

    State Government of North Carolina

    Bid Due: 10/16/2026

    Solicitation Number: Doc2338088290 Project Title: STC 4219A Durable Medical Equipment Description: Durable Medical

    State Government of North Carolina

    Bid Due: 10/05/2026

    Solicitation Number: Doc2334842570 Project Title: DMS Natural Infrastructure Flood Mitigation Project (NIFMP) Description:

    State Government of North Carolina

    Bid Due: 3/02/2027

    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.