BIG Ten Network Phase 2 - Broadcast Integrator (PREQUALIFICATIONS) RE-SOLICITATION

Location: California
Posted: Feb 5, 2026
Due: Feb 19, 2026
Agency: UCLA Capital Programs
Type of Government: State & Local
Category:
  • 59 - Electrical and Electronic Equipment Components
  • 70 - General Purpose Information Technology Equipment (including software).
Solicitation No: 942402.01
Publication URL: To access bid details, please log in.
Project Name BIG Ten Network Phase 2 - Broadcast Integrator (PREQUALIFICATIONS) RE-SOLICITATION
Project Number 942402.01
Project Description Subject to conditions prescribed by the University of California, Los Angeles, responses to the University's prequalification documents for a Lump Sum contract are sought from prospective prime contractor bidders (hereafter “bidders”) for the following project:

Furnish and install Broadcast Cabling and Equipment Systems at the three existing facilities. Each facility will consist of Junction Box (JBT’s) located at multiple camera positions and Television Reception Panels (TVRPs). Additional work includes confirming that the above work will be fully functional and compatible with the University-provided mobile broadcast studio units and a Press Box interface rack.

TO VIEW AND DOWNLOAD ALL FURTHER INFORMATION (PREQUALIFICATION DOCUMENTS; ADDENDA, IF ANY; PQ CONFERENCE SIGN-IN SHEET; ETC.), CLICK HERE: UCLA ONLINE PLANROOM
Estimated Construction Cost $2,979,000.00
Ad for Subs
908736.01

Attachment Preview

Big Ten Network Phase 2
University of California, Los Angeles
Project No. 942402.01
ADVERTISEMENT FOR PREQUALIFICATION
(Subcontractor-Broadcast Integrator)
RE-SOLICITATION
Subject to conditions prescribed by the University of California, Los Angeles, responses to the University's
prequalification documents for a Lump Sum contract are sought from prospective Broadcast Integrator
subcontractors (hereafter “subcontractors”) for the following project:
Big Ten Network Phase 2
Project Number 942402.01
UNIVERSITY OF CALIFORNIA, LOS ANGELES
PREQUALIFICATION OF PROSPECTIVE SUBCONTRACTORS: The University has determined that
Broadcast Integrator subcontractors who submit bids to prequalified prime contractors on this project must
be prequalified.
1.
Prequalification of Prime Contractors: Additionally, University has determined that Prime
Contractor bidders must also be prequalified, which shall occur under separate cover.
Prime Contractors who wish to self-perform Broadcast Integrator trade work shall be
required to submit subcontractor prequalification documents as specified in these
prequalification documents. University will post a list of prequalified prime contractors and
prequalified subcontractors on the University’s website. Only prequalified Broadcast
Integrator subcontractors will be approved by University for use in the below-designated
portion of the work.
Prequalified Broadcast Integrator subcontractors will be required to have one of the following
California contractor's licenses:
C-10 License (Electrical) or C-07 License (Low Voltage Systems)
DESCRIPTION OF WORK:
1.
Overall Description: The project will provide National Collegiate Athletic Association
(NCAA) sports facility broadcast improvements and upgrades at Mapes Beach (beach
volleyball), Spieker Aquatic Center (swimming and water polo), and John Wooden Center
(volleyball), and improvements to the campus fiber optic cabling infrastructure, as Phase 2
of the Big Ten Network. This project would support UCLA’s transition to the Big Ten
Conference and enable multiple simultaneous live broadcasts of UCLA athletic
competitions on the Big Ten Network’s B1G+ digital platform.
The project involves the installation of broadcast communication equipment and
infrastructure, including new camera stations (with both dedicated broadcast cameras and
replay cameras), television reception panels (TVRPs), input/output (I/O) panels,
waterproof enclosures or junction boxes (JBTs), and associated broadcast cabling and
electrical conduit at each venue. Project improvements would make use of existing
underground conduit networks as much as possible. New 100-amp and 200-amp
connections would be installed as needed for the camera stations and TVRPs, with
electrical power provided from existing electrical panels and/or substations at each
location.
All relevant athletic venues will connect to a centralized broadcast facility via a future
campus fiber optic network that will be run in existing underground campus IT conduit. This
project includes the installation of 300 linear feet of new underground conduit between
existing manholes off Charles E. Young Drive North, where there is insufficient existing
PQQ-SUB 170809
Prequalification Questionnaire (Subcontractor-Broadcast Integrator) - 1
Big Ten Network Phase 2
University of California, Los Angeles
Project No. 942402.01
pathway for the future campus fiber network.
Work may be sequenced and phased to maintain existing site occupants and facility
operations. Hazmat abatement will be required.
Estimated Construction Cost: $6,363,000
2.
Broadcast Integrator Description: Furnish and install Broadcast Cabling and Equipment
Systems at the three existing facilities. Each facility will consist of Junction Box (JBT’s)
located at multiple camera positions and Television Reception Panels (TVRPs). Additional
work includes confirming that the above work will be fully functional and compatible with the
University-provided mobile broadcast studio units and a Press Box interface rack.
Estimated Broadcast Integrator Construction Cost: $2,979,000.
PREQUALIFICATION SCHEDULE: On February 5, 2026, prequalification documents will be available to
intending subcontractors online at https://www.uclaplanroom.com and will be issued at no cost at:
Contracts Administration
University of California, Los Angeles
1060 Veteran Avenue, Suite 125
Box 951395
Los Angeles, California 90095-1395
310-825-7015
MANDATORY PREQUALIFICATION CONFERENCE: A Mandatory Prequalification Conference will be
conducted via ZOOM on February12, 2026 beginning promptly at 10:00 a.m. Only subcontractors who
participate in the Conference in its entirety will be allowed to submit prequalification documents and, if
prequalification is achieved, submit bids to prime contractors on the Project. Participants must arrive at or
before the above-specified time. Persons arriving later than said time will not be allowed to submit
prequalification documents or submit bids as prime contractors. For further information, contact University’s
Project Manager Lindsay Erickson at 310-206-7002.
NOTES:
1.
Attendee shall be a staff member of the subcontractor’s firm who will be actively
involved in responding to this Prequalification, and who is highly knowledgeable of
the firm’s potential response to the prequalification criteria.
Mandatory Pre-Bid Conference via ZOOM: Participants must log onto the ZOOM meeting at or
before 10:00 a.m. (See ZOOM meeting instruction below.) Persons logging in later than said time
will not be allowed to submit prequalification documents and, if prequalification is achieved, submit
bids to prime contractors on the Project.
Join Zoom Meeting:
Meeting ID:
https://ucla.zoom.us/j/92350803726
923 5080 3726
One tap mobile
+12133388477, 98670287466# US (Los Angeles)
+16692192599, 98670287466# US (San Jose)
Dial by your location
1 213 338 8477 US (Los Angeles)
1 669 219 2599 US (San Jose)
1 971 247 1195 US (Portland)
PQQ-SUB 170809
Prequalification Questionnaire (Subcontractor-Broadcast Integrator) - 2
Big Ten Network Phase 2
University of California, Los Angeles
Project No. 942402.01
1 253 215 8782 US (Tacoma)
1 346 248 7799 US (Houston)
1 602 753 0140 US (Phoenix)
1 720 928 9299 US (Denver)
1 301 715 8592 US (Washington DC)
1 312 626 6799 US (Chicago)
1 470 250 9358 US (Atlanta)
1 646 558 8656 US (New York)
1 651 372 8299 US (Minnesota)
1 786 635 1003 US (Miami)
Find your local number: https://ucla.zoom.us/u/adJIVaI7XH
SUBMITTAL DEADLINE: Each subcontractor’s completed Prequalification Questionnaire and
associated documents must be received at the above-listed University Contracts Administration
office in a sealed envelope, or uploaded to the UCLA Planroom website, no later than:
3:00 p.m., February 19, 2026
NOTE: Bidders who successfully prequalified during the prior solicitation and submitted
prequalification documents during the prior solicitation are not required to attend the
above-referenced Conference or submit any further documentation.
NOTE: Only hard copy submittals or submittals uploaded to the UCLA Planroom website will be
accepted. Oral, telephonic, electronic mail (e-mail), facsimile, or telegraphic Prequalification
Questionnaires are invalid and will not be accepted. Only University’s Prequalification
Questionnaire (and associated documents) will be accepted. University reserves the right (but is
not obligated) to request, receive, and evaluate supplemental information after the above time and
date at its sole determination.
Any person or entity not satisfied with the outcome of the prequalification must file a writ
challenging the outcome within 10 calendar days from the date of the University's written notice
regarding prequalification determination. Any assertion that the outcome of the prequalification
process was improper will not be a ground for a bid protest.
The dates, times, and location set for receiving and opening of bids will be set forth in an
Advertisement for Bids.
The University reserves the right to reject any or all responses to Prequalification Questionnaires and to
waive non-material irregularities in any response received.
All information submitted for prequalification evaluation will be considered official information acquired in
confidence, and the University will maintain its confidentiality to the extent permitted by law.
Every effort will be made to ensure that all persons have equal access to contracts and other business
opportunities with the University within the limits imposed by law or University policy. Each subcontractor
may be required to show evidence of its equal employment opportunity policy. Subcontractors will be
required to follow the nondiscrimination requirements set forth in the Bidding Documents and to pay
prevailing wage at the location of the work.
In addition, the University is committed to promoting and increasing participation of small business
enterprises (SBEs) and disabled veteran business enterprises (DVBEs) relating to all goods and services
covered under the awarded agreement, subject to any and all applicable obligations under state and federal
law, and University policies. The awarded contractor shall make best efforts to provide qualified SBEs and
DVBEs with the maximum opportunity to participate. Please email
ContractsAdministration@capnet.ucla.edu for further information.
PQQ-SUB 170809
Prequalification Questionnaire (Subcontractor-Broadcast Integrator) - 3
Big Ten Network Phase 2
University of California, Los Angeles
Project No. 942402.01
The work described in the contract is a public work subject to section 1771 of the California Labor Code.
No contractor or subcontractor, regardless of tier, may be listed on a Bid for, or engage in the performance
of, any portion of this project, unless registered with the Department of Industrial Relations pursuant to
Labor Code section 1725.5 and 1771.1.
This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
The successful Prequalified subcontractor shall pay all persons providing construction services and/or any
labor on site, including any University location, no less than the UC Fair Wage (defined as $15 per hour)
and shall comply with all applicable federal, state and local working condition requirements.
THE REGENTS OF THE UNIVERSITY OF CALIFORNIA
(Visit our website at: https://www.uclaplanroom.com)
PQQ-SUB 170809
Prequalification Questionnaire (Subcontractor-Broadcast Integrator) - 4
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Project ID: Title: 2026 Technology Cabling Project Addenda: 1 Release Date: 5/27/2026 Due ...

San Joaquin Delta College

Bid Due: 7/01/2026

...RFx Name: BPM013147 RFx Begin Date (UTC+0): RFQ - AS-NEEDED CABLING SERVICES AND ...

San Diego County

Bid Due: 6/11/2026

..., cabling, light poles, and firewater; and performing all associated work, all in ...

Port of Oakland

Bid Due: 6/22/2026

..., including required equipment, conduits/cabling, equipment supports, and site appurtenances, all...

City of Thousand Oaks

Bid Due: 6/10/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.