Maui Snail Enclosures

Location: Hawaii
Posted: Apr 20, 2026
Due: May 6, 2026
Agency: State Government of Hawaii
Type of Government: State & Local
Category:
  • 71 - Furniture
Solicitation No: B26002423
Publication URL: To access bid details, please log in.

General Information

  • Line Items
  • Instructions
  • B26002423 Maui Snail EnclosuresGeneral InformationSolicitation Number
    B26002423 version:
    01
    Status
    ReleasedDepartmentLand & Natural ResourcesDivisionForestry and WildlifeIslands (where the work/delivery is to be performed)
    MauiCategoryConstructionRelease Date 04/20/2026Amendment Date & Time04/20/2026 12:00 AMAmendment Reason
    pre-offer conference date is being changed to Friday May 1, 2026.Offer Due Date & Time05/06/2026 02:00 PMDescriptionThe Department of Land and Natural Resources Division of Forestry and Wildlife is seeking bids for an indefinite quantity contract to create predator proof snail enclosures on the Island of Maui. The successful bidder will enter into a contract for 24 months with the option extend where a Purchase Order will be used to award and execute each enclosure. Maui currently has 20 of these enclosures planned. Exact number of projects to be awarded is dependent on current and future funding.Contact PersonLandon, PeterEmail peter.landon@hawaii.gov Phone808-268-8699General CommentsProcurement OfficerDawn ChangAttachments IFB DOCUMENT-IFB Maui Exclosures Final.pdf
    AG-008 103D General Conditions (1.10.23).pdf

    Download All


    Direct all questions regarding this Solicitation, and any questions or Issues relating to the accessibility
    of this Solicitation (Including the appendices and exhibits to this Document, and any other document related
    to this Solicitation), to: Landon, Peter.

    B26002423 Maui Snail EnclosuresLine Items
    #
    Title
    Quantity
    Unit of Measure
    Commodity Code
    Code Table
    Commodity Code Description
    321999 Fencing, wood (except rough pickets, poles, and rails), manufacturing
    238990 Fencing contractors (except electronic containment fencing for pets)
    GeneralQuantity1Unit of MeasureEACHTitleSmall fence (250ft perimeter +/- 50ft)DescriptionSmall enclosure to spec approximately 250ft in perimeter +/- 50ftAttachments

    Print
    Code Table
    Commodity Code Description
    321999 Fencing, wood (except rough pickets, poles, and rails), manufacturing
    238990 Fencing contractors (except electronic containment fencing for pets)
    GeneralQuantity1Unit of MeasureEACHTitleMedium fence (350ft perimeter +/- 50ft)DescriptionA medium sized enclosure 350ft in perimeter +/- 50ft built to specAttachments

    Print
    Code Table
    Commodity Code Description
    238990 Fencing contractors (except electronic containment fencing for pets)
    GeneralQuantity1Unit of MeasureEACHTitleLarge fence (450ft perimeter +/-50ft)DescriptionLarge enclosure 450ft in perimeter +/-50ft built to spec.Attachments

    Print


    Direct all questions regarding this Solicitation, and any questions or Issues relating to the accessibility
    of this Solicitation (Including the appendices and exhibits to this Document, and any other document related
    to this Solicitation), to: Landon, Peter.

    B26002423 Maui Snail EnclosuresInstructions
    • VENDOR NON-COMPLIANCE : NON-COMPLIANCE may result in a vendor not receiving an award, delay of payment, or cancellation of award. If the vendor does not maintain timely compliance, which is the vendor’s responsibility, an offer otherwise deemed responsive and responsible may not be awarded. State agencies may check for compliance at any time.
    • HAWAII GENERAL EXCISE TAX (GET): Unless otherwise stated in this solicitation, vendors shall include all applicable taxes in the price submitted. The Hawaii General Excise Tax (GET) shall not exceed 4.712% for the islands of Oahu, Kauai , Hawaii, and Maui.
    • ADDITIONAL FEES AND CHARGES: Vendors shall include all applicable fees, charges, surcharges, shipping/handling, delivery, or any other charges associated with this solicitation in the price submitted.
    • VENDOR COMPLIANCE – PAPER DOCUMENTS : Vendors not utilizing HCE shall provide paper certificates that must be valid at the time of award. All applications for applicable clearances are the responsibility of the vendor, who must be compliant pursuant to HRS§103D-310(c) with the chapters 1) Chapter 237, General Excise Tax Laws; 2) Chapter 382, Hawaii Employment Security Law; 3)Chapter 386, Worker’s Compensation Law; 4) Chapter 392, Temporary Disability Insurance; 5)Chapter 393, Prepaid Health Care Act; and 6) §103D-310(c), Certificate of Good Standing (COGS) for entities doing business in the State. Upon receipt of compliance paper documents (A-6, LIR#27, COGS), the purchasing agency reserves the right to verify their validity with the respective issuing agency.
    • RESPONSE TO THIS SOLICITATION: Only responses submitted through HIePRO shall be considered for award.
    • QUESTIONS ABOUT THIS SOLICITATION: Unless otherwise indicated, questions regarding this solicitation must be directed to the Buyer listed.
    • TRANSACTION FEES: The awarded vendor shall pay a transaction fee of 0.75% (.0075) of the award, not to exceed $5,000 for each award. This transaction fee shall be based on the original award amount and the awarded vendor shall be responsible for payment of the fee to Tyler Hawaii, the vendor administering the HIePRO. Payment must be made to Tyler Hawaii within thirty (30) days of receipt of invoice. The invoice is generated based on the date the award is posted.
    • OFFER DEEMED FIRM/AUTHORITY TO SUBMIT OFFER: Submission of an electronic response to the State of Hawaii constitutes and shall be deemed an offer to sell the specified goods and/or services to the State of Hawaii at the price shown in the response and under the State's Terms and Conditions.

      The electronic response submitter certifies that he/she is authorized to sign the response for the submitting vendor and that the response is made without connection with any person, firm, or corporation making a response for the same goods and/or services and is in all respects fair and without collusion or fraud.
    • COMPLIANCE AND DOCUMENTATION: Vendors are required to be compliant with all appropriate state and federal statutes. Proof of compliance is required through HCE or via paper documentation.
    • VENDOR REGISTRATION IN HAWAII COMPLIANCE EXPRESS (HCE) : Vendors can register at https://vendors.ehawaii.gov/hce via an annual subscription fee and should subscribe prior to responding to a solicitation. For more information visit the HCE Section of the FAQs at http://spo.hawaii.gov/faqs/#tabs-4.

    Attachment Preview

    DOFAW requests bids for an indefinite quantity contract to construct fence units of three distinct
    sizes, small (250 ft. in perimeter 50 ft.), medium (350 ft. in perimeter 50 ft.), and large (450
    ft. in perimeter 50 ft). DOFAW will identify a proposed site, provide approximate perimeter size
    estimates (small, medium, or large), delineate the proposed fenceline with flagging, and will take
    the contractor to the site, prior to cutting a PO for a unit.

    I. Summary of Work:
    Hawaiian terrestrial snails are quickly going extinct due to depredation by introduced predators
    including rats, Jackson's chameleons, and the rosy wolf snail. Currently, the only reliable way to
    protect populations in the field is to construct predator exclusion fences. This project includes
    constructing small fence units at remote sites across the island of Maui.
    Each fence unit will be between 200 - 500 feet in circumference and will be made entirely of
    plastic lumber with HDPE geomembrane as the siding. The basic design of the fence includes a
    solid wall with a hood to exclude rats. Three rosy wolf snail barriers will be attached to the
    exterior of the wall consisting of two flared 15 degrees angled flanges and an array of copper bands, to
    be electrified by DOFAW after completion of fence construction.
    DOFAW will supply some of the material needed to complete fence units. The contractor will be
    responsible for fence construction, transport of fence crew and equipment, the transport of
    fencing materials from their current location to installation sites, and the provision of additional
    materials needed to construct the fence as specified herein.
    DOFAW requests bids for an indefinite quantity contract to construct fence units of three distinct
    sizes, small (250 ft. in perimeter 50 ft.), medium (350 ft. in perimeter 50 ft.), and large (450
    ft. in perimeter 50 ft). DOFAW will identify a proposed site, provide approximate perimeter size
    estimates (small, medium, or large), delineate the proposed fenceline with flagging, and will take
    the contractor to the site, prior to cutting a PO for a unit. Commented [SDR1]: Added language here regarding
    three specific fence sizes. See what you think.
    II. General Description of Project Sites:
    All sites will be in remote areas in State Forest Reserves, State Natural Area Reserves, or
    Private land zoned for conservation, on the island of Maui.
    III. Access to Installation Sites:
    Access to all project sites will be via helicopter. DOFAW will identify possible staging areas,
    drop zones, and landing zones for each site prior to construction of a unit. Contractor is required
    to conduct all proper due diligence to secure flights and land access.
    The Contractor shall be responsible for transporting its work crew, equipment and materials to
    the project sites. DOFAW will not provide any ground or helicopter transport.
    IV. Equipment, Supplies, Transportation, and Labor:
    All equipment, supplies, tools, transportation and labor will be provided by the Contractor, with
    exception to any materials specified by DOFAW (see below, Section VI.).
    The Contractor is advised that DOFAW shall not supply communications equipment or personal
    protective equipment (PPE).
    1

    Reinforced plastic lumber boards 2"x8"x16' (top board)
    Reinforced plastic lumber boards 2"x6"x16' (barrier board)
    Non-reinforced plastic lumber boards 2"x12"x16' (baseboard)

    The materials listed below in Section VI have already been purchased and are available for use.
    The materials are currently located in a DOFAW base-yard and will be transported by the
    Contractor to the build site(s). The Contractor may not use any DLNR base-yard as an office or
    staging area; for storage of tools, supplies, equipment, or other materials; or for overnight
    vehicle parking.
    V. Site Preparation:
    DOFAW has conducted surveys for rare/endangered plants and historic features. Any areas of
    special concern will be conspicuously flagged, and will be identified during site visits, and must
    not be disturbed or damaged.
    The proposed fence lines will be marked and cleared of some trees and vegetation; however,
    the lines will require additional vegetation clearing, and some groundwork to accommodate tree-
    stumps and rocks. Removal of plants along the fence corridor should only include those plants
    that may hinder fence construction. The Contractor may be asked to remove tree limbs that may
    fall on the fence line even after the fence corridor has been brushed and the fence installed.
    Note that it is not necessary to remove all vegetation.
    Project sites are in forests that may have dense fern and shrub understory; brushing will be
    required. Any clearing will be done by hand or with small power tools only. The Contractor may
    clear a corridor no more than eight feet (8') ft. in width. Debris must be scattered away from the
    fence so as not to impede foot traffic along the fence line or interfere with installation of fencing.
    No standing trees greater than 4" DBH shall be cut without consultation with DOFAW project
    coordinator.
    The proposed fence lines will be marked with blue trail flagging. It is recognized that for
    installation purposes the contractor may choose to shift the flagged alignment slightly (less than
    10ft.). Any adjustments to the fence line will need approval from the project coordinator prior to
    moving the line. Upon approval, the Contractor may re-align the fence to straighten alignments,
    adjust corners, or to avoid certain trees and shrubs.
    There are no known archaeological or historical sites within the fencing corridor(s) however, if
    the Contractor finds bones or cultural artifacts at any time during site preparation or installation,
    work must immediately cease and DOFAW must be notified immediately. All human litter and
    waste must be removed from the site at all stages of fence construction.
    VI. Fence Materials:
    Materials provided by DOFAW:
    1. Reinforced plastic lumber boards 2"x8"x16' (top board)
    2. Reinforced plastic lumber boards 2"x6"x16' (barrier board)
    3. Non-reinforced plastic lumber boards 2"x12"x16' (baseboard)
    2

    Reinforced plastic lumber post 4"x4"x8' (post)
    HDPE 7'x24' 100 mil rolls
    Non-reinforced plastic lumber boards 2"x4"x10' (blocking)
    Copper bands, (electrical barrier)
    Stainless steel screws for copper band installation
    Rat hood
    The contractor will receive an inventory of all materials supplied by DOFAW including where
    they are stored. The Contractor will be responsible for supplying all materials needed to meet
    the specifications of this project except for what is listed above.

    4. Reinforced plastic lumber post 4"x4"x8' (post)
    5. HDPE 7'x24' 100 mil rolls
    7. Non-reinforced plastic lumber boards 2"x4"x10' (blocking)
    8. Copper bands, (electrical barrier)
    9. Stainless steel screws for copper band installation
    10. Rat hood
    11. Angle barrier
    The contractor will receive an inventory of all materials supplied by DOFAW including where
    they are stored. The Contractor will be responsible for supplying all materials needed to meet
    the specifications of this project except for what is listed above.
    Please note, it is crucial all materials must be free of any foreign organisms: arthropod pests
    (ants, spiders etc.) and their egg clutches, mollusks (snails & slugs) and their egg clutches,
    weeds, seeds, and dirt.
    The following materials are not provided by DOFAW and must be provided by Contractor.
    Materials include but are not limited to the following as specified herein:
    1. Georunner system including all materials not specified above
    2. Geotextile fabric
    3. All materials to build the fence crossover and Covered Area (other than what is supplied
    above)
    4. All construction materials not listed including fasteners, nylon washers, washed gravel
    and concrete, etc. All fasteners must be stainless steel or dipped galvanized. Zinc
    plated fasteners will NOT be accepted.
    All materials must be approved by the DOFAW project coordinator or their designated appointee
    before installation.
    VIII. Fence Construction
    General
    The proposed fences are designed to protect rare and endangered snails from introduced
    predators, including the rosy wolf snail (Euglandina species), Jackson's Chameleons
    (Trioceros jacksonii xantholophus), and three species of rats (Rattus rattus, Rattus
    norvegicus, and Rattus exulans). Because these predators are small exclusion is difficult. It
    is therefore imperative that there be no discrepancies in the fence or the predator barriers
    that would allow for incursion.
    Basic Fence description:
    The backbone of the fence is a plastic lumber structure of 4"x4" reinforced plastic lumber
    posts cemented into the ground with two 2"x6" and one 2"x12" reinforced plastic lumber
    boards running parallel to the ground. Fixed on this backbone is HDPE sheeting. Mounted
    on the sheeting are two types of exclusion barriers to the Rosy Wolf Snails: two angle
    3

    barriers and an electric barrier. At the top of the HDPE wall is an 8" diameter rolled hood
    that excludes rats. At the bottom edge of the fence the HDPE extends past the bottom edge
    of the 2"x12" base board. Along the outside edge of the fence a Georunner erosion control
    system installed to prevent erosion. See Figure 4. Each of these components is described
    in depth in the sections below.
    4

    Figure 4. Predator-proof fence detail.
    Posts:
    Posts are 8-foot-tall 4"x4" reinforced plastic lumber placed a maximum of 8' apart on center.
    Posts must be a minimum of 60" above ground and 24" underground. They must be
    trimmed to conform to rat hood height within 6". (Posts must not be more than 6" taller than
    the wall.) All posts must be installed perpendicular to the ground to ensure conformity with
    the HDPE sheeting. Post footings must be a minimum of 24" deep and 18" in diameter with
    the post concreted in the center. There must be a minimum depth of 18" of concrete
    securing the posts. There must be a minimum 6" soil layer between the concrete and
    ground level. This allows for the installation of the 2"x12" baseboard.
    2"x12" interior and 2"x6" exterior Baseboards:
    A 2"x12" reinforced plastic lumber interior baseboard will be installed a minimum 5" below
    ground level on the inside of the HDPE, parallel to the ground slope. The 2"x12" interior
    baseboard will be secured to the posts with at least two 3/8"x6" galvanized (all fasteners
    must be dipped galvanized and not zinc plated) carriage bolts per post and within 0.5"-1.5"
    of the outside edge of the board. Bolts must be secured with nuts and washers on the
    inside of the fence. The top of the concrete post footing must be at or within 2 inches of the
    bottom of the board.
    A 2"x6" reinforced exterior baseboard will be installed on the outside of the HDPE. This
    exterior baseboard sandwiches the HDPE and excluder mesh to the interior baseboard and
    ensures there are no gaps between the HDPE, excluder mesh, and the 2"x12" baseboard.
    The 2"x6" must be fastened to the 2"x12" baseboard with 3/8"x4" galvanized carriage bolts
    every 18". The top of the excluder mesh and the two baseboards must be parallel and even.
    2"x6" Barrier Board:
    A reinforced 2"x6" plastic lumber board will be installed a minimum of 20" from the top of the
    2"x12" and 2"x6" baseboards (measured to the bottom of the barrier board). This board will
    be used for mounting the lower angle barrier. It will parallel the ground slope and 2"x12"
    baseboard. The 2"x6" will be secured to the posts with at least two 3/8"x6" galvanized
    carriage bolts within 0.5"-1.5" of the outside edge of the board. Bolts must be secured with
    nuts and washers on the inside of the fence.
    2"x6" Top Board:
    A reinforced 2"x6" plastic lumber board will be installed a minimum 39" from the top of the
    top board to the top of the lower angle or 55" on center off the finished Georunner system.
    5

    The top board should parallel the ground slope, 2"x12" baseboard, and the 2"x6" barrier
    board. The 2"x6" will be secured to the posts with at least two 3/8"x6" galvanized carriage
    bolts within 0.5"-1.5" of the outside edge of the board. Bolts must be secured with nuts and
    washers on the inside of the fence.
    Blocking:
    Reinforced plastic lumber 2"x4" blocking will be installed on all posts between the baseboard
    and barrier board (approximately 10") as well as the barrier board and top board
    (approximately 33") to fill in the gap between the wall and post. The 2"x4" will be secured to
    the posts with at least three 5" galvanized lag bolts within 5" of the center of the board. Lag
    heads must be counter sunk, and not stand out beyond the edge of the post.
    Hood:
    A rolled or rounded hood a minimum of 8" in diameter will be installed at the top edge of the
    fence a minimum of 42" from the top of the lower angle barrier. The hood can be
    constructed of HDPE, PVC, or galvanized 18-gauge sheet metal and must be painted (dark
    green or brown, non-glossy). Self-etching paint must be used if the hood is painted by the
    contractor after it is zinc plated. The joints must be welded or glued such that there are no
    irregularities that would allow for rats to gain a foothold. The hood must be fastened with
    stainless steel fasteners (#10 screws with 0.5" OD washers) a maximum of 8" apart. The
    hood must be secured between the inner side of the HDPE membrane and 2"x6" top board.
    See Figure 5 for the proper order of installation.
    Board joints:
    All 2"x6" and 2"x12" boards must have flush butt joints within 1" of the post center. There
    must be no gaps larger than 1/4" between board ends. Galvanized carriage bolts must be
    within 0.5"-1.5" of the outside edges of the boards. All galvanized carriage bolts must be 3/8"
    in diameter.
    HDPE geomembrane and excluder mesh skirt:
    The HDPE membrane must be flush with or extend above the top edge of the top board.
    The HDPE membrane must be installed so that it sandwiches the base of the rat hood with
    the top board, this is to divert rainwater away from the electric barrier that should be
    installed just below. The HDPE should be screwed to the top board with #10 stainless steel
    screws every 12". See Figure 5.
    Moving down the wall, the 2" x 12" reinforced plastic lumber will be used to secure the lower
    angle and HDPE to the 2"x 6" barrier board. The reinforced plastic lumber must be secured
    every 12" with #8x1-5/8" star pan head stainless steel composite deck screws countersunk
    0.25". All reinforced plastic lumber joins and corners must be flush and there must be no
    gaps between the HDPE and wall. See Figure 5.
    6

    The vertical membrane joins on posts must overlap for at least 4". All joins along posts must
    be battened the full length between the hood and the lower angle, and the lower angle and
    2"X6" baseboard. HDPE ends must be flush with the end of the battens. All joins must be
    sealed with 100% silicone sealant prior to securing. Battens must either be plastic,
    galvanized, or aluminum and must be beveled at the edges to prevent Jackson's
    Chameleons from climbing. Battens must be pre-approved by project coordinator David
    Sischo. All battens must be secured with #10 1" stainless steel screws. Fasteners must be
    no greater than 4" apart along the posts and must be within 0.5"-1.5" from the edge of the
    blocking board.
    Along the 2"X12" baseboard the HDPE and excluder mesh will be sandwiched by the 2"X6"
    baseboard. The excluder mesh must also run horizontal on the ground from the 2"x12" and
    2"x6" baseboards for a minimum of 12" under the geotextile. At fence corners and excluder
    mesh joins, excluder mesh patches may need to be added to ensure coverage between the
    ends. All patches must overlap at least 6" and must be secured with stainless hog rings no
    more than 2" apart.
    The HDPE membrane should extend and be buried a minimum of 6" from the base of the
    2"x12" baseboard into the ground. This is also to prevent rat incursions.
    Excluder Mesh:
    Excluder mesh will be installed along the outside edge of the fence to rodent incursions.
    Process of installation is as follows. Soil within 48" of the fence must be cleared of all
    vegetation, excavated approximately 3", leveled and compacted. The inside edge of the
    Excluder Mesh is then installed vertically behind the 2"x6" exterior base board. The inside
    edge must be level with the top edge of the exterior 2"x6" base board. The Excluder mesh
    must extend down between the 2"x6" base board and the HDPE wall, transitioning from the
    vertical to a horizontal orientation extending a minimum of 48" from wall edge. The mesh
    must be secured by installing the Georunner Erosion Control System atop. The outside
    edge must be a minimum of 48" from the baseboard.
    Georunner Erosion Control System:
    Georunner will be installed along the outside edge of the fence to prevent erosion. Process
    of installation is as follows. Soil within 48" of the fence must be cleared of all vegetation,
    excavated approximately 3", leveled and compacted. Heavy weight (Mirafi 180N,
    Nonwoven) geotextile fabric is then installed from the 2"x12" baseboard to a minimum of 48"
    from wall edge. The fabric must be secured with 18" geotextile pins with washers. Cut edges
    must be folded under and pinned. Next, the Georunner is installed per manufacturing
    instructions. The inside edge must be flush to the baseboard. The outside edge must be a
    minimum of 48" from the baseboard (two 24" pavers). The pavers should be arranged in a
    running, offset pattern so that the joins are not stacked.
    7

    This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
    Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL

    See also

    Bin # Contract Number Construction Projects Bid Opening 1 767302 Airport and City

    Honolulu County

    Bid Due: 12/31/2029

    Bin # Contract Number Construction Projects Bid Opening 1 812002 Rehabilitation of Localized

    Honolulu County

    Bid Due: 12/31/2099

    Bin # Contract Number Construction Projects Bid Opening 1 919705 Rehabilitation of Localized

    Honolulu County

    Bid Due: 12/31/2029

    Solicitation #: B27000058 Title: UPS Batteries Replacement at IT Center and Keller Hall

    State Government of Hawaii

    Bid Due: 8/10/2026

    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.