City of Kirksville, construction of approximately 1,090 linear feet of HDPE storm sewer, 93 linear feet of PVC gravity sewer main, 1,195 linear feet of new curb and gutter, and 1,593 feet of new 5’ wide, ADA compliant sidewalk from the Forest Lake Area Trailhead

Location: Missouri
Posted: Dec 17, 2025
Due: Jan 22, 2026
Agency: Missouri Department of Transportation(MDOT)
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Status Bid Advertisement Post Date Revision Date Letting Date
NEW City of Kirksville, construction of approximately 1,090 linear feet of HDPE storm sewer, 93 linear feet of PVC gravity sewer main, 1,195 linear feet of new curb and gutter, and 1,593 feet of new 5’ wide, ADA compliant sidewalk from the Forest Lake Area Trailhead 12/17/25 1/22/26

Attachment Preview

ADVERTISEMENT
NOTICE TO CONTRACTORS
TAP 3700(214)
Sealed bids, addressed to “CITY OF KIRKSVILLE" and endorsed "PROPOSAL FOR CONSTRUCTING
FLATS TRAILHEAD CONNECTOR TAP 3700(214)” in City of Kirksville, will be received by the City Clerk
until 3:00 p.m. (prevailing local time) on January 22, 2026 at the office of the City Clerk, and at that time bids will be
publicly opened and read. Bids should be delivered to: City Clerk’s Office, 201 S. Franklin Street, Kirksville, MO
63501.
The proposed work includes the construction of approximately 1,090 linear feet of HDPE storm sewer, 93 linear feet
of PVC gravity sewer main, 1,195 linear feet of new curb and gutter, and 1,593 feet of new 5’ wide, ADA compliant
sidewalk from the Forest Lake Area Trailhead, across Osteopathy Ave, and along Washington St. to downtown
Kirksville.
Special Needs: If you have special needs addressed by the Americans with Disabilities Act, please notify the City
Clerk at 660-627-1225 at least 5 working days prior to the bid opening you plan to attend.
The wage rates applicable to this project have been predetermined as required by law and are set forth in the bid
proposal. When Federal wage rates are applicable and included, this contract is subject to the "Work Hours Act of
1962" (P.L. 87-581; Stat. 357) and implementing regulations.
Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and
minimum wage rates to be paid under the contract, Section 3, Segregated Facility, Section 109, and E.O. 11246
City of Kirksville hereby notifies all bidders that it will affirmatively ensure that in any contract entered into
pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged
individuals will be afforded full opportunity to submit bids in response to this invitation and will not be
discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in
consideration for an award.
All bidders must be on MoDOT’s Qualified Contractor List per Section 102.2 of the 2025 Missouri Standard
Specifications for Highway Construction – 3rd Edition, January 2026 including all revisions. The contractor
questionnaire must be on file 7 days prior to bid opening. No bidder may withdraw his bid within 90 days after the
actual date of the opening thereof.
Contractors and subcontractors who sign a contract to work on public works projects must provide a 10-hour OSHA
construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to
be completed by their on-site employees within sixty (60) days of beginning work on the construction project.
Plans and specifications are on file at the office of the Consulting Engineer, HOWE COMPANY, LLC., 804 E.
PATTON ST., MACON, MO. Complete instructions to bidders and proposal blanks may be obtained at the
Engineers Office for a nonrefundable fee of $50.00. The plans and specifications will be mailed upon payment of
$25.00 for shipping and handling, for a total of $75.00 for each set. The shipping and handling charges will be
waived if the prospective bidder contacts the Engineer with a valid account number for shipping services with
United Parcel Service (UPS), so the shipping cost is billed to the bidder. Hard copies of the bid documents can be
ordered by calling 660-395-4693. A PDF version of the bid documents may be obtained from
www.howecompany.com for a nonrefundable fee of $50.00 paid through PAYPAL. Bidders must obtain their bid
documents from either Howe Company, LLC, or www.howecompany.com and be plan holders in order to bid the
project. All proposals must be on the forms provided in the bid documents.
The right is reserved to reject any or all bids. A certified or cashier’s check or a bid bond in the amount of 5% shall
be submitted with each proposal. The DBE goal for this project is 0%.
No 2nd tier subcontracting will be allowed on this project.
The Contract, if awarded, will be awarded to the lowest responsive, responsible bidder who provides the lowest
price complying with the Conditions of the Contract Documents within the Owner's budget.
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...bike lane, access connections, storm sewers, curb and gutter, street lighting, asphalt widening... ...

Missouri Department of Transportation(MDOT)

Bid Due: 6/23/2026

...lighting, storm sewer, curb and gutter, and waterline replacement and tree planting. Primary ...

Lee's Summit city

Bid Due: 6/10/2026

...the roadway, New inlets and storm sewer connecting an adjacent drainage project and ...

Missouri Department of Transportation(MDOT)

Bid Due: 6/12/2026

...2 rock blanket, storm sewer structures and piping, rip-rap slope protection, construction...

Missouri Department of Transportation(MDOT)

Bid Due: 6/11/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.