| Location: | Pennsylvania |
|---|---|
| Posted: | May 15, 2026 |
| Due: | Jun 9, 2026 |
| Agency: | Housing Authority of the City of Pittsburgh |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB#600-08-26 |
| Publication URL: | To access bid details, please log in. |
IFB#600-08-26
OPEN
HACP is issuing this Invitation for Bids (“IFB”) for qualified and interested business firms to submit sealed bids to provide Murray Tower Comprehensive Rehabilitation Project, AMP-31.
Issue Date:
May 4, 2026 08:00 amMeeting Date:
May 27, 2026 10:00 amDeadline Date:
Jun 9, 2026 10:00 am
May 4, 2026
May 4, 2026
May 4, 2026
May 4, 2026
SECTION000102
PROJECTINFORMATION
PART1 GENERAL
1.01 PROJECTIDENTIFICATION
A. ProjectName: HACPMurrayTowers,locatedat2 825MurrayAve,Pittsburgh,PA15217.
B. Architect'sProject#:2338:
C. Owner'sProjectNumber:#04-AMP-31,ManagementNo.7954BPO3827.
2825MurrayAve.
Pittsburgh,Pennsylvania15217.
D. TheOwner,hereinafterreferredtoasHACP
1.02 NOTICETOPROSPECTIVEBIDDERS
A. ThesedocumentsconstituteaNoticeofIntenttoRequestProposalsandaRequestfor
QualificationsfromprospectiveDesign-Buildersforthedesignandconstructionoftheproject
describedbelow.
PART2 PRODUCTS-NOTUSED
PART3 EXECUTION-NOTUSED
ENDOFSECTION
MurrayTowersRehab 000102-2 ProjectInformation
SECTION000107
SEALSPAGE
DESIGNPROFESSIONALSOFRECORD
A.ARCHITECT:
1.FUKUIARCHITECTS
2.RA404265
3.RESPONSIBLEFORDIVISON01-49SECTIONSEXCEPTWHEREINDICATEDAS
PREPAREDBYOTHERDESIGNPROFESSIONALSOFRECORD.
B.STRUCTURALENGINEER:
1.PROVIDENCEENGINEERING.
2.PE085703.
3.RESPONSIBLEFOR033000,042200,051200,061753
B.FIRE-PROTECTIONENGINEER:
1.IAMSCONSULTING
2.PE085703
3.RESPONSIBLEFORDIVISION21
C.PLUMBINGENGINEER:
1.IAMSCONSULTING
2.054899-E
3.RESPONSIBLEFORDIVISION22
D.HVACENGINEER:
1.IAMSCONSULTING
2.054899-E
3.RESPONSIBLEFORDIVISION23
E.ELECTRICALENGINEER
1.IAMSCONSULTING
2.054899-E
3.RESPONSIBLEFORDIVISION26-28
ENDOFSECTION
MurrayTowersRehab 000107-3 SealsPage
SECTION000110
TABLEOFCONTENTS
PROCUREMENTANDCONTRACTINGREQUIREMENTS
1.01 DIVISION00--PROCUREMENTANDCONTRACTINGREQUIREMENTS
A. 000101-ProjectTitlePage
B. 000102-ProjectInformation
C. 000107-SealsPage
D. 000115-ListofDrawingSheets
SPECIFICATIONS
2.01 DIVISION01--GENERALREQUIREMENTS
A. 011000-Summary
B. 012000-PriceandPaymentProcedures
C. 012500-SubstitutionProcedures
D. 013000-AdministrativeRequirements
E. 013216-ConstructionProgressSchedule
F. 015000-TemporaryFacilitiesandControls
G. 015100-TemporaryUtilities
H. 015713-TemporaryErosionandSedimentControl
I. 016000-ProductRequirements
J. 017000-ExecutionandCloseoutRequirements
K. 017419-ConstructionWasteManagementandDisposal
L. 017800-CloseoutSubmittals
M. 017900-DemonstrationandTraining
2.02 DIVISION02--EXISTINGCONDITIONS
A. 024100-Demolition
B. 028000 # -AsbestosAbatement
2.03 DIVISION03--CONCRETE
A. 030100-MaintenanceofConcrete
B. 031000-ConcreteFormingandAccessories
C. 032000-ConcreteReinforcing
D. 033000-Cast-in-PlaceConcrete
2.04 DIVISION04--MASONRY
A. 040100-MaintenanceofMasonry
2.05 DIVISION05--METALS
A. 054000-Cold-FormedMetalFraming
B. 055213-PipeandTubeRailings
2.06 DIVISION06--WOOD,PLASTICS,ANDCOMPOSITES
A. 061053-MiscellaneousRoughCarpentry
2.07 DIVISION07--THERMALANDMOISTUREPROTECTION
A. 072100-ThermalInsulation
B. 075400-ThermoplasticMembraneRoofing
MurrayTowersRehab 000110-4 TableofContents
C. 076200-SheetMetalFlashingandTrim
D. 078400-Firestopping
E. 079200-JointSealants
2.08 DIVISION08--OPENINGS
A. 081113-HollowMetalDoorsandFrames
B. 081416-FlushWoodDoors
C. 083100-AccessDoorsandPanels
D. 084126-All-GlassEntrancesandStorefronts
E. 084229-AutomaticEntrances
F. 087100-DoorHardware
2.09 DIVISION09--FINISHES
A. 090561-CommonWorkResultsforFlooringPreparation
B. 092116-GypsumBoardAssemblies
C. 093000-Tiling
D. 095100-AcousticalCeilings
E. 096500-ResilientFlooring
F. 099123-InteriorPainting
2.10 DIVISION10--SPECIALTIES
A. 101419-DimensionalLetterSignage
B. 102600-WallandDoorProtection
C. 102800-Toilet,Bath,andLaundryAccessories
D. 102819-TubandShowerEnclosures
E. 104300-EmergencyAidSpecialties
F. 104400-FireProtectionSpecialties
G. 105613-MetalStorageShelving
H. 108213-ExteriorGrillesandScreens
2.11 DIVISION11--EQUIPMENT
2.12 DIVISION12--FURNISHINGS
A. 122113-HorizontalLouverBlinds
B. 123530-ResidentialCasework
C. 123600-Countertops
2.13 DIVISION13--SPECIALCONSTRUCTION
2.14 DIVISION14--CONVEYINGEQUIPMENT
2.15 DIVISION21--FIRESUPPRESSION
A. 210500-CommonWorkResultsforFireSuppression
B. 211300-Fire-SuppressionSprinklerSystems
2.16 DIVISION22--PLUMBING
A. 220517-SleevesandSleeveSealsforPlumbingPiping
B. 220719-PlumbingPipingInsulation
C. 221005-PlumbingPiping
D. 221006-PlumbingPipingSpecialties
MurrayTowersRehab 000110-5 TableofContents
E. 224000-PlumbingFixtures
F. 224017-BathtubsandShowers
2.17 DIVISION23--HEATING,VENTILATING,ANDAIR-CONDITIONING(HVAC)
A. 230513-CommonMotorRequirementsforHVACEquipment
B. 230529-HangersandSupportsforHVACPipingandEquipment
C. 230593-Testing,Adjusting,andBalancingforHVAC
D. 230713-DuctInsulation
E. 230800-CommissioningofHVAC
F. 232300-RefrigerantPiping
G. 233100-HVACDuctsandCasings
H. 233423-HVACPowerVentilators
I. 237313-ModularIndoorCentral-StationAir-HandlingUnits
J. 238113-PackagedTerminalAir-Conditioners
K. 238119-Self-ContainedAir-Conditioners
L. 238126.13-Small-CapacitySplit-SystemAirConditioners
2.18 DIVISION25--INTEGRATEDAUTOMATION
2.19 DIVISION26--ELECTRICAL
A. 260505-SelectiveDemolitionforElectrical
B. 260519-Low-VoltageElectricalPowerConductorsandCables
C. 260526-GroundingandBondingforElectricalSystems
D. 260583-WiringConnections
E. 260923-LightingControlDevices
F. 262413-Switchboards
G. 262416-Panelboards
H. 262726-WiringDevices
I. 265100-InteriorLighting
J. 265600-ExteriorLighting
2.20 DIVISION27--COMMUNICATIONS
2.21 DIVISION28--ELECTRONICSAFETYANDSECURITY
A. 284600-FireDetectionandAlarm
2.22 DIVISION31--EARTHWORK
A. 311000-SiteClearing
B. 312200-Grading
C. 312316.13-Trenching
2.23 DIVISION32--EXTERIORIMPROVEMENTS
A. 321216-AsphaltPaving
B. 321313-ConcretePaving
C. 321710-ParkingBumpersandManufacturedTraffic-CalmingDevices
D. 321723-PavementMarkings
E. 321731-SteelGuardrail
F. 323113-ChainLinkFencesandGates
MurrayTowersRehab 000110-6 TableofContents
G. 323119-DecorativeMetalFencesandGates
H. 323223-SegmentalRetainingWalls
I. 323300-SiteFurnishings
J. 329219-Seeding
K. 329300-Plants
2.24 DIVISION33--UTILITIES
2.25 DIVISION34--TRANSPORTATION
2.26 DIVISION40--PROCESSINTEGRATION
2.27 DIVISION46--WATERANDWASTEWATEREQUIPMENT
MurrayTowersRehab 000110-7 TableofContents
MurrayTowersRehab 000115-8 ListofDrawingSheets
SECTION 000115
LIST OF DRAWING SHEETS
1.1 LIST OF DRAWINGS
1.01
A. Drawings: Drawings consist of the Contract Drawings and other drawings listed on the Drawing
Index Page of the separately bound drawing set titled Murray Towers Rehab, dated April
24,2026, as modified by subsequent Addenda and Contract Modifications.
END OF SECTION
SECTION011000
SUMMARY
PART1 GENERAL
1.01 PROJECT
A. ProjectName: MurrayTowersRehab
B. Owner'sName: HACP.
C. Architect'sName: FukuiArchitects.
D. AdditionalProjectcontactinformationisspecifiedinSection000103-ProjectDirectory.
1.02 CONTRACTDESCRIPTION
A. ContractType: Multipleprimecontracts,eachbasedonaStipulatedPriceasdescribedin
Document005000-ContractingFormsandSupplements.
1.03 DESCRIPTIONOFALTERATIONSWORK
A. ScopeofdemolitionandremovalworkisindicatedondrawingsandspecifiedinSection
024100.
B. Scopeofalterationsworkisindicatedondrawings.
1.04 WORKBYOWNER
A. OwnerhasawardedacontractforsupplyandinstallationofAccessControls,Environmental
Sensors,andSecurityCameraswhichw illcommenceonduringprojectconstruction.
B. ItemsnotedNIC(NotinContract)willbesuppliedandinstalledbyOwnerafterDateof
SubstantialCompletion. Someitemsinclude:
1. Unitrefrigeratorsandstoves
C. OwnerwillsupplythefollowingforinstallationbyContractor:
1.05 OWNEROCCUPANCY
A. OwnerintendstooccupytheProjectuponSubstantialCompletion.
B. CooperatewithOwnertominimizeconflictandtofacilitateOwner'soperations.
C. ScheduletheWorktoaccommodateOwneroccupancy.
1.06 CONTRACTORUSEOFSITEANDPREMISES
A. ProvideaccesstoandfromsiteasrequiredbylawandbyOwner:
1. EmergencyBuildingExitsDuringConstruction: Keepallexitsrequiredbycodeopen
duringconstructionperiod;providetemporaryexitsignsifexitroutesaretemporarily
altered.
2. Donotobstructroadways,sidewalks,orotherpublicwayswithoutpermit.
1.07 WORKSEQUENCE
A. ConstructWorkinstagesduringtheconstructionperiod:
1. Stage1: AsdescribedonPhasing/Scope/ResponsibilityScheduleCS2under"Phase1".
2. Stage2: AsdescribedonPhasing/Scope/ResponsibilityScheduleCS2under"Phase2".
3. Stage3:AsdescribedonPhasing/Scope/ResponsibilityScheduleCS2under"Phase3".
4. Stage4:AsdescribedonPhasing/Scope/ResponsibilityScheduleCS2under"Phase4".
B. CoordinateconstructionscheduleandoperationswithOwnerandArchitect.
1.08 SPECIFICATIONSECTIONSAPPLICABLETOEVERYCONTRACT
A. Unlessotherwisenoted,provisionsofthesectionslistedbelowapplytoeverycontract.
Specificitemsofworklistedunderindividualcontractdescriptionsconstituteexceptions.
B. Section000103-ProjectDirectory.
C. Section012500-SubstitutionProcedures.
MurrayTowersRehab 011000-9 Summary
D. Section013000-AdministrativeRequirements.
E. Section013216-ConstructionProgressSchedule.
F. Section015000-TemporaryFacilitiesandControls.
G. Section017000-ExecutionandCloseoutRequirements.
H. Section017800-CloseoutSubmittals.
ENDOFSECTION
MurrayTowersRehab 011000-10 Summary

With GovernmentContracts, you can:
Project: Montgomery County Planning Commission Engineering Services for Trail Signal Crossing Ref. #:
Montgomery County
Bid Due: 9/15/2026
Facility: Sports & Exhibition Authority and Stadium Authority Parking Garage and Lots Project:
Sports & Exhibition Authority of Pittsburgh and Allegheny County (SEA)
Bid Due: 8/06/2026
Facility: David L. Lawrence Convention Center Project: Wastewater Treatment Plant Tank Grating &
Sports & Exhibition Authority of Pittsburgh and Allegheny County (SEA)
Bid Due: 8/17/2026
CPOC PROMOTIONAL ITEMS BID 715-30 - Display, Exhibit, and Promotional Materials Responses due:
City of Philadelphia
Bid Due: 8/07/2026