| Location: | Connecticut |
|---|---|
| Posted: | Sep 17, 2026 |
| Due: | Oct 16, 2026 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | BID 2027-08 |
| Publication URL: | To access bid details, please log in. |
Diversion Chamber C Inlet Pipe Modifications -WPCF
Dewatering, cleaning, ground water control, CCTV, Cured-in-Place (CIPP) lining of located on the Water Pollution Control Facility (WPCF). Approximately 225 linear feet of 54-inch corrugated metal pipe (CMP) stormwater pipe. Approximately 105 linear feet of 12-inch reinforced concrete pipe (RCP) stormwater pipe. PREBID MEETING: 09/29/2026 - 10:00AM. ***DO NOT SUBMIT BIDS ELECTRONICALLY***
Phillip Ryan, Purchasing Agent Email: pryan@townofstratford.com Submit all requests for information (RFI) to email address above. Verbal communication will NOT be accepted.

With GovernmentContracts, you can:
...Utility (WPCU) is seeking competitive bids from qualified Contractors to provide sewer pipe... ...
State Government of Connecticut
Bid Due: 11/04/2026
...of four (4) corrugated steel arch pipes with a single 20-foot-wide by 6-foot ...
State Government of Connecticut
Bid Due: 11/04/2026
...from qualified Contractors to provide sewer pipe cleaning, Closed Circuit Television (CCTV), CIPP... ...
Town of Fairfield
Bid Due: 11/04/2026
...of its tributaries are enclosed within a series of large diameter pipes and ...
Town of Manchester
Bid Due: 11/10/2026