| Location: | Connecticut |
|---|---|
| Posted: | Sep 17, 2026 |
| Due: | Oct 2, 2026 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 39041 |
| Publication URL: | To access bid details, please log in. |
WATER METER INSTALLATIONS AT THE WILLIMANTIC CAMP MEETING ASSOCIATION WINDHAM
The work consists of the modification of existing plumbing at six (6) residences at the Willimantic Camp Meeting Association (WCMA) community to allow for the installation of 5/8 inch water meters. WWW shall shut off water service to the properties and provide the water meter and couplings necessary for its installation by the Contractor. The selected Contractor shall be responsible for providing all other labor and materials, including coordination and scheduling with WCMA, the tenants, and WWW. Work may be performed as tenant availability allows; however, work during WWW normal hours of operation is preferred whenever possible, which is between 7:00 A.M. and 3:00 P.M., Monday through Friday.
Christian Perez Windham Water Works 174 Storrs Road Mansfield Center CT, 06250 United States Tel: 8604653086 Ext:2022 cperez@windhamwaterworks.com

With GovernmentContracts, you can:
...IPSWICH WATER TREATMENT PLANT, DWSRF 19229 Location: 274 High St. - Ipswich, Massachusetts ...
O'Connell Companies
Bid Due: 10/26/2026
...Project: Boiler Replacement at Waste Water Treatment Plant (WWTP) Ref. #: 26-3 Type: ...
Town of Beacon Falls
Bid Due: 10/19/2026
...Cromwell Fire District - Water Interconnection Project The installation of two interconnection... stations ...
State Government of Connecticut
Bid Due: 11/06/2026
...Project: Boiler Replacement at Waste Water Treatment Plant (WWTP) Ref. #: 26-3 Type: ...
Town of Beacon Falls
Bid Due: 10/19/2026