| Location: | Florida |
|---|---|
| Posted: | Sep 9, 2025 |
| Due: | Sep 18, 2025 |
| Agency: | Pinellas County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25-0681-ITB-C |
| Publication URL: | To access bid details, please log in. |
Project ID: 25-0681-ITB-C
Title: Pinellas County Keller Water Treatment Plant 60" Valve Insertion (PID 005224A)
Addenda: 0
Release Date: 9/9/2025
Due Date: 9/18/2025
Installation of 60” valve and 42” bypass at the Keller Water Treatment Plant.
The current configuration of the 60” Steel Water Transmission Main does not have an in-line valve that can be shut down in case of emergency. The current configuration only allows for all Region Water supply to tb shut off at the twin barrels within the Keller Water Treatment Plant.

With GovernmentContracts, you can:
...Advertisement Detail Department of Transportation Agency Decisions WATER/WASTEWATER TREATMENT PLANT... SERVICE 991-730-000-0000 SEWAGE ...
State Government of Florida
Bid Due: 10/11/2040
...Advertisement Detail Department of Transportation Agency Decisions Maintenance of Water Treatment...
State Government of Florida
Bid Due: 10/11/2080
...Agency Decisions WATER/WASTEWATER TREATMENT PLANT Advertisement Number: ITB-DOT-10/11-4018TB-AWARD... 991-900-000-0000 WATER TREATMENT & WATER ...
State Government of Florida
Bid Due: 10/11/2040
...Description: Water Treatment and Water Resources Continuing Engineering S Department: Water...
Palm Beach County
Bid Due: 7/09/2026