| Location: | Florida |
|---|---|
| Posted: | Sep 9, 2025 |
| Due: | Sep 18, 2025 |
| Agency: | Pinellas County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25-0681-ITB-C |
| Publication URL: | To access bid details, please log in. |
Project ID: 25-0681-ITB-C
Title: Pinellas County Keller Water Treatment Plant 60" Valve Insertion (PID 005224A)
Addenda: 0
Release Date: 9/9/2025
Due Date: 9/18/2025
Installation of 60” valve and 42” bypass at the Keller Water Treatment Plant.
The current configuration of the 60” Steel Water Transmission Main does not have an in-line valve that can be shut down in case of emergency. The current configuration only allows for all Region Water supply to tb shut off at the twin barrels within the Keller Water Treatment Plant.

With GovernmentContracts, you can:
...Advertisement Detail Department of Transportation Agency Decisions WATER/WASTEWATER TREATMENT PLANT.... POSTING OF INTEND ...
State Government of Florida
Bid Due: 10/11/2040
...Agency Decisions WATER/WASTEWATER TREATMENT PLANT Advertisement Number: ITB-DOT-10/11-4018TB-AWARD... WATER/WASTEWATER TREATMENT PLANT. Please direct ...
State Government of Florida
Bid Due: 10/11/2040
...Description: Water Treatment Plant 11 Upgrades Progressive Design Build Department: Water...
Palm Beach County
Bid Due: 4/22/2029
...Description: Water Treatment Plant 11 Upgrades Progressive Design Build Department: Water...
Palm Beach County
Bid Due: 1/31/2030