| Location: | South Carolina |
|---|---|
| Posted: | May 6, 2025 |
| Due: | Jun 5, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | H15-9678-ML-D |
| Publication URL: | To access bid details, please log in. |
Base bid work includes complete removal of the 5th fl decorative band to the structural tie-in connection. All new framing, sheathing, stucco, sealants, and their attachment to the main structure. Contractor shall base bid on modifying/replacing 10% of the structural tie-in connection and interior demo and replacement and provide a unit price for an add/deduct quantity. Also included is brick masonry as indicated on structural and arch drawings.

With GovernmentContracts, you can:
...Project: Design/Build Services for Bees Ferry Animal Services Emergency Procurement Ref. #: RFP... ...
Charleston County
Bid Due: 11/24/2026
...Project Delivery Method: Design-Bid-Build Construction Cost Range: $150,000.00 - $250,000.00 Agency... is a ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 12/04/2026
...Delivery Method: Design-Bid-Build Construction Cost Range: $225,000 TO $275,000 Prime Contractor License... (Special ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 12/03/2026
...Location: Hardeeville, SC - Jasper County Anticipated Project Delivery Method: Design-Bid-Build Agency... the ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 1/05/2027