| Location: | South Carolina |
|---|---|
| Posted: | May 6, 2025 |
| Due: | Jun 5, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | H15-9678-ML-D |
| Publication URL: | To access bid details, please log in. |
Base bid work includes complete removal of the 5th fl decorative band to the structural tie-in connection. All new framing, sheathing, stucco, sealants, and their attachment to the main structure. Contractor shall base bid on modifying/replacing 10% of the structural tie-in connection and interior demo and replacement and provide a unit price for an add/deduct quantity. Also included is brick masonry as indicated on structural and arch drawings.

With GovernmentContracts, you can:
...of existing 28' wide by 48" tall evaporative cooling system and framing and ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/09/2026
...shower & acc provided, appx $4,400. Type: Crawl Space, Concrete Block. Req'd: Plumbing, ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/18/2026
..., Framing. Documents May Be Obtained From: lisa.eubanks@oidd.bhdd.sc.gov Project Details: N/A Print Ad...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/18/2026
...: Plumb, Framing Documents May Be Obtained From: inga.caudill@oidd.bhdd.sc.gov Project Details: N/A Print ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/11/2026