| Location: | South Carolina |
|---|---|
| Posted: | May 6, 2025 |
| Due: | Jun 5, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | H15-9678-ML-D |
| Publication URL: | To access bid details, please log in. |
Base bid work includes complete removal of the 5th fl decorative band to the structural tie-in connection. All new framing, sheathing, stucco, sealants, and their attachment to the main structure. Contractor shall base bid on modifying/replacing 10% of the structural tie-in connection and interior demo and replacement and provide a unit price for an add/deduct quantity. Also included is brick masonry as indicated on structural and arch drawings.

With GovernmentContracts, you can:
...Delivery Method: Design-Bid-Build Construction Cost Range: $2,000,000 to $2,500,000 Agency Project...: Improvements include ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/25/2026
...: Design-Bid-Build Construction Cost Range: $1,235,000 to $1,305,000 Agency Project Coordinator... and support ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/17/2026
...and hardware. Documents May Be Obtained From: Scherrie Cogdill, Director of Design and ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/30/2026
...29104 Project Delivery Method: Design-Build Construction Cost Range: $96,000 Agency Project... with applicable ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/15/2026