| Location: | Pennsylvania |
|---|---|
| Posted: | Sep 9, 2025 |
| Due: | Oct 9, 2025 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Bucks County Water & Sewer Authority, PA |
| Publication URL: | To access bid details, please log in. |
Project Description: The Work consists of all labor, equipment, and materials for mobilization and demobilization, demolition, removal, and disposal of un-needed materials, installation of a temporary odor control system and piping complete in-place, installation of a new air scrubber system, new control system, electrical and control wiring and all appurtenances, as needed, for a complete and functioning system, new concrete pad, water supply, utility relocation as required, site restoration, appurtenant work, site cleanup, and removal of temporary facilities.

With GovernmentContracts, you can:
.... * Excavation, stockpiling and backfilling. * Connection to existing electrical utilities * ...
PennBid
Bid Due: 6/19/2026
...Lighting Panel, Safety Switch, Cathodic Protection Panel, and Pump Control Panel. New electrical... ...
DEPT OF DEFENSE
Bid Due: 6/30/2026
..., paving, lawn and concrete sidewalk restoration, installation of two Authority supplied simplex... ...
PennBid
Bid Due: 6/30/2026
...and its related components, and installation of a new hydraulic system with supporting ...
DEPT OF DEFENSE
Bid Due: 6/18/2026