Deepstep Road Pump Station and Force Main

Location: Georgia
Posted: Aug 24, 2026
Due: Aug 27, 2026
Agency: G. Ben Turnipseed Engineers
Type of Government: State & Local
Category:
  • 43 - Pumps and Compressors
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
City of Sandersville, Georgia Deepstep Road Pump Station and Force Main

Bid Date: Thursday, August 27, 2026

Bid Time: 2:00 p.m.

Contact: Mandy Soares, (706) 863-8800

Addendum: Addendum No. One has been issued.

Plan Holders List

Advertisement for Bid

Division One: Construction of a water line extension including a 100 LF Jack & Bore installation of 8-inch water line, relocation of one 8-inch water meter in new vault and installation of one 8-inch water meter in a new vault to include gate valves and fire hydrant. Division Two: Construction of a raw sewage pump station site including precast wetwell, submersible pumps, road grading, rocking, fencing, water service and approximately 5,500 L.F of 6-inch sewer force main and gravity sewer and connection manhole.

Purchase Plans & Specs

Attachment Preview

ADVERTISEMENT FOR BIDS FOR CONSTRUCTION OF
DEEPSTEP ROAD PUMP STATION AND FORCEMAIN
FOR THE
CITY OF SANDERSVILLE, GEORGIA
Sealed proposals will be received by the City of Sandersville, Georgia at the City of Sandersville
City Hall, P.O. Box 71 or 141 West Haynes Street, Sandersville, Georgia 31082 until 2:00 p.m.
local time, Thursday, August 27, 2026 at which time and place they will be publicly opened and
read. No submitted bid may be withdrawn after the scheduled closing time for receipt of bids for
a period of sixty (60) days.
All Bidders must have a State of Georgia Utility Contractor License and must employ a state
"Utility Manager" certificate holder who will have oversight of all the work.
The work to be done consists of furnishing all materials, equipment and labor for the construction
of:
Division One:
Construction of a water line extension including a 100 LF Jack & Bore installation of 8-
inch water line, relocation of one 8-inch water meter in new vault and installation of one
8-inch water meter in a new vault to include gate valves and fire hydrant.
Time of completion for Division One is 60 calendar days.
Division Two:
Construction of a raw sewage pump station site including precast wetwell,
submersible pumps, road grading, rocking, fencing, water service and
approximately 5,500 L.F. of 6-inch sewer force main and gravity sewer and
connection manhole.
Time of completion for Division One is 180 calendar days.
Proposals for the complete work in one general contract shall be made on the proposal form
provided and shall contain prices in words and figures for the work bid on.
All proposals shall be accompanied by a Bid Bond drawn in favor of the City of Sandersville,
Georgia, in the amount of at least 5% of the lump sum bid for the complete work; such Bid Bond
representing that the Bidder, if awarded the contract, will promptly enter into a contract and furnish
Performance Bond and Payment Bond as provided by law and approved by the Attorney for the
City of Sandersville, Georgia. Each bond shall be equal to 100% of the contract amount. The Bid
Bond shall be forfeited to the City of Sandersville, Georgia as liquidated damages if the Bidder
fails to execute the contract and provide Performance and Payment Bonds within 10 days after
being notified that he has been awarded the contract.
GBT/DOC MCS 02/24 AB-1 ADVERTISEMENT FOR BIDS
Sandersville/26043

Drawings and Specifications are open to public inspection at the office of the City of Sandersville,
Georgia and at the offices of Turnipseed Engineers in Augusta and Atlanta, Georgia.
Copies of the plans and specifications must be obtained from Turnipseed Engineers, 4210
Columbia Road, Building 3, Augusta, Georgia 30907, upon receipt of $150. Additional reduced
drawings are available for $75.
Digital copies of the documents are available from the Turnipseed Offices.
Upon receipt of all documents in undamaged condition within 30 days after the date of opening of
bids, half of the deposit will be refunded.
The difference between the deposit and the amount refunded represents the cost of reproduction.
No refund will be made for documents received after 30 days or in damaged condition.
The Owner reserves the right to reject any or all bids and to waive informalities.
CITY OF SANDERSVILLE, GEORGIA
By:
James Andrews, Mayor
ADVERTISEMENT FOR BIDS AB-2 GBT/DOC MCS 02/24
Sandersville/26043

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Broad St Water Main Replacement Statesboro, City Of Aug 03, 2026 @ 08:31 ...

State Government of Georgia

Bid Due: 9/08/2026

...Sewell Mill Heights Water Main Replacement Cobb County Aug 28, 2026 @ 09:15 ...

State Government of Georgia

Bid Due: 9/10/2026

...BL047-26 NOT State Route 120 Water Main Replacement Buyer Contact : Anna.West@GwinnettCounty.com... STATE ...

Gwinnett County

Bid Due: 9/04/2026

...Project ID: W2436 Title: Sewell Mill Heights Water Main Replacement Addenda: 0 Release ...

Cobb County

Bid Due: 9/10/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.