| Location: | Georgia |
|---|---|
| Posted: | Nov 12, 2024 |
| Due: | Dec 13, 2024 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-66395-NONST-2024-000000003 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-66395-NONST-2024-000000003 | ARPA Sanitary Sewer Improvements | Dawson, City Of |
Nov 12, 2024 @ 04:13 PM
|
Dec 13, 2024 @ 01:30 PM
|
Start Date: Nov 12, 2024 @ 04:13 PM ET
End Date:
Dec 13, 2024 @ 01:30 PM ET
Sealed Bids for the construction of the Project will be received at the Dawson City Hall located at 101 South Main Street, Dawson, GA 39842, until December 13, 2024 at 1:30 PM local time. The work shall generally consist of furnishing all products and performing all labor necessary to construct the following: Pipebursting existing 15¿ terracotta clay pipe to approximately 850 L.F. of 18¿ HDPE pipe and 1,200 L.F. of 16¿ HDPE pipe, pipebursting approximately 300 L.F. of 8¿ DIP to 8¿ HDPE, approximately 400 L.F. of 18¿ PVC pipe installed by open trench installation, manhole rehabilitation and construction, flow control measures, site restoration, and all other appurtenances necessary to complete the project in accordance with the specifications and construction drawings. This project will be funded in whole or in part with American Rescue Plan funds administered by the Governor¿s Office of Planning and Budget (OPB) State Fiscal Recovery Fund (SFRF) grant program. This project will be required to comply with all applicable Federal requirements, including those outlined in Appendix II of 2 CFR 200, as well as existing State public works construction requirements. Applicable Federal Requirements are included in the Contract Documents.
| Code | Description |
| 91345 | Construction, Sewer and Storm Drain |
| 91063 | Public Utilities: Water, Sewer and Gas Maintenance and Repair Services |
Roxie Powell
roxie.powell@cityofdawson.org
229 995-4444 ext. 225

With GovernmentContracts, you can:
...includes rehabilitation of 57 manholes (approximately 725 vertical feet), including surface... Fairfield Plantation ...
State Government of Georgia
Bid Due: 6/25/2026
...Construction, Manhole & Valve Box Adjustments, Cured-in-Place (CIPP) Rehabiliation, Manhole... Rehabilitation, and Stormwater ...
County of Cobb
Bid Due: 5/31/2028
...), towards the procurement intended to support the continued rehabilitation, renewal, and repair ...
State Government of Georgia
Bid Due: 6/19/2026
...includes preforming sanitary sewer rehabilitation with cured in place lining (CIPP) and rehabilitated... ...
State Government of Georgia
Bid Due: 7/16/2026