Larsen Power Plant Stairwell Extension

Location: Florida
Posted: Apr 22, 2026
Due: May 22, 2026
Agency: City of Lakeland
Type of Government: State & Local
Category:
  • 49 - Maintenance and Repair Shop Equipment
Publication URL: To access bid details, please log in.


Project ID:

Title: Larsen Power Plant Stairwell Extension

Addenda: 0

Release Date: 4/22/2026

Due Date: 5/22/2026

Follow
Larsen Power Plant Stairwell Extension
Request For Proposal
LE - Production - MPP
23 , 5413
Project ID: 2026-RFP-037
Release Date: Wednesday, April 22, 2026
· Due Date: Friday, May 22, 2026 3:30pm
Posted Wednesday, April 22, 2026 8:00am
All dates & times in Eastern Time
Draft Response Events RSVP No Bid29 days, 18 hours, 1 minutes


Post Information

Posted At:Wed, Apr 22, 2026 8:00 AM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary

The City of Lakeland is seeking a qualified contractor to provide fabrication, shop drawings, and construction services of a stairwell extension at the Larsen Power Plant main building. The project consists of extending the existing stairwell structure to provide safe access to the roof level, per the attached structural drawings. These drawings represent the basis of design and intended configuration of the system. The selected contractor shall be responsible for field verification, preparation of shop drawings, fabrication, and full installation of the stairwell system.

The contractor shall review the provided design and verify all field conditions. Any discrepancies, constructability concerns, or required adjustments shall be brought to the City’s attention prior to fabrication. The vendor is responsible for ensuring proper installation and integration with the existing structure.

A mandatory in-person pre-bid meeting and site walkdown will be conducted at the Larsen Power Plant prior to bid submission. Attendance is required for all prospective bidders to review site conditions, ask questions, and fully understand the project scope.



Background

Existing stairwell drawings are provided for reference. The proposed new stairwell extension and required modifications are identified in the highlighted drawing set. The new work will connect to the existing stairwell structure and extend access to the roof level. The vendor shall verify all field conditions and ensure proper integration with the existing structure.



Timeline

RFP release:
April 22, 2026
Pre-Proposal Meeting (Mandatory):
May 1, 2026, 10:00am
LARSEN POWER PLANT 2002 EAST US HIGHWAY 92 LAKELAND FL 33801
RFP questions deadline:
May 14, 2026, 5:00pm
RFP proposal due date:
May 22, 2026, 3:30pm
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Project ID: 26-0416-RFQ-CCNAC Title: Civil/Structural Engineering Consulting Services Addenda: 0... Release Date: 5/29/2026 ...

Pinellas County

Bid Due: 6/30/2026

...design services on all disciplines to include architectural, civil, structural, mechanical...) (OPEN ENDED) ...

DEPT OF DEFENSE

Bid Due: 6/08/2026

...is seeking qualified civil/structural engineering firms to perform Title I and Title II ...

DEPT OF DEFENSE

Bid Due: 6/08/2026

...will be to provide designs for new or renovated civil, structural and environmental ...

DEPT OF DEFENSE

Bid Due: 6/08/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.