| Location: | Texas |
|---|---|
| Posted: | Sep 16, 2025 |
| Due: | |
| Agency: | |
| Type of Government: | Federal |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.
PROJECT NUMBER: TX FLAP UV CR203(1)
PROJECT NAME: Fish Hatchery Road
PROJECT DESCRIPTION:
Widening and reconstruction of 0.71 miles of CR203 (Fish Hatchery Road) for access to the US Fish and Wildlife Service (USFWS) Uvalde National Fish Hatchery, in Uvalde, Texas, beginning at the intersection of US 90 and ending at the Fish Hatchery gate. The project terrain is level. There are no optional schedules or optional project termini.
SCOPE OF THE WORK:
The project will widen and reconstruct 0.71 miles of CR203(Fish Hatchery Road) that serves the northern access to the Uvalde National Fish Hatchery (NFH) and eight private property accesses. Roadway widening from 15-feet to 24-feet will be on one side of the road, allowing use of the existing roadway for project phasing. Suggested phasing plans show phase 1 as widening of the west half of the road with embankment and aggregate construction in, then phase 2 shifts traffic onto the west-side aggregate base while Full Depth Reclamation embankment, and aggregate work is completed, to be followed by roadway asphalt paving. Grading of ditches, culvert work, signing, and striping is also required.
PRINCIPAL WORK ITEMS:
Embankment Construction: 1,300 CY
Roadway aggregate: 3,800 Tons
Asphalt Pavement: 2,000 Tons
Culverts: One 36” diameter pipe (45 LF), one 24” diameter pipe (45 LF), and flared end sections for both
ANTICIPATED SCHEDULE:
Advertisement: October 2025
Award: November-December 2025
Construction: Jan 2026 thru April 2026
ESTIMATED COST RANGE: $700,000.00 to $2,000,000.00.