| Location: | Florida |
|---|---|
| Posted: | Jun 26, 2025 |
| Due: | Jul 17, 2025 |
| Agency: | Escambia County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PD 24-25.115 |
| Publication URL: | To access bid details, please log in. |
Project ID: PD 24-25.115
Title: Boiler Equipment Replacement - ELM Building
Addenda: 0
Release Date: 6/26/2025
Due Date: 7/17/2025
The procurement is an advanced equipment package purchase for the replacement of multiple non-operational boilers and pump equipment. This is an equipment purchase ONLY. The equipment should be delivered to Escambia County Facilities Management 100 E. Blount Street; Pensacola, FL 32501.
The non-operational equipment is beyond life expectancy and needs immediate replacement. Although the installation of this equipment is in the professional design phase, the County is seeking to advance purchase the equipment in order to time delivery with installation scheduled to be complete prior to October 15, 2025.
The design for this project is based on AERCO BENCHMARK 3000 Low NOx Boilers (natural gas fired) and BELL & GOSSETT E-1510 Pumps.

With GovernmentContracts, you can:
...Description: Gleneagles Aquatic Center - Pool Heat Pump Installation Department: Facilities...
Palm Beach County
Bid Due: 7/06/2030
...will perform all engineering and installation. Emergency Back-Up Pumps technician... and installation. Emergency ...
JEA
Bid Due: 8/04/2026
...installation of wet well, pumps, SCADA system, electrical and control equipment, emergency generator, ...
City of Tampa
Bid Due: 8/04/2026
...automated duplex stormwater pump station at Forest Hills Park. The work includes installation... ...
City of Tampa
Bid Due: 8/04/2026