| Location: | North Carolina |
|---|---|
| Posted: | Jun 9, 2026 |
| Due: | Jul 9, 2026 |
| Agency: | State Government of North Carolina |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 377-2026-056 |
| Publication URL: | To access bid details, please log in. |
| Solicitation Number: | 377-2026-056 |
| Project Title: | IFB 2026-056 Union County School Administration Roof Replacement Project |
| Description: | IFB 2026-056 Union County School Administration Roof Replacement Project Scope of Work: Remove existing roof system down to the existing structural deck and provide new roof system along with sheet metal flashing and accessories to provide a complete, watertight, 20-year warrantable roof assembly. HVAC Modification: Raise 2 HVAC units at roof C providing minimum 8” flashing height, reroute/raise gas lines to provide adequate space for roof installation, and provide new insulated ductwork and supports from units to wall penetration. Alternate NO. 1: Provide new elevation wall sealant joints around perimeter of the building. Alternate NO. 2: Provide approximately 40 LF of new fall protection handrails on roof area C along gutter edge at HVAC units. |
| Opening Date: | 7/9/2026 2:00 PM |
| Posted Date: | 6/10/2026 |
| Status: | Open |
| Department: | COUNTY OF UNION |
|
Solicitation Number
*
377-2026-056
|
Department
COUNTY OF UNION
|
Status Reason
Open
|
|
|
Opening Date
2026-07-09T14:00:00.0000000
|
Posted Date
*
2026-06-09T20:00:25.0000000Z
|
Primary Commodity Code
Construction Services
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
—
|
Solicitation Type
*
Select RFP IFB RFI
|
|
|
Owner
Corey Brooks
|
|||
|
Description
IFB 2026-056 Union County School Administration Roof Replacement Project Scope of Work: Remove existing roof system down to the existing structural deck and provide new roof system along with sheet metal flashing and accessories to provide a complete, watertight, 20-year warrantable roof assembly. HVAC Modification: Raise 2 HVAC units at roof C providing minimum 8” flashing height, reroute/raise gas lines to provide adequate space for roof installation, and provide new insulated ductwork and supports from units to wall penetration. Alternate NO. 1: Provide new elevation wall sealant joints around perimeter of the building. Alternate NO. 2: Provide approximately 40 LF of new fall protection handrails on roof area C along gutter edge at HVAC units.
|
|||

With GovernmentContracts, you can:
...system along with sheet metal flashing and accessories to provide a complete, watertight, ...
City of Charlotte
Bid Due: 7/21/2026
...system along with sheet metal flashing and accessories to provide a complete, watertight, ...
City of Charlotte
Bid Due: 7/21/2026