| Location: | Connecticut |
|---|---|
| Posted: | Feb 4, 2026 |
| Due: | Mar 18, 2026 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | DEEP020526CM |
| Publication URL: | To access bid details, please log in. |
Replace the existing spillway with a concrete drop inlet strucure with 48-inch discharge pipe and energy dissipator at the downstream end. A new 16-inch outlet pipe controlled by a stainless steel slide gate will be installed in the drop inlet spillway structure. Installation of a new valve and extension stem on the existing low level outlet upstream of the dam at the bottom of the reservoir. Trees will be cleared from the embankments and the downstream slope will be filled in the vicinity of the new spillway discharge pipe and energy dissipator. Eroded areas on the crest will be repaired, the crest will be raised one foot. Riprap will be placed on the upstream slope. Construction of a 100-foot long auxiliary spillway with concrete core wall. Clear trees and stumps from left dike, topsoil and seeded with grass.
James Heaven James.Heaven@ct.gov

With GovernmentContracts, you can:
Yard Waste Grinding and Removal Services This RFP is being posted to this
State Government of Connecticut
Bid Due: 6/24/2026
Installation & Revision of Traffic Control Signals - Various Cities/Towns in D3 Start
State Government of Connecticut
Bid Due: 7/01/2026
***UPDATED 06-05-2026*** Request for Qualifications (RFQ) Regional Freight Study WestCOG seeks to engage
Western Connecticut Council of Governments
Bid Due: 7/15/2026
NUMBER TITLE STATUS BID TYPE NAME CONTACT INFORMATION AVAILABLE DATE CLARIFICATION DEADLINE DUE
Regional Water Authority
Bid Due: 6/24/2026