| Location: | South Carolina |
|---|---|
| Posted: | Apr 11, 2025 |
| Due: | May 13, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Replacement of pump motors and associated piping in the Influent Pump Station, installation of a mechanical bar screen, associated electrical and instrumentation work, as well as alternates involving the Sequencing Batch Reactor replacing diffused air units and installing safety railings around the reactors.

With GovernmentContracts, you can:
...Honea Path SC 29654 Project Delivery Method: Design-Bid-Build Construction Cost Range: $500K - ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 10/22/2026
...as specified herein. Installation will be done by others. 1. BASIS OF DESIGN ...
Clemson University
Bid Due: 9/29/2026
...Method: Design-Bid-Build Construction Cost Range: $1,250,000 to $1,750,000 Prime Contractor License...@citadel.edu Telephone: (843) ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/28/2026
...) Project Delivery Method: Design-Bid-Build Construction Cost Range: $800,000 to $900,000 Prime..., Installation ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/29/2026