| Location: | South Carolina |
|---|---|
| Posted: | Apr 11, 2025 |
| Due: | May 13, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Replacement of pump motors and associated piping in the Influent Pump Station, installation of a mechanical bar screen, associated electrical and instrumentation work, as well as alternates involving the Sequencing Batch Reactor replacing diffused air units and installing safety railings around the reactors.

With GovernmentContracts, you can:
...Method: Design-Bid-Build Construction Cost Range: $2,000,000 to $2,500,000 Agency Project Coordinator... suspended ceilings, ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/30/2026
...Delivery Method: Design-Bid-Build Construction Cost Range: $1,750,000 to $2,250,000 Agency Project... in a ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/30/2026
...:00pm Project Location: 4700 Broad River Road, Columbia SC Project Delivery Method: Design-Bid-Build...-filter, ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/06/2026
...elevation boardwalk and structures; electrical and mechanical improvements; plumbing; playground.../contractors for Construction Manager ...
City of Clemson
Bid Due: 6/30/2026