DC00496 HS-2403AX_DUPLIN RESURFACING

Location: North Carolina
Posted: Mar 26, 2026
Due: Apr 16, 2026
Agency: Division of Highways
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Publication URL: To access bid details, please log in.
  • DC00496 HS-2403AX_DUPLIN RESURFACING
    POC
    DC00496 HS-2403AX_DUPLIN RESURFACING
  • Attachment Preview

    STATE STATE PROJECT REFERENCE NUMBER SHEET NO.
    NC 2026CPT.03.08.10311, ETC. 1 STATE PROJECT NUMBER DESCRIPTION
    MAP ROUTE DESCRIPTION TYPE
    1 NC-41 FROM BRIDGE JOINT APPROX 0.16 MI WEST OF SR 1964 (DURWOOD EVANS RD) TO 0.01 MI NORTH OF NC HWY 24 [MP 22.98 - MP 31.47] Resurfacing, 14" CL, 8" SH
    PROJECT LENGTH Prepared in the Office of: Prepared in the Office of: DIVDISIVIIOSINO NO OFF H HIIGGHHWWAAYYSS 5501 BARB1A13D AOISR PBOLRVTD D., RC.,A ESDTELNET OHNA,Y NNCE 2,7 N93C2, 28429
    MAP MILES 1 8.49 B. N. BRASWELL, PE J. S. ABEL, JR. This exhibit does not meet NC 47-30 requirements and therefore is not intended for design, DIV. PROJ. DEVELOPMENT ENGINEER DIVISION PROJECT TEAM LEAD construction, or recording or transfer of title. C. E. SLACHTA D. H. STALLINGS DIVISION CONTRACT ENGINEER DIVISION DESIGN ENGINEER
    MAP MILES
    1 8.49

    STATE OF NORTH CAROLINA SHEET
    STATE STATE PROJECT REFERENCE NUMBER NO.
    NC 2026CPT.03.08.10311, ETC. 1 DIVISION OF HIGHWAYS
    STATE PROJECT NUMBER DESCRIPTION
    DUPLIN COUNTY
    TYPE OF WORK: RESURFACING, 14" CL, 8" SH
    NC Center for Geographic Information and Analysis, NC 911 Board
    Prepared in the Office of:
    PROJECT LENGTH DIVISION OF HIGHWAYS
    113 AIRPORT DR., EDENTON, NC 27932
    B. N. BRASWELL, PE J. S. ABEL, JR.
    DIV. PROJ. DEVELOPMENT ENGINEER DIVISION PROJECT TEAM LEAD
    C. E. SLACHTA D. H. STALLINGS
    DIVISION CONTRACT ENGINEER DIVISION DESIGN ENGINEER
    .CTE
    ,11301.80.30.TPC6202
    :ON
    SBW
    69400CD
    :TCARTNOC

    UV
    117 UV 403
    903
    117 Calypso
    UV
    Faison 111
    117
    UV
    Warsaw
    UV 11 UV Division 3 Bridges
    24 UV 111 UV
    50 241 Resurfacing
    I-40 Kenansville UV
    14" CL, 8" SH
    24
    Beulaville
    UV 9 M 03 ag R n o o 1 s 1 l e i 7 a Hill UV 1 G 1 re UV e 5 n 0 evers UV 41 UV 111 S R- 1 7 0 1 UV 24 1 7 0 2 SR-1727 UV 11 B 1 eu UV 2 la 41 v UV ille UV 41 S R -1 7 2 0 SR-1721 S R - 1 7 2 3
    UV UV S
    R-
    24 UV
    50
    Harrells
    Te
    W
    ac
    a
    h
    ll
    e
    a
    y
    ce
    41 SR-1961
    6 2 R- 1 7 2
    4
    S R -1 8
    24
    R- 1 9 S 3 2 8 3 5
    S 1
    R-
    S
    S
    R- 1 9 6 5 SR-1800 SR-1804 S
    N.
    J A CR K S O N SS -
    T)
    1 R 8 -1 0 8 7 36
    S
    R - 1 7 1 5
    41 (
    SR-1966 0 2 A
    P
    pp
    R
    r
    O
    o
    J
    x
    E
    .
    C
    M
    T
    P
    L
    2
    IM
    5.5
    IT
    05 1 8
    0 1 S
    H
    W Y R-1809 SR-1810
    UV S
    R- 1
    8
    SR-1814 S
    R-
    M
    1
    AP R
    NC
    O
    -4
    U
    1
    TE
    F
    D
    R
    E
    O
    S
    M
    C
    B
    R
    R
    I
    I
    P
    D
    T
    G
    I
    E
    O
    J
    N
    OINT APPROX 0.16 MI WEST OF SR 1964
    T
    Re
    Y
    s
    P
    u
    E
    rfacing, 14" CL, 8" SH
    SR-1964
    MAP 1 41
    HWY
    24 (W. MAIN
    ST)
    SR-1812
    A
    P
    p
    R
    p
    O
    ro
    JE
    x.
    C
    M
    T
    P
    L I
    3
    M
    1.
    I
    4
    T
    7
    (
    [
    D
    M
    U
    P
    R
    2
    W
    2.
    O
    9
    O
    8
    D
    - M
    EV
    P
    A
    3
    N
    1
    S
    .4
    R
    7
    D
    ]
    ) TO 0.01 MI NORTH OF NC HWY 24
    SR-1967
    HWY
    24 (E. MAIN
    ST)
    T)
    S
    N
    SR-1968
    300074 UV
    111 R- 1 8 1 6
    SR-1815
    H W Y 41 ( S.
    J
    A C
    K S O
    0
    A
    P
    p
    R
    pr
    O
    o
    J
    x
    E
    .
    0
    C
    M
    .
    T
    0
    P
    L
    1
    2
    IM
    5.5
    IT
    75
    0.0 M 2 iles
    UV
    111
    S
    UV 300065 SR-1817
    50 UV
    SR-1820
    0 1
    50
    UV Miles
    41
    Prepared in the Office of:
    DIVISION OF HIGHWAYS
    5501 BARBADOS BLVD., CASTLE HAYNE, NC, 28429
    MAP MILES This exhibit does not meet NC 47-30 requirements and therefore is not intended for design,
    1 8.49 construction, or recording or transfer of title.

    STATE S STATE PROJECT REFERENCE NUMBER HEET NO.
    NC 2026CPT.03.08.10311, ETC. 2 STATE PROJECT NUMBER DESCRIPTION
    MAP ROUTE DESCRIPTION TYPE
    2 NC-111 EXISTING JOINT 0.03 MILES N OF MACON DR TO NC 241 [MP 15.20 - MP 15.06] Resurfacing
    PROJECT LENGTH Prepared in the Office of: Prepared in the Office of: DIVDISIVIIOSINO NO OFF H HIIGGHHWWAAYYSS 5501 BARB1A13D AOISR PBOLRVTD D., RC.,A ESDTELNET OHNA,Y NNCE 2,7 N93C2, 28429
    MAP MILES 2 0.14 B. N. BRASWELL, PE J. S. ABEL, JR. This exhibit does not meet NC 47-30 requirements and therefore is not intended for design, DIV. PROJ. DEVELOPMENT ENGINEER DIVISION PROJECT TEAM LEAD construction, or recording or transfer of title. C. E. SLACHTA D. H. STALLINGS DIVISION CONTRACT ENGINEER DIVISION DESIGN ENGINEER
    MAP MILES
    2 0.14

    STATE OF NORTH CAROLINA SHEET
    STATE STATE PROJECT REFERENCE NUMBER NO.
    NC 2026CPT.03.08.10311, ETC. 2 DIVISION OF HIGHWAYS
    STATE PROJECT NUMBER DESCRIPTION
    DUPLIN COUNTY
    TYPE OF WORK: RESURFACING
    Prepared in the Office of:
    PROJECT LENGTH DIVISION OF HIGHWAYS
    113 AIRPORT DR., EDENTON, NC 27932
    B. N. BRASWELL, PE J. S. ABEL, JR.
    DIV. PROJ. DEVELOPMENT ENGINEER DIVISION PROJECT TEAM LEAD
    C. E. SLACHTA D. H. STALLINGS
    DIVISION CONTRACT ENGINEER DIVISION DESIGN ENGINEER
    .CTE
    ,11301.80.30.TPC6202
    :ON
    SBW
    69400CD
    :TCARTNOC

    UV
    117 UV 403
    903
    117 Calypso
    UV
    Faison 111
    117
    UV
    Warsaw
    UV 11 UV Resurfacing
    24 UV 111 UV
    50 241
    I-40 Kenansville UV
    24
    Beulaville
    Magnolia UV UV UV UV
    UV UV 50 41 UV 111 241
    903 11 111
    117
    Greenevers
    Rose Hill
    UV
    UV
    50
    Teachey 41
    Harrells
    Wallace
    MAP 2
    UV
    241
    UV
    111
    Beulaville
    MAP ROUTE DESCRIPTION TYPE
    2 NC-111 EXISTING JOINT 0.03 MILES N OF MACON DR Resurfacing
    UV
    TO NC 241 [MP 15.20 - MP 15.06]
    41
    UV 0 0.04
    41 Miles
    Prepared in the Office of:
    DIVISION OF HIGHWAYS
    5501 BARBADOS BLVD., CASTLE HAYNE, NC, 28429
    MAP MILES This exhibit does not meet NC 47-30 requirements and therefore is not intended for design,
    2 0.14 construction, or recording or transfer of title.

    STATE SH STATE PROJECT REFERENCE NUMBER EET NO.
    NC 2026CPT.03.08.10311, ETC. 3 STATE PROJECT NUMBER DESCRIPTION
    MAP ROUTE DESCRIPTION TYPE
    3 SR-1378 / STOKES GOODING RD FROM NC HWY 11 TO SR 1380 (W BEST RD) [MP 0.00 - MP 2.74] Resurfacing
    PROJECT LENGTH Prepared in the Office of: Prepared in the Office of: DIVDISIVIIOSINO NO OFF H HIIGGHHWWAAYYSS 5501 BARB1A13D AOISR PBOLRVTD D., RC.,A ESDTELNET OHNA,Y NNCE 2,7 N93C2, 28429
    MAP MILES 3 2.74 B. N. BRASWELL, PE J. S. ABEL, JR. This exhibit does not meet NC 47-30 requirements and therefore is not intended for design, DIV. PROJ. DEVELOPMENT ENGINEER DIVISION PROJECT TEAM LEAD construction, or recording or transfer of title. C. E. SLACHTA D. H. STALLINGS DIVISION CONTRACT ENGINEER DIVISION DESIGN ENGINEER
    MAP MILES
    3 2.74

    STATE OF NORTH CAROLINA SHEET
    STATE STATE PROJECT REFERENCE NUMBER NO.
    NC 2026CPT.03.08.10311, ETC. 3 DIVISION OF HIGHWAYS
    STATE PROJECT NUMBER DESCRIPTION
    DUPLIN COUNTY
    TYPE OF WORK: RESURFACING
    Prepared in the Office of:
    PROJECT LENGTH DIVISION OF HIGHWAYS
    113 AIRPORT DR., EDENTON, NC 27932
    B. N. BRASWELL, PE J. S. ABEL, JR.
    DIV. PROJ. DEVELOPMENT ENGINEER DIVISION PROJECT TEAM LEAD
    C. E. SLACHTA D. H. STALLINGS
    DIVISION CONTRACT ENGINEER DIVISION DESIGN ENGINEER
    .CTE
    ,11301.80.30.TPC6202
    :ON
    SBW
    69400CD
    :TCARTNOC

    UV
    117 UV 403
    903
    117 Calypso
    UV
    Faison 111
    117
    UV
    Warsaw
    UV 11 UV Division 3 Bridges
    24 UV 111 UV
    50 241 Resurfacing
    I-40 Kenansville UV
    24
    Beulaville
    Magnolia UV UV
    UV UV 50 41 UV
    903 11 111
    117
    Greenevers
    Rose Hill
    UV
    SR-1380
    UV
    50
    Teachey 41
    4
    Harrells Wallace S R 0 0 1
    -1 -R
    3 7 S
    9
    UV
    SR-1378
    11
    MAP 3
    MAP ROUTE DESCRIPTION TYPE
    3 SR-1378 / STOKES GOODING RD FROM NC HWY 11 TO SR 1380 (W BEST RD) Resurfacing
    [MP 0.00 - MP 2.74]
    SR-1377
    SR-1376
    S
    R -1
    3
    3
    UV
    00068
    0
    1 11
    300459 300460
    300059 UV0 0.35
    903 Miles
    Kenansville
    Prepared in the Office of:
    DIVISION OF HIGHWAYS
    5501 BARBADOS BLVD., CASTLE HAYNE, NC, 28429
    MAP MILES This exhibit does not meet NC 47-30 requirements and therefore is not intended for design,
    3 2.74 construction, or recording or transfer of title.

    STATE STATE PROJECT REFERENCE NUMBER SHEET NO.
    NC 2026CPT.03.08.10311, ETC. 4 STATE PROJECT NUMBER DESCRIPTION
    MAP ROUTE DESCRIPTION TYPE
    4 SR-1711 / CHURCH RD FROM NC HWY 241 TO N NC HWY 41 [MP 0.00 - MP 3.63] Resurfacing
    PROJECT LENGTH Prepared in the Office of: Prepared in the Office of: DIVDISIVIIOSINO NO OFF H HIIGGHHWWAAYYSS 5501 BARB1A13D AOISR PBOLRVTD D., RC.,A ESDTELNET OHNA,Y NNCE 2,7 N93C2, 28429
    MAP MILES 4 3.63 B. N. BRASWELL, PE J. S. ABEL, JR. This exhibit does not meet NC 47-30 requirements and therefore is not intended for design, DIV. PROJ. DEVELOPMENT ENGINEER DIVISION PROJECT TEAM LEAD construction, or recording or transfer of title. C. E. SLACHTA D. H. STALLINGS DIVISION CONTRACT ENGINEER DIVISION DESIGN ENGINEER
    MAP MILES
    4 3.63

    STATE OF NORTH CAROLINA SHEET
    STATE STATE PROJECT REFERENCE NUMBER NO.
    NC 2026CPT.03.08.10311, ETC. 4 DIVISION OF HIGHWAYS
    STATE PROJECT NUMBER DESCRIPTION
    DUPLIN COUNTY
    TYPE OF WORK: RESURFACING
    Prepared in the Office of:
    PROJECT LENGTH DIVISION OF HIGHWAYS
    113 AIRPORT DR., EDENTON, NC 27932
    B. N. BRASWELL, PE J. S. ABEL, JR.
    DIV. PROJ. DEVELOPMENT ENGINEER DIVISION PROJECT TEAM LEAD
    C. E. SLACHTA D. H. STALLINGS
    DIVISION CONTRACT ENGINEER DIVISION DESIGN ENGINEER
    .CTE
    ,11301.80.30.TPC6202
    :ON
    SBW
    69400CD
    :TCARTNOC

    UV
    117 UV 403
    903
    117 Calypso
    UV
    Faison 111
    117
    UV
    Warsaw
    UV 11 UV Division 3 Bridges
    24 UV 111 UV
    50 241 Resurfacing
    I-40 Kenansville UV
    24
    Beulaville
    Magnolia UV UV UV
    UV UV 50 41 UV 241
    903 11 111
    117
    Greenevers
    Rose Hill
    UV
    UV
    50
    Teachey 41
    Harrells
    Wallace
    SR-1733
    300161
    0
    1
    7
    1
    R-
    S
    MAP 4
    S
    R
    -
    1
    7
    1
    S 2
    R
    UV - 1
    MAP ROUTE DESCRIPTION TYPE 7
    241 1
    1
    4 SR-1711 / CHURCH RD FROM NC HWY 241 TO N NC HWY 41 Resurfacing
    [MP 0.00 - MP 3.63]
    UV
    41
    SR-1714
    0 0.4
    Miles
    Prepared in the Office of:
    DIVISION OF HIGHWAYS
    5501 BARBADOS BLVD., CASTLE HAYNE, NC, 28429
    MAP MILES This exhibit does not meet NC 47-30 requirements and therefore is not intended for design,
    4 3.63 construction, or recording or transfer of title.

    STATE STATE PROJECT REFERENCE NUMBER SHEET NO.
    NC 2026CPT.03.08.10311, ETC. 5 STATE PROJECT NUMBER DESCRIPTION
    MAP ROUTE DESCRIPTION TYPE
    5 SR-1824 / LEM BROWN RD FROM SR 1715 (FOUNTAINTOWN RD) TO SR 1715 (FOUNTAINTOWN RD) [MP 0.00 - MP 0.83] Resurfacing
    PROJECT LENGTH Prepared in the Office of: Prepared in the Office of: DIVDISIVIIOSINO NO OFF H HIIGGHHWWAAYYSS 5501 BARB1A13D AOISR PBOLRVTD D., RC.,A ESDTELNET OHNA,Y NNCE 2,7 N93C2, 28429
    MAP MILES 5 0.83 B. N. BRASWELL, PE J. S. ABEL, JR. This exhibit does not meet NC 47-30 requirements and therefore is not intended for design, DIV. PROJ. DEVELOPMENT ENGINEER DIVISION PROJECT TEAM LEAD construction, or recording or transfer of title. C. E. SLACHTA D. H. STALLINGS DIVISION CONTRACT ENGINEER DIVISION DESIGN ENGINEER
    MAP MILES
    5 0.83

    STATE OF NORTH CAROLINA SHEET
    STATE STATE PROJECT REFERENCE NUMBER NO.
    NC 2026CPT.03.08.10311, ETC. 5 DIVISION OF HIGHWAYS
    STATE PROJECT NUMBER DESCRIPTION
    DUPLIN COUNTY
    TYPE OF WORK: RESURFACING
    Prepared in the Office of:
    PROJECT LENGTH DIVISION OF HIGHWAYS
    113 AIRPORT DR., EDENTON, NC 27932
    B. N. BRASWELL, PE J. S. ABEL, JR.
    DIV. PROJ. DEVELOPMENT ENGINEER DIVISION PROJECT TEAM LEAD
    C. E. SLACHTA D. H. STALLINGS
    DIVISION CONTRACT ENGINEER DIVISION DESIGN ENGINEER
    .CTE
    ,11301.80.30.TPC6202
    :ON
    SBW
    69400CD
    :TCARTNOC

    UV
    117 UV 403
    903
    117 Calypso
    UV
    Faison 111
    117
    UV
    Warsaw
    UV 11 UV Resurfacing
    24 UV 111 UV
    50 241
    I-40 Kenansville UV
    24
    Beulaville
    Magnolia UV UV
    UV UV 50 41 UV
    903 11 111
    117
    Greenevers
    Rose Hill
    UV
    UV
    50
    Teachey 41
    Harrells
    Wallace
    MAP 5
    SR-1824
    MAP ROUTE DESCRIPTION TYPE
    5 SR-1824 / LEM BROWN RD FROM SR 1715 (FOUNTAINTOWN RD) Resurfacing
    TO SR 1715 (FOUNTAINTOWN RD)
    SR-1715
    [MP 0.00 - MP 0.83]
    0 0.1
    Miles
    Prepared in the Office of:
    DIVISION OF HIGHWAYS
    5501 BARBADOS BLVD., CASTLE HAYNE, NC, 28429
    MAP MILES This exhibit does not meet NC 47-30 requirements and therefore is not intended for design,
    5 0.83 construction, or recording or transfer of title.

    SNOISIVER
    VV11 VV11 C1 C1
    EEXXIISSTTIINNGG BBRRIIDDGGEE DDEECCKK

    TYPICAL SECTION NO. 1
    MAP NO. 1 V1 MAP NO. 1
    FRIS MILL 1 1/2"
    NC 41
    MP 25.80 - MP 26.10
    MP 22.98 - MP 31.47
    VARIABLE MILLING AT 2'6" CURB & GUTTER
    AND CONCRETE SIDEWALK
    MILLING DETAIL
    0" - 1.5" MILLING WIDTH: 6'
    1.5" V2 R2 M.E.
    MILL TO THIS LINE
    EXISTING
    EXISTING PAVEMENT
    PAVEMENT
    SNOISIVER
    PROJECT REFERENCE NO. SHEET NO.
    $$$$$EMITSYS$$$$$$
    $$$$$$$$$$$$$$$$NGD$$$$$$$$$$$$$$$$
    99/71/8
    $$$$EMANRESU$$$$
    2026CPT.03.08.10311 6
    24' - 28'
    VVAARR.. VVAARR..
    PAVEMENT SCHEDULE
    PROP. APPROX. 112" DEPTH ASPHALT CONCRETE SURFACE COURSE,
    C1
    TYPE S9.5C, AT AN AVERAGE RATE OF 168 LBS. PER SQ.YD.
    V3 PROP. APPROX. 112" DEPTH ASPHALT CONCRETE SURFACE COURSE,
    V4 C1 C1 V4 C2 TYPE S9.5B, AT AN AVERAGE RATE OF 165 LBS. PER SQ.YD.
    M.E. M.E.
    T1 T1 R1 EXISTING BRIDGE BARRIER RAIL
    EXISTING PAVEMENT
    R2 EXISTING 2'-6" CURB & GUTTER
    U U
    T1 EARTH MATERIAL SHOULDER RECONSTRUCTION
    U EXISTING PAVEMENT
    V1 MILLNG ASPHALT PAVEMENT, 112" DEPTH
    V2 0" - 1 2 1" VARIABLE MILLING
    3300'' -- 3311''
    V3 14" SINUSOIDAL MILLED RUMBLE STRIPE, CENTERLINE
    V4 8" SINUSOIDAL MILLED RUMBLE STRIP, SHOULDER
    R1 RR11 NOTES: MILL A SINGLE LANE AND PAVE BACK
    VV11 VV11 BY THE END OF EACH WORK DAY.
    C1 C1
    SHOULDER WORK ON MAP NO. 1-5 AS
    NEEDED, TO BE DETERMINED BY ENGINEER.
    EEXXIISSTTIINNGG BBRRIIDDGGEE DDEECCKK
    THE CONTRACTOR SHALL RETAIN EXISTING
    UU UU
    TOWN OF BEULAVILLE T
    .) LANE WIDTHS.
    TYPICAL SECTION NO. 2 S
    O N REINSTALL PAVEMENT MARKINGS PER 2024
    S
    K
    C STANDARDS.
    MAP NO. 1 A
    .
    J
    NC 41 1 (N MAP NO. 1 - NO GRINDING SHALL BE
    4
    BRIDGE NO. 074 Y PERMITTED ON CONCRETE BRIDGE DECK PROJECT LIMIT W
    H
    MP 25.62 - MP 25.66 FOR DUPLIN BRIDGE NO. 065.
    PAVEMENT EDGE SLOPES ARE 1:1, EXCEPT FINAL
    PROJECT LIMIT SURFACE COURSE. SEE SHOULDER WEDGE DETAIL.
    HWY 24 (W. MAIN ST.)
    HWY 24 (E. MAIN ST.)
    .)
    T
    S
    MAP 1: NC 41 - MP 30.91 - MP 31.47 O N
    S
    K
    C
    A PROJECT LIMIT
    INCIDENTAL MILLING DETAIL FOR BRIDGE APPROACHES .
    J
    1
    (S
    100' NO MILLING 2' PRIOR Y
    4
    TO BRIDGE JOINT W
    U 1 A P 12 P " R M O I A L C L H IN S G L A O B N 2' BRIDGE JOINT H
    EXISTING BRIDGE DECK
    0"MILL EXISTING CONCRETE MAP 1: HWY 41 (JACKSON ST.) & HWY 24 (MAIN ST.)
    APPROACH SLAB EXTEND MILLING & RESURFACING LIMITS THROUGH
    INTERSECTION ONTO HWY 41 (N. JACKSON ST) &
    MAP 1: BRIDGE #065 - NC 41 - MP 22.98
    HWY 24 (E. & W. MAIN ST.) TO EXISTING JOINTS

    H ASPHALT CONCRETE SURFACE COURSE RAGE RATE OF 168 LBS. PER SQ.YD.
    HH AASSPPHHAALLTT CCOONNCCRREETTEE SSUURRFFAACCEE CCOOUURRSSEE RRAAGGEE RRAATTEE OOFF 116655 LLBBSS.. PPEERR SSQQ..YYDD..
    ER RAIL
    DER RECONSTRUCTION
    ENT, 112" DEPTH

    PAVEMENT SCHEDULE
    T1 EARTH MATERIAL SHOULDER RECONSTRUCTION
    U EXISTING PAVEMENT
    SNOISIVER
    $$$$$EMITSYS$$$$$$
    $$$$$$$$$$$$$$$$NGD$$$$$$$$$$$$$$$$
    99/71/8
    $$$$EMANRESU$$$$
    PROJECT REFERENCE NO. SHEET NO.
    26' 2026CPT.03.08.10311, ETC. 7
    VVAARR.. VVAARR..
    PROP. APPROX. 112" DEPTH ASPHALT CONCRETE SURFACE COURSE,
    C1
    TYPE S9.5C, AT AN AVERAGE RATE OF 168 LBS. PER SQ.YD.
    C1 C1
    M.E. M.E. CC22 PPRROOPP.. AAPPPPRROOXX.. 111212"" DDEEPPTTHH AASSPPHHAALLTT CCOONNCCRREETTEE SSUURRFFAACCEE CCOOUURRSSEE,,
    T1 T1 TTYYPPEE SS99..55BB,, AATT AANN AAVVEERRAAGGEE RRAATTEE OOFF 116655 LLBBSS.. PPEERR SSQQ..YYDD..
    EXISTING PAVEMENT R1 EXISTING BRIDGE BARRIER RAIL
    U U
    TYPICAL SECTION NO. 3
    MAP NO. 2
    N NC 111 HWY
    MP 15.20 - MP 15.06 V1 MILLNG ASPHALT PAVEMENT, 112" DEPTH
    NOTES: MILL A SINGLE LANE AND PAVE BACK
    20' - 22'
    VVAARR.. VVAARR.. BY THE END OF EACH WORK DAY.
    SHOULDER WORK ON MAP NO. 1-5 AS NEEDED,
    TO BE DETERMINED BY ENGINEER.
    THE CONTRACTOR SHALL RETAIN EXISTING
    C2 C2
    M.E. M.E. LANE WIDTHS.
    T1 T1
    REINSTALL PAVEMENT MARKINGS PER 2024
    EXISTING PAVEMENT
    STANDARDS.
    U U
    PAVEMENT EDGE SLOPES ARE 1:1, EXCEPT FINAL
    TYPICAL SECTION NO. 4
    SURFACE COURSE. SEE SHOULDER WEDGE DETAIL.
    MAP NO. 3 MAP NO. 4
    SR 1378 (STOKES GOODING RD) SR 1711 (CHURCH RD)
    MP 0.00 - MP 2.74 MP 0.00 - MP 3.63
    MAP NO. 5
    SR 1824 (LEM BROWN RD)
    MP 0.00 - MP 0.83
    3300'' -- 3311''
    RR11 RR11
    VV11 VV11
    CC22 CC22
    EEXXIISSTTIINNGG BBRRIIDDGGEE DDEECCKK
    UU TYPICAL SECTION NO. 5 UU
    MAP NO. 4
    SR 1711 (CHURCH RD)
    BRIDGE NO. 161
    MP 0.76 - MP 0.77

    PROJECT REFERENCE NO. SHEET NO.
    026CPT .03.08.10311, ETC. 8
    c,lil
    _,.
    u,
    < .... --
    c
    l:!
    Ji!I.,,
    i EXISTING PAVEMENT COURSE
    1!1*1'
    GENERAL NOTES: ..
    ;

    =1il l.... "*ii LUSE RAPID SET GROUT, MORTAR, OR CONCRETE THAT .}
    :*-:_
    -
    :
    /
    \
    :
    :
    =_ .
    * : "*
    .,, C
    u
    ...

    -
    . I -Iii :Z::
    WILL TAKE FULL SET AND BECOME LOAD BEARING -!111
    ;:I WITHIN SIXTY MINUTES OF PLACEMENT WITH A 8" MIN. CONC. 24" --
    l- i!I
    MINIMUM COMPRESSIVE STRENGTH OF 4000 PSI.
    =
    2. REMOVE ALL FAULTY EXISTING BRICKWORK AND
    i
    REPLACE WITH NEW BRICK MASONRY.
    A,
    l!l-
    -->a
    3. SHEER CUT EXCAVATION FOR THE ADJUSTMENT
    ....
    ON ALL SIDES.
    B 4. FILL AREA BELOW 8" DEPTH WITH 78M OR BRICK MASONRY OR z

    > NO. 57 CLEAN STONE. PRECAST CONCRETE I.LI
    er w z J> 5. MIX MORTAR TO 12 N " CDO 1/s T " SPECIFICATIONS. MANHOLE :E....
    5. MORTAR JOINTS +/-
    (I)
    0
    r G: -, ::::,
    rr, Ill z MANHOLE CONCRETE ENCASEMENT 0
    ' II. C
    -
    r- <E
    z
    J> Qz -
    )(
    0 I
    0
    m
    < G:
    Ill.... a
    PROPOSED SURFACE COURSE
    r J> - - I.LI
    ..J .>.
    <
    r-
    C ...I
    rr,
    <E
    l!!I >
    m
    -
    0 C -:z:: C
    )( 8" MIN. CONC. u, z
    ..J <E
    J> BOX
    0 "'II
    Qz
    c.. 0 :a Ill I.LI ...I
    C
    0
    (I)
    --1 VALVE BOX CONCRETE ENCASEMENT z
    <E
    rr,
    z :E
    --1 ELEVATION VIEW
    PLACE BRICK ACCORDING TO ELEVATION VIEW
    "'
    "'
    "'
    "'
    "'
    "'
    "'
    "'
    "'
    "'
    "'
    "'
    "'
    "'
    "'
    ..
    ,.o,,,
    ""'
    ""'
    ""'
    W(f>
    :!;(I>
    i="'
    ..
    :"'..
    >-
    (/)
    .. ..,,,
    ,,,
    :;: " .. "',,, ,,,

    PROJECT REFERENCE NO. SHEET NO.
    026CPT .03.08.10311, ETC 9
    DETAILS OF REPAIRING EXISTING PAVEMENT PRIOR
    TO RESURFACING FOR FULL DEPTH AND MILLING
    LENGTH & WIDTH VARIES
    EXISTING ASPHALT PAVEMENT
    r
    EXISTING SUBGRADE MATERIAL
    EXISTING ASPHALT PAVEMENT BASE AND/OR SUBGRADE MATERIAL
    TO BE REMOVED AND REPLACED WITH BASE COURSE, INTERMEDIATE
    COURSE OR SURFACE COURSE OR A COMBINATION OF BASE, INTERMEDIATE
    AND SURFACE COURSE, AND PAVEMENT REMOVAL, AS DIRECTED BY
    THE ENGINEER.
    DETAIL NO. 1
    LENGTH & WIDTH EXISTING ASPHALT PAVEMENT
    EXISTING SUBGRADE MATERIAL
    SAW AND REMOVE EXISTING ASPHALT PAVEMENT TO NEAT LINES AND REMOVE
    (/Jz E
    C
    X
    O
    I
    U
    S
    R
    TI
    S
    N
    E
    G
    , I
    L
    N
    O
    T
    O
    E
    S
    R
    E
    M E
    B
    D
    A
    I
    S
    A
    E
    TE
    A N
    C
    D
    O
    /
    U
    O
    R
    R
    S
    S
    E
    U
    , O
    BG
    R
    R
    S
    A
    U
    D
    R
    E
    F A
    M
    C
    A
    E
    T E
    C
    R
    O
    IA
    U
    L
    R S
    A
    E
    N
    O
    D
    R
    R E
    A
    P
    C
    L
    O
    A
    M
    CE
    BI
    W
    NA
    IT
    T
    H
    IO
    B
    N
    A
    O
    S
    F
    E
    BASE, INTERMEDIATE AND SURFACE COURSE, AND PAVEMENT REMOVAL,
    (/J ;: AS DIRECTED BY THE ENGINEER.
    LJ.J
    a:
    DETAIL NO. 2
    LENGTH & WIDTH EXISTING ASPHALT PAVEMENT
    VARIES
    EXISTING BASE
    EXISTING SUBGRADE MATERIAL
    SAW AND REMOVE EXISTING BROKEN-UP ASPHALT PAVEMENT
    TO NEAT LINES AND REPLACE WITH SURFACE COURSE,
    AS DIRECTED BY THE ENGINEER
    DETAIL NO. 3
    LENGTH & WIDTH VARIES
    EXISTING ASPHALT PAVEMENT
    EXISTING BASE
    EXISTING SUBGRADE MATERIAL
    OVERLAY PAVEMENT WITH 1" -2" SURFACE COURSE
    AS DIRECTED BY THE ENGINEER.
    DETAIL NO. 4
    -
    .. .... LENGTH & WIDTH VARIES
    ...,
    EXISTING ASPHALT PAVEMENT
    ...,
    ....
    ..
    ..
    EXISTING BASE
    .....,
    ..
    ..
    ..z.. EXISTING SUBGRADE MATERIAL
    .... .... .... OVERLAY PAVEMENT WITH LEVELING COURSE
    ..
    "'"' AS DIRECTED BY THE ENGINEER .
    ,,.,
    i=u,
    "'>-..
    :
    ., .,"'
    DETAIL NO. 5
    ..
    5..:
    ....
    ..

    PROJECT REFERENCE NO. SHEET NO. 2026CPT.03.08.10311, ETC. 10 NOTES: 1) DETAIL DOES NOT APPLY TO OGAFC AND ULTRA-THIN BONDED WEARING COURSE. ASPHALT OVERLAY 2) BACKFILL SHOULDER WITH APPROVED MATERIAL. 3) THE SHOULDER WEDGE DEVICE MAY BE DISENGAGED AT PAVED DRIVEWAYS, SIDE STREETS, HIGH SHOULDERS, AND OTHER LOCATIONS NOT FEASIBLE TO CONSTRUCT AS APPROVED BY THE ENGINEER. SHOULDER WEDGE a a APPROVED BACKFILL MATERIAL EXISTING UNIMPROVED SHOULDER PROPOSED PAVEMENT SHOULDER WEDGE DETAIL ASPHALT OVERLAY (Resurfacing Projects w/ Widening or with Existing Paved Shoulder having no dropoffs) SHOULDER WEDGE a a APPROVED BACKFILL MATERIAL EXISTING UNIMPROVED SHOULDER ASPHALT OVERLAY EXISTING PAVEMENT SHOULDER WEDGE a SHOULDER WEDGE DETAIL (Resurfacing Projects w/ NO Widening) APPROVED BACKFILL MATERIAL DROP OFF a EXISTING UNIMPROVED SHOULDER W/ RUTTING EXISTING PAVEMENT - SHOULDER WEDGE ANGLE = 30 degrees RUT CONTRACT STANDARDS AND DEVELOPMENT UNIT Office 919-707-6950 FAX 919-250-4119 SHOULDER WEDGE DETAIL SHOULDER WEDGE DETAILS (Resurfacing Adjacent to EFERENCE NO. SHEET NO. 8.10311, ETC. 10
    LOPMENT UNIT 50 FAX 919-250-4119 ER WEDGE TAILS

    PROJECT REFERENCE NO. SHEET NO.
    ASPHALT OVERLAY
    a
    a
    EXISTING UNIMPROVED
    SHOULDER
    CONTRACT STANDARDS
    AND DEVELOPMENT UNIT
    Office 919-707-6950 FAX 919-250-4119
    ORIGINAL BY: T.SPELL DATE: 7-19-11
    MODIFIED BY: DATE:
    CHECKED BY: DATE:
    FILE SPEC.:
    25:31
    8102-NUJ-72
    ngd.liateD
    egdeW
    redluohS
    desiveR\8102
    tsuguA
    nospmaS\3
    noisiviD\stcejorP
    gnicafruseR!\stcartnoC\stcartnoC\:S
    295292-DSC
    TA
    retropjp
    2026CPT.03.08.10311, ETC. 10
    NOTES:
    1) DETAIL DOES NOT APPLY TO OGAFC AND ULTRA-THIN BONDED WEARING COURSE.
    2) BACKFILL SHOULDER WITH APPROVED MATERIAL.
    3) THE SHOULDER WEDGE DEVICE MAY BE DISENGAGED AT PAVED DRIVEWAYS, SIDE STREETS,
    HIGH SHOULDERS, AND OTHER LOCATIONS NOT FEASIBLE TO CONSTRUCT AS
    APPROVED BY THE ENGINEER.
    SHOULDER WEDGE
    APPROVED BACKFILL
    MATERIAL
    PROPOSED PAVEMENT
    SHOULDER WEDGE DETAIL
    ASPHALT OVERLAY
    (Resurfacing Projects w/ Widening or
    with Existing Paved Shoulder having no dropoffs)
    SHOULDER WEDGE
    a
    a APPROVED BACKFILL
    MATERIAL
    EXISTING UNIMPROVED
    SHOULDER
    ASPHALT OVERLAY
    EXISTING PAVEMENT
    SHOULDER WEDGE
    a
    SHOULDER WEDGE DETAIL
    (Resurfacing Projects w/ NO Widening)
    APPROVED BACKFILL
    MATERIAL
    DROP OFF
    a
    EXISTING UNIMPROVED
    SHOULDER W/ RUTTING
    EXISTING PAVEMENT - SHOULDER WEDGE ANGLE = 30 degrees
    RUT
    SHOULDER WEDGE DETAIL SHOULDER WEDGE
    DETAILS
    (Resurfacing Adjacent to
    Rutted Shoulder)
    2/2/16
    s:usr/details/stand/shoulderwedgedetail.dgn

    This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
    Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL

    See also

    Follow Multiple Building Fire Exhaust Systems Repairs Active Contract Opportunity Notice ID N4008526R9059

    DEPT OF DEFENSE

    Bid Due: 8/05/2026

    Follow 43d Air Mobility Squadron_ Request for Proposal_FA445226R0012_B753 Kitchen Renovation Active Contract Opportunity

    DEPT OF DEFENSE

    Bid Due: 8/05/2026

    Follow Multiple Base-wide Location Fencing Repairs Active Contract Opportunity Notice ID N4008524R9072 Related

    DEPT OF DEFENSE

    Bid Due: 8/20/2026

    Project: Federal Pipe Video Contracts Ref. #: 269- 2026-235 Department: City Procurement Type:

    City of Charlotte

    Bid Due: 8/24/2026

    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.