| Location: | California |
|---|---|
| Posted: | Sep 8, 2025 |
| Due: | Sep 23, 2025 |
| Agency: | INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 191BWC26R0001 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The USIBWC intends to issue a solicitation for a firm-fixed-price, cost-reimbursable, or hybrid non-personal services contract for the full-service operation and maintenance (O&M) of the South Bay International Wastewater Treatment Plant (SBIWTP) and associated facilities in San Diego County, California. These facilities include canyon collectors, pump stations, and the South Bay Land Outfall (SBLO).
The Contractor shall furnish all labor, materials, equipment, supervision, and other resources necessary to perform comprehensive O&M services. These services include, but are not limited to:
FACILITY BACKGROUND
The SBIWTP was a 25 million gallon per day (MGD) wastewater treatment facility located at 2995 Clearwater Way, San Diego, CA. The plant treats wastewater originating in Tijuana, Baja California, Mexico, and discharges effluent through the South Bay Ocean Outfall (SBOO) under NPDES Permit No. CA0108928 (Order No. R9-2023-0009).
EXPANSION PROJECT COORDINATION
In 2024, USIBWC awarded a $600 million Progressive Design-Build (PDB) contract to PCL Construction, with Stantec Consulting Services, Inc. as the design firm. The project aims to expand plant capacity to 60 MGD by 2027. The selected O&M contractor will be required to coordinate closely with the PDB team throughout the expansion and rehabilitation phases.
As of August 28, 2025, the plant’s capacity has been increased to 35 MGD. Further incremental expansions (e.g., 10–20 MGD) are planned, with a final target of 60 MGD. The O&M contract will be modified as needed to reflect evolving requirements during the expansion.
PERIOD OF PERFORMANCE
| Mar 6, 2026 | [Special Notice (Original)] Operation & Maintenance of the South Bay Wastewater Treatment Plant |

With GovernmentContracts, you can:
Follow Install Water Softener and Hot Water Heaters at FCI Mendota Active Contract
JUSTICE, DEPARTMENT OF
Bid Due: 6/17/2026
Follow Repair ADM Baker Pool Complex Active Contract Opportunity Notice ID NAVMWR-26-R-0029 Related
DEPT OF DEFENSE
Bid Due: 6/05/2026
Project ID: MHC/039 Title: ATLAS (Access, Treatment, Linkage, and Stabilization): Integrated Children's Specialty
Sacramento County
Bid Due: 6/10/2026
CDBG 602748-25 - Sidewalk ADA Ramps Project (6-03-26) 1 Item(s)
City of Lawndale
Bid Due: 6/03/2026