PROJECT DOCUMENTS
and
BIDDING SPECIFICATIONS
for
Old Central Fluid Applied Roof Coating
MANDATORY PRE-BID MEETING:
TIME: 10:00 AM
DATE: April 16, 2026
PLACE: Old Central 109 North Birch Street, Owasso, Oklahoma 74055
Set No.1
SECTION
1
2
3
4
5
6
7
8
TABLE OF CONTENTS
TITLE
Advertisement for Bids ....................................................................................
Requirements for Bid Submittal........................................................................
Bidder’s Instructions……...................................................................................
Bid Submittal.......................................................................................................
State of Bidder’s Qualifications .......................................................................
Certificate of Non-Discrimination and Non-Collusion...................................
Agreement and General Conditions with Exhibits........................................
Project Specifications .......................................................................................
SECTION 1 -ADVERTISEMENT FOR BIDS
Bids for Old Central OCR Roof Replacement, and all appurtenances, will be received by
the City of Owasso until 5:00 PM on April 30, 2026.
A mandatory pre-bid conference will be held at Old Central 109 N Birch St , Owasso,
Oklahoma 74055, at 10:00 AM on April 16, 2026.
The work is generally described as the application of Fluid Applied Roof System.
The City of Owasso may waive any informalities or minor defects or reject any and all
bids. Should there be reasons why the contract cannot be awarded within the specified
period, the time may be extended by mutual agreement between the City and the
Bidder.
All forms are included. Bidders shall submit Documents as noted in Section 2,
Requirements for Bidders. Bidders who submit bid form only will be rejected.
The Project Documents may be examined on the City’s website at
www.cityofowasso.com or at the following location:
Owasso City Hall
200 South Main
Owasso, OK 74055
(918) 376-1500
Copies of the PROJECT DOCUMENTS may be purchased at Owasso City Hall upon
payment of Eleven Dollars ($11.50) for each set, which is the cost of reproduction and will
NOT be refunded.
SECTION 2 - REQUIREMENTS FOR BID SUBMITTAL
Failure to submit all of the items called for may render the bid proposal incomplete, thus
eliminating the bidder from further consideration.
Required documents are:
Bid Submittal Form
Statement of Bidder's Qualifications
Non-Collusion Certificate
Certificate of Non-Discrimination
SECTION 3 – BIDDER’S INSTRUCTIONS
1. PURPOSE
The purpose of these Specifications is to provide for Old Central Roof coating for the City
of Owasso, Oklahoma. The CONTRACTOR is to provide all material and labor for
construction and completion in every detail the work described.
The Project Manual, Plans, and Details included herein, along with other relevant local,
state, and federal codes, shall prevail as guidelines throughout said project until it is
completed.
2. DEFINED TERMS
Terms used in these Instructions to Bidders, which are defined in the Standard General
Conditions of the Construction Contract, have the meanings assigned to them in the
General Conditions.
3. QUALIFICATIONS OF BIDDERS
Bidders shall complete "Statement of Bidder's Qualifications" and submit with their bid
proposal.
A Mandatory pre-bid conference will be held for this project as advertised.
4. EXAMINATION OF PROJECT DOCUMENTS AND SITE
4.1 Before submitting bid, each Bidder must: (a) Examine the Project Documents,
to include the Agreement and General Conditions, thoroughly; (b) Visit the site
to familiarize himself/herself with local conditions that may in any manner
affect cost, progress or performance of the work; (c) Familiarize himself/herself
with federal, state and local laws, ordinances, rules and regulations that may
in any manner affect cost, progress, or performance of the Work; and (d) Study
and carefully correlate Bidder's observations with the Project Documents.
4.2 Before submitting a bid, each Bidder may, at Bidder’s own expense, make such
additional investigations and tests as the Bidder may deem necessary to
determine the Bid for performance of work in accordance with the time, price
and other terms and conditions of the Project Documents.
4.3 Copies of documents pertaining to exploration and tests of subsurface
conditions at the site, used in preparing the Project Documents, are available
upon written request to the OWNER. The Bidder shall be held solely responsible
for any interpretation or conclusion drawn from this technical data.
4.4 The submission of a Bid will constitute an incontrovertible representation by the
Bidder that he/she has complied with every requirement and the Project
Documents are sufficient in scope and detail to indicate and convey
understanding of all terms and conditions for performance of the Work. No
conditional bids are to be accepted.
5. INTERPRETATIONS
5.1 All questions about the meaning or intent of the Project Documents shall be
submitted in writing to the City of Owasso Facilities Maintenance Division, Attn:
Jennifer Morgans via email (jmorgans@cityofowasso.com) or mail addressed
to 452 South Main Street, Owasso, Oklahoma, 74055. Replies will be issued by
Addenda, posted on the City’s website at www.cityofowasso.com, no later
than five days before the bid acceptance deadline
5.2 Each Bidder shall be responsible for determining receipt of all Addenda issued.
6. CONSTRUCTION TIME
The construction contract time for this project is thirty (30) calendar days until
substantial completion, and the time is thirty (30) calendar days in which to be
completed and ready for final payment. Time extensions may be granted by the
OWNER for delays considered beyond the CONTRACTOR's control.
7. SUBSTITUTE MATERIAL AND EQUIPMENT
The Contract, if awarded, will be on the basis of material and equipment described
in the Plans and Details or specified in the Specifications without consideration of
possible substitute or "or-equal" items. Whenever it is indicated in the Plans and
Details or specified in the Specifications that a substitute or "or- equal" item of
materials may be furnished or used by the CONTRACTOR, if acceptable to OWNER,
application for such acceptance will not be considered by OWNER until after the
"effective date of the Agreement". The procedure for submittal of any such
application by CONTRACTOR and consideration by OWNER is set forth in the
General Conditions, which may be supplemented in the General Requirements.
8. SUBCONTRACTORS, ETC.
8.1 If the Project Specifications require, the identity of certain SubCONTRACTORs,
supplies and manufacturers must be submitted to OWNER with submittal of
proposal.
8.2 In contracts where the Contract Price is based on a lump sum price, the
apparent Successful Bidder, prior to the Notice of Award, shall identify in writing
to OWNER those portions of the work that Bidder proposes to
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.