| Location: | Texas |
|---|---|
| Posted: | May 7, 2025 |
| Due: | Jun 6, 2025 |
| Agency: | City of Dallas |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | CIZ-DWU-24 005 |
| Publication URL: | To access bid details, please log in. |
Project Description: Installation of 32 Linear Feet of steel pipe including a 66-inch butterfly valve, steel water main pipe and closure in two locations in Carrollton and one location in Farmers Branch. The project also includes reinforced concrete thrust restraint and associated access manholes. This will include the removal of 32 Linear Feet of 66-inch Prestressed Concrete Cylinder Pipe water main. Plans, Specifications and Bid Proposal will be available on Bonfire at https://dallascityhall.bonfirehub.com/ on Friday, May 9, 2025. Project Manager: Matt Stevens, PE

With GovernmentContracts, you can:
...Last Modified: 7/27/2026 11:27 am Class/Item Code: 65880-Pipe, Steel, Stainless Steel and Wrought... ...
State Government of Texas
Bid Due: 9/04/2026
...: Open Description: Structural design of the sign support, its foundation, and the ...
City of Sherman
Bid Due: 8/11/2026
...specifications. The work to be performed under this contract consists of furnishing all ...
City of Irving
Bid Due: 8/21/2026
...will typically involve large diameter (24-inch and larger) assets, concrete steel cylinder pipe...
City of Austin
Bid Due: 9/03/2026