Biltmore Hills Community Center – HVAC Replacement

Location: North Carolina
Posted: Mar 18, 2025
Due: Apr 17, 2025
Agency: State Government of North Carolina
Type of Government: State & Local
Category:
  • 70 - General Purpose Information Technology Equipment (including software).
  • Y - Construction of Structures and Facilities
Solicitation No: 274-ES-FO-FY25-BILTMOREHILLSHVAC
Publication URL: To access bid details, please log in.
Solicitation Number: 274-ES-FO-FY25-BILTMOREHILLSHVAC
Project Title: Biltmore Hills Community Center – HVAC Replacement
Description: 1. Remove existing 25-ton R-22 air handling unit and condensing unit and replace with new. Remove all associated refrigerant line sets and replace with new. Connect to existing ductwork within the limits of the existing mechanical room. 2. Integrate new condensing unit and air handling unit into building automation system. 3. Provide new variable frequency drive for new air handling unit. 4. Provide new duct mounted CO2, humidity, and smoke detector for air handling unit and integrate back into building automation system and fire alarm. 5. Provide new motorized dampers for relief, return, and outside air control for economizing. 6. Provide new hot water piping control valves and coil connection for air handling unit hot water coil. Integrate new control valves into building automation system. 7. Provide new heavy duty fusible disconnect for condensing unit/air handling unit and connect to existing power. 8. Provide pre/post-construction test and balance. 9. Provide new Vykon JACE 9000. 10. Provide new Bacnet IP controllers for existing vav terminals, (2) packaged units, and boiler plant.
Opening Date: 4/17/2025 2:00 PM
Posted Date: 3/19/2025
Status: Open
Department: CITY OF RALEIGH
Solicitation Number
*
274-ES-FO-FY25-BILTMOREHILLSHVAC
Department
CITY OF RALEIGH
Status Reason
Open
Opening Date
2025-04-17T14:00:00.0000000
Posted Date
*
2025-03-18T19:22:29.0000000Z
Commodity Code
Distribution and conditioning system equipment maintenance and repair services
Mandatory Conference/Site Visit
2025-04-01T04:00:00.0000000Z
Special Instructions
Contact: Steven.Chelini@raleighnc.gov
Description
1. Remove existing 25-ton R-22 air handling unit and condensing unit and replace with new. Remove all associated refrigerant line sets and replace with new. Connect to existing ductwork within the limits of the existing mechanical room. 2. Integrate new condensing unit and air handling unit into building automation system. 3. Provide new variable frequency drive for new air handling unit. 4. Provide new duct mounted CO2, humidity, and smoke detector for air handling unit and integrate back into building automation system and fire alarm. 5. Provide new motorized dampers for relief, return, and outside air control for economizing. 6. Provide new hot water piping control valves and coil connection for air handling unit hot water coil. Integrate new control valves into building automation system. 7. Provide new heavy duty fusible disconnect for condensing unit/air handling unit and connect to existing power. 8. Provide pre/post-construction test and balance. 9. Provide new Vykon JACE 9000. 10. Provide new Bacnet IP controllers for existing vav terminals, (2) packaged units, and boiler plant.
Attachments
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.