| Location: | Utah |
|---|---|
| Posted: | Feb 20, 2025 |
| Due: | Mar 27, 2025 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | WCWCD-000005 |
| Publication URL: | To access bid details, please log in. |
Project Description: **The Issuing Office for the Bidding Documents is: Washington County Water Conservancy District
The Washington County Water Conservancy District (district) is accepting Separate sealed bids (hard copies) for the Quail Creek Water Treatment Plant 90 mgd Expansion and Ozone Addition – Phase 1 (Project) will be received by Washington County Water Conservancy District at its office at 533 East Waterworks Drive, St. George, Utah 84770, until no later than 2:00 PM, Thursday, March 27, 2025. At that time bids will be publicly opened and read aloud.
The Project consists of process mechanical improvements at the existing Flow Control Building, Dissolved Air Flotation (DAF) Building, Filter Building, and Reclaim Pump Station. New piping, valves, actuators, and flow meters will be installed at the Flow Control Building to reduce headloss at increased plant flows. The existing DAF will be rerated from 40 mgd to 60 mgd and new recycle pumps, compressors, piping, and valves will be installed to accommodate increased DAF recycle flows. New filter inlet and waste backwash outlet valves and actuators will be installed at the Filter Building to replace existing aging valves. New pumps, piping, and valves will be installed at the Reclaim Pump Station to convey recycle water at increased plant flows.
The project is located at the Quail Creek Water Treatment Plant at 270 N 5300 W, Hurricane, UT (approximately 10 miles northwest of St. George, Utah).
Contact Hazen and Sawyer (Attn: Jeremy Williams) at (385) 342-1082 or jswilliams@hazenandsawyer.com to be placed on the plan holders list and to obtain copies of the bidding document. Bidders must be on the plan holders list to submit a bid. Copies of the Contract Documents and Specifications are available for free via email.
Questions: Hazen and Sawyer (Attn: Jeremy Williams) at (385) 342-1082 or jswilliams@hazenandsawyer.com
Submission: Will only be accepted by Separate sealed bids (hard copies) at Washington County Water Conservancy District at its office at 533 East Waterworks Drive, St. George, Utah 84770.
Pre-bid Conference: A mandatory pre-bid conference and site visit will be held at the Quail Creek Water Treatment Plant located at 270 N 5300 W, Hurricane, Utah, on Thursday March 6, 2025, at 10:00 AM. Any bidder not attending the pre-bid conference will be considered non-responsive.
This courtesy posting is an advertisement of a procurement opportunity for Washington County Water Conservancy District, not the Division of Purchasing. Responses should be directed to the designated individual/office as designated in the solicitation document. The contract award for this solicitation will not be posted on this website. Instead, you will need to contact the designated individual/office as identified in the solicitation document.
This solicitation posting will be canceled/closed upon the closing date of this solicitation; however, a vendor’s response will still be evaluated by Washington County Water Conservancy District as described in the solicitation document. The Division of Purchasing is neither the issuing or conducting procurement unit for this solicitation, as such it is the vendor's responsibility to review the entire solicitation in order to comply with any requirements.

With GovernmentContracts, you can: