| Location: | Georgia |
|---|---|
| Posted: | Feb 20, 2025 |
| Due: | Apr 4, 2025 |
| Agency: | City of Sandy Springs |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25-034 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project includes the construction of sidewalk on Evergreen Drive from existing sidewalk at Greenwood Close to Peachtree Dunwoody Road (S2164). The western terminus of the project includes a rapid flashing beacon and crosswalk with associated pavement markings to connect sidewalk on the north and south side of Evergreen Drive. The project will install approximately 570 LF of sidewalk, reconstruction of driveway transitions, drainage system including but not limited to 9 LF of 24” RCP with one (1) drop inlet, and construction of one gravity wall, and other associated improvements.

With GovernmentContracts, you can:
Follow Cross Over Network Waveguide Assembly Qualification and Production (P/Ns G638416-1) Active Contract
DEPT OF DEFENSE
Bid Due: 11/18/2026
Follow Repair/Overhaul of Flat Panel Up Front Controller (FPUFC) Active Contract Opportunity Notice
DEPT OF DEFENSE
Bid Due: 11/25/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-33658-NONST-2027-000000006
State Government of Georgia
Bid Due: 11/23/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-77035-NONST-2027-000000047
State Government of Georgia
Bid Due: 11/19/2026